Project overview

Swastik Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700028436. Swastik Heights is located at 421201. This is a New Project being developed by Ashok Singh.

Swastik Heights has 1 BHK & 1RK Apartments with carpet areas ranging from 291 to 434 Sq.ft. Carpet. The Project has total 77 of which 36 are currently available for sale.

Swastik Heights is being developed on a total land area of 9677 Sq.ft. Swastik Heights has 2 Wings / Towers D Wing,E Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swastik Heights
  • Location:
  • 421201
  • Const. Stage:
    New Project
  • Possession:
    30 Sep 2022
Developer Details

  • Developer:
    Ashok Singh
  • Phone:
  • Address:
  • Shop No 1/2, Swastik Heights, Retibunder Road, Kalyan/Dombivali, Dombivali West, 421202
Project RERA Details
MAHA REARA No: P51700028436
Project Type Residential
RERA Project Status New Project
Architect Design Mark &Amp; Associates
Funding Bank NKGSB CO OP BANK LTD
Proposed Possession 30 Sep 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 13 Jan 2023
Last Retrived 28 Jul 2025
Swastik Heights QR Code
Swastik Heights
MahaRERA - P51700028436
Apartment Details & Configuration
TypeArea
1 BHK30.5 Sq.mts. ( 328 Sq.ft. )
1 BHK32.1 Sq.mts. ( 346 Sq.ft. )
1 BHK33.34 Sq.mts. ( 359 Sq.ft. )
1RK22.92 Sq.mts. ( 247 Sq.ft. )
1 BHK34.36 Sq.mts. ( 370 Sq.ft. )
1 BHK37.19 Sq.mts. ( 400 Sq.ft. )
1 BHK40.33 Sq.mts. ( 434 Sq.ft. )
1RK27.05 Sq.mts. ( 291 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swastik Heightslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings70% completed
70% Complete
Before Oc
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
Before Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting70% completed
70% Complete
Before Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply70% completed
70% Complete
Before Oc
Buildings / Wings in Swastik Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swastik Heights by Ashok Singhlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

9677 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

77 apartments in total
Total
77
Booked
41
Available
36

Saleable Area Statistics (Sq. ft.)

25520 Total
Total
25520
Booked
13908
Available
11613
Total 77 apartments in project. 41 apartments booked. 53% apartments booked.
Total 25520 Sq.ft. saleable area. 13908 saleable area booked.
54% area booked.

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 2022810101022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.5 Sq.mts. ( 328 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK32.1 Sq.mts. ( 346 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK33.34 Sq.mts. ( 359 Sq.ft. )7
6 Booked85% Booked
85% Booked
1RK22.92 Sq.mts. ( 247 Sq.ft. )7
None Booked0% Booked
0% Booked
49 total apartments / 39 apartments booked. 79% apartments booked.
Work Description in Building D WingCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingMar 202281010815
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.36 Sq.mts. ( 370 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK37.19 Sq.mts. ( 400 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK40.33 Sq.mts. ( 434 Sq.ft. )6
1RK27.05 Sq.mts. ( 291 Sq.ft. )14
None Booked0% Booked
0% Booked
28 total apartments / 2 apartments booked. 7% apartments booked.
Work Description in Building E WingCompletion
Excavation
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress70% done
70% Booked
Stilt Floor
work-in-progress70% done
70% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
work-in-progress70% done
70% Booked
X number of Podiums
work-in-progress70% done
70% Booked
X number of Slabs of Super Structure
work-in-progress70% done
70% Booked
Channel Partners
Channel Partners Registered by Developer
Ashok Singh
for Project
Swastik Heights
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation