Project overview

Swapnapurti Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000024464. Swapnapurti Complex is located at Wada. This is a New Project being developed by Yashlaxmi Creations.

Swapnapurti Complex has 1 BHK & 2 BHK Apartments with carpet areas ranging from 414 to 592 Sq.ft. Carpet. The Project has total 72 of which 72 are currently available for sale.

Swapnapurti Complex is being developed on a total land area of 32206 Sq.ft. Swapnapurti Complex has 3 Wings / Towers Mayureshwar Niwas,Siddheshwar Apartment,Vigneshwar Sadan

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swapnapurti Complex
  • Location:
  • Wada
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Yashlaxmi Creations
  • Phone:
  • Address:
  • 01, Sushvi Bhavan, Ainshet Road, Sharad Nagar, Wada Ct, 421303
Project RERA Details
MAHA REARA No: P99000024464
Project Type Residential
RERA Project Status New Project
Funding Bank Maharashtra Gramin Bank
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Feb 2020
Last Retrived 28 Jul 2025
Swapnapurti Complex QR Code
Swapnapurti Complex
MahaRERA - P99000024464
Apartment Details & Configuration
TypeArea
1 BHK33.24 Sq.mts. ( 358 Sq.ft. )
1 BHK36.26 Sq.mts. ( 390 Sq.ft. )
2 BHK58.73 Sq.mts. ( 632 Sq.ft. )
2 BHK61.37 Sq.mts. ( 661 Sq.ft. )
2 BHK31.47 Sq.mts. ( 339 Sq.ft. )
1 BHK33.88 Sq.mts. ( 365 Sq.ft. )
1 BHK37.54 Sq.mts. ( 404 Sq.ft. )
1 BHK40.17 Sq.mts. ( 432 Sq.ft. )
2 BHK56.57 Sq.mts. ( 609 Sq.ft. )
3 BHK37.65 Sq.mts. ( 405 Sq.ft. )
1 BHK38.45 Sq.mts. ( 414 Sq.ft. )
1 BHK39.26 Sq.mts. ( 423 Sq.ft. )
1 BHK41.57 Sq.mts. ( 447 Sq.ft. )
2 BHK55.03 Sq.mts. ( 592 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swapnapurti Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Plantation
Open Parking
Available
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Be Started
Street Lighting
Street Lighting To Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Will Be Done
Water Supply
Borewell
Buildings / Wings in Swapnapurti Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swapnapurti Complex by Yashlaxmi Creationslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

32206 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

72 apartments in total
Total
72
Booked
0
Available
72

Saleable Area Statistics (Sq. ft.)

33390 Total
Total
33390
Booked
0
Available
33390
Total 72 apartments in project. 0 apartments booked. 0% apartments booked.
Total 33390 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Mayureshwar Niwas

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Mayureshwar NiwasDec 20245101066
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.24 Sq.mts. ( 358 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK36.26 Sq.mts. ( 390 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK58.73 Sq.mts. ( 632 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK61.37 Sq.mts. ( 661 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK31.47 Sq.mts. ( 339 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Mayureshwar NiwasCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Siddheshwar Apartment

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Siddheshwar ApartmentDec 20245101066
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.88 Sq.mts. ( 365 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.54 Sq.mts. ( 404 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK40.17 Sq.mts. ( 432 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK56.57 Sq.mts. ( 609 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK37.65 Sq.mts. ( 405 Sq.ft. )4
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Siddheshwar ApartmentCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Vigneshwar Sadan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vigneshwar SadanDec 2024510101212
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.45 Sq.mts. ( 414 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK39.26 Sq.mts. ( 423 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK41.57 Sq.mts. ( 447 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK55.03 Sq.mts. ( 592 Sq.ft. )8
None Booked0% Booked
0% Booked
32 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Vigneshwar SadanCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Yashlaxmi Creations
for Project
Swapnapurti Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA.