Project overview

Swastik Epitome Building 2 Phase Iii 15 To 21 Floors is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000005964. Swastik Epitome Building 2 Phase Iii 15 To 21 Floors is located at 185/B/1, 185/B/2, 185/B/3. This is a Ongoing being developed by Mahavir Homes.

Swastik Epitome Building 2 Phase Iii 15 To 21 Floors has 1 BHK & 1.5 BHK Apartments with carpet areas ranging from 427 to 532 Sq.ft. Carpet. The Project has total 170 of which 98 are currently available for sale.

Swastik Epitome Building 2 Phase Iii 15 To 21 Floors is being developed on a total land area of 36824 Sq.ft. out of which 30426 Sq.ft. i.e 83% is reserved for recreational purposes. Swastik Epitome Building 2 Phase Iii 15 To 21 Floors has 5 Wings / Towers C Wing,D Wing,E Wing,F Wing,G Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swastik Epitome Building 2 Phase Iii 15 To 21 Floors
  • Location:
  • 185/B/1, 185/B/2, 185/B/3
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Mahavir Homes
  • Phone:
  • Address:
  • Mahavir Symphony
Project RERA Details
MAHA REARA No: P99000005964
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect En Con
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession 31 Mar 2027
Litigations No Litigations
Last Modified 21 Nov 2023
Last Retrived 28 Jul 2025
Swastik Epitome Building 2 Phase Iii 15 To 21 Floors QR Code
Swastik Epitome Building 2 Phase Iii 15 To 21 Floors
MahaRERA - P99000005964
Apartment Details & Configuration
TypeArea
1 BHK56.74 Sq.mts. ( 611 Sq.ft. )
1 BHK56.86 Sq.mts. ( 612 Sq.ft. )
1 BHK57.03 Sq.mts. ( 614 Sq.ft. )
1.5 BHK57.14 Sq.mts. ( 615 Sq.ft. )
2 BHK42.02 Sq.mts. ( 452 Sq.ft. )
2 BHK49.71 Sq.mts. ( 535 Sq.ft. )
1 BHK41.8 Sq.mts. ( 450 Sq.ft. )
1 BHK41.91 Sq.mts. ( 451 Sq.ft. )
1.5 BHK47.91 Sq.mts. ( 516 Sq.ft. )
1.5 BHK49.53 Sq.mts. ( 533 Sq.ft. )
2 BHK62.08 Sq.mts. ( 668 Sq.ft. )
1 BHK41.39 Sq.mts. ( 446 Sq.ft. )
2 BHK41.46 Sq.mts. ( 446 Sq.ft. )
2 BHK61.89 Sq.mts. ( 666 Sq.ft. )
1 BHK39.65 Sq.mts. ( 427 Sq.ft. )
1 BHK39.81 Sq.mts. ( 429 Sq.ft. )
1 BHK41.97 Sq.mts. ( 452 Sq.ft. )
1.5 BHK49.45 Sq.mts. ( 532 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swastik Epitome Building 2 Phase Iii 15 To 21 Floorslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
2826.61 (Includes Common Rg Podium)
Club House
On Common Rg Podium As Part Of Complete Layout
Community Buildings
Cfc Plot As Approved
Electrical Meter Room, Sub-Station, Receiving Station
Part Of Complete Layout
Energy management
Part Of Complete Layout
Fire Protection And Fire Safety Requirements
Part Of Complete Layout
Internal Roads & Footpaths
Part Of Complete Layout
Landscaping & Tree Planting
Part Of Complete Layout
Open Parking
16 Nos.
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp To Be Provided As Part Of Complete Layout
Solid Waste Management And Disposal
Part Of Complete Layout
Storm Water Drains
Part Of Complete Layout
Street Lighting
Part Of Complete Layout
Temple
On Common Rg Podium As Part Of Complete Layout
Treatment And Disposal Of Sewage And Sullage Water
Part Of Complete Layout
Water Conservation, Rain water Harvesting
Part Of Complete Layout
Water Supply
To Be Provided By Vvcmc
Buildings / Wings in Swastik Epitome Building 2 Phase Iii 15 To 21 Floors
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swastik Epitome Building 2 Phase Iii 15 To 21 Floors by Mahavir Homeslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

36824 Sq. ft.

Project Area

30426 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

170 apartments in total
Total
170
Booked
72
Available
98

Saleable Area Statistics (Sq. ft.)

87439 Total
Total
87439
Booked
37486
Available
49952
Total 170 apartments in project. 72 apartments booked. 42% apartments booked.
Total 87439 Sq.ft. saleable area. 37486 saleable area booked.
43% area booked.

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 202771011413
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK56.74 Sq.mts. ( 611 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK56.86 Sq.mts. ( 612 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK57.03 Sq.mts. ( 614 Sq.ft. )3
1 Booked33% Booked
33% Booked
1.5 BHK57.14 Sq.mts. ( 615 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK42.02 Sq.mts. ( 452 Sq.ft. )6
4 Booked66% Booked
66% Booked
2 BHK49.71 Sq.mts. ( 535 Sq.ft. )7
2 Booked28% Booked
28% Booked
27 total apartments / 17 apartments booked. 62% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 202771011313
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.8 Sq.mts. ( 450 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK41.91 Sq.mts. ( 451 Sq.ft. )7
1.5 BHK47.91 Sq.mts. ( 516 Sq.ft. )6
3 Booked50% Booked
50% Booked
1.5 BHK49.53 Sq.mts. ( 533 Sq.ft. )7
2 Booked28% Booked
28% Booked
2 BHK62.08 Sq.mts. ( 668 Sq.ft. )7
5 Booked71% Booked
71% Booked
34 total apartments / 16 apartments booked. 47% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingMar 202771011314
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.39 Sq.mts. ( 446 Sq.ft. )6
2 BHK41.46 Sq.mts. ( 446 Sq.ft. )7
3 Booked42% Booked
42% Booked
2 BHK61.89 Sq.mts. ( 666 Sq.ft. )14
27 total apartments / 6 apartments booked. 22% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingMar 202771011314
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.65 Sq.mts. ( 427 Sq.ft. )7
1 BHK41.8 Sq.mts. ( 450 Sq.ft. )7
1 BHK41.91 Sq.mts. ( 451 Sq.ft. )7
4 Booked57% Booked
57% Booked
1.5 BHK47.91 Sq.mts. ( 516 Sq.ft. )6
1.5 BHK49.53 Sq.mts. ( 533 Sq.ft. )7
3 Booked42% Booked
42% Booked
2 BHK62.08 Sq.mts. ( 668 Sq.ft. )7
4 Booked57% Booked
57% Booked
41 total apartments / 14 apartments booked. 34% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingMar 202771011314
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.65 Sq.mts. ( 427 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK39.81 Sq.mts. ( 429 Sq.ft. )7
3 Booked42% Booked
42% Booked
1 BHK41.91 Sq.mts. ( 451 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK41.97 Sq.mts. ( 452 Sq.ft. )14
7 Booked50% Booked
50% Booked
1.5 BHK49.45 Sq.mts. ( 532 Sq.ft. )6
2 Booked33% Booked
33% Booked
41 total apartments / 19 apartments booked. 46% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Mahavir Homes
for Project
Swastik Epitome Building 2 Phase Iii 15 To 21 Floors
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation