Project overview

Swaminarayan Dham is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800033497. Swaminarayan Dham is located at 837. This is a New being developed by Ara Builders Private Limited.

Swaminarayan Dham has Office space Apartments with carpet areas ranging from 3732 to 671 Sq.ft. Carpet. The Project has total 153 of which 60 are currently available for sale.

Swaminarayan Dham is being developed on a total land area of 48409 Sq.ft. out of which 7166 Sq.ft. i.e 15% is reserved for recreational purposes. Swaminarayan Dham has 3 Wings / Towers A Wing,B Wing,C Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swaminarayan Dham
  • Location:
  • 837
  • Const. Stage:
    New
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Ara Builders Private Limited
  • Phone:
  • Address:
  • Rajveer Royals
Project RERA Details
MAHA REARA No: P51800033497
Project Type Residential / Group Housing
RERA Project Status New
Architect Ashish Solanki
Funding Bank CENTRAL BANK OF INDIA
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 22 Feb 2022
Last Retrived 26 Jul 2025
Swaminarayan Dham QR Code
Swaminarayan Dham
MahaRERA - P51800033497
Apartment Details & Configuration
TypeArea
1 BHK36.23 Sq.mts. ( 390 Sq.ft. )
1 BHK38.23 Sq.mts. ( 412 Sq.ft. )
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )
2 BHK47.96 Sq.mts. ( 516 Sq.ft. )
2 BHK49.49 Sq.mts. ( 533 Sq.ft. )
2 BHK51.51 Sq.mts. ( 554 Sq.ft. )
2 BHK44.08 Sq.mts. ( 474 Sq.ft. )
Office space62.31 Sq.mts. ( 671 Sq.ft. )
Office space346.69 Sq.mts. ( 3732 Sq.ft. )
Office space462.08 Sq.mts. ( 4974 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swaminarayan Dhamlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Requirement
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Requirement By Reliance Energy
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Internal Chambers And Lines Proposed No Stp Propos
Solid Waste Management And Disposal
Will Be Provided As Per Requirement By Mcgm
Storm Water Drains
Will Be Connected To Municipal Storm Water Drain
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Provided As Per Requirement By Mcgm
Water Supply
On Completion Of The Building
Buildings / Wings in Swaminarayan Dham
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swaminarayan Dham by Ara Builders Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

48409 Sq. ft.

Project Area

7166 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

153 apartments in total
Total
153
Booked
93
Available
60

Saleable Area Statistics (Sq. ft.)

116993 Total
Total
116993
Booked
43831
Available
73162
Total 153 apartments in project. 93 apartments booked. 60% apartments booked.
Total 116993 Sq.ft. saleable area. 43831 saleable area booked.
37% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202513111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.23 Sq.mts. ( 390 Sq.ft. )12
12 Booked100% Booked
100% Booked
1 BHK38.23 Sq.mts. ( 412 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )12
4 Booked33% Booked
33% Booked
2 BHK47.96 Sq.mts. ( 516 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK49.49 Sq.mts. ( 533 Sq.ft. )12
7 Booked58% Booked
58% Booked
2 BHK51.51 Sq.mts. ( 554 Sq.ft. )12
9 Booked75% Booked
75% Booked
72 total apartments / 43 apartments booked. 59% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202513111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.23 Sq.mts. ( 412 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )12
5 Booked41% Booked
41% Booked
2 BHK44.08 Sq.mts. ( 474 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK47.96 Sq.mts. ( 516 Sq.ft. )10
3 Booked30% Booked
30% Booked
2 BHK49.49 Sq.mts. ( 533 Sq.ft. )12
9 Booked75% Booked
75% Booked
2 BHK51.51 Sq.mts. ( 554 Sq.ft. )12
10 Booked83% Booked
83% Booked
70 total apartments / 50 apartments booked. 71% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202510111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space62.31 Sq.mts. ( 671 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space346.69 Sq.mts. ( 3732 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space462.08 Sq.mts. ( 4974 Sq.ft. )9
None Booked0% Booked
0% Booked
11 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Ara Builders Private Limited
for Project
Swaminarayan Dham
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation