Project overview

Swami Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700023664. Swami Residency is located at Survery No 187 Hissa No 1 A. This is a New being developed by Satish Bapu Giri.

Swami Residency has 2 BHK Apartments with carpet areas ranging from 583 to 583 Sq.ft. Carpet. The Project has total 43 of which 12 are currently available for sale.

Swami Residency is being developed on a total land area of 11840 Sq.ft. Swami Residency has 3 Wings / Towers Swami Residency Bldg No 1,Swami Residency Bldg No 2,Swami Residency Bldg No 3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swami Residency
  • Location:
  • Survery No 187 Hissa No 1 A
  • Const. Stage:
    New
  • Possession:
    21 Nov 2020
Developer Details

  • Developer:
    Satish Bapu Giri
  • Phone:
  • Address:
  • Sahyadri Society
Project RERA Details
MAHA REARA No: P51700023664
Project Type Commercial
RERA Project Status New
Architect Prime Associates
Funding Bank IDBI BANK
Proposed Possession 21 Nov 2020
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Dec 2019
Last Retrived 26 Jul 2025
Swami Residency QR Code
Swami Residency
MahaRERA - P51700023664
Apartment Details & Configuration
TypeArea
1 BHK33.54 Sq.mts. ( 361 Sq.ft. )
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )
1 BHK36.51 Sq.mts. ( 393 Sq.ft. )
1RK25.55 Sq.mts. ( 275 Sq.ft. )
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )
2 BHK54.16 Sq.mts. ( 583 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swami Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management100% completed
95% Complete
0
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Tree Planting Proposed
Open Parking100% completed
95% Complete
0
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvaesting Proposed
Water Supply100% completed
95% Complete
Connection Will Provided By Concern Dept
Buildings / Wings in Swami Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swami Residency by Satish Bapu Girilast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11840 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

43 apartments in total
Total
43
Booked
31
Available
12

Saleable Area Statistics (Sq. ft.)

15421 Total
Total
15421
Booked
10846
Available
4575
Total 43 apartments in project. 31 apartments booked. 72% apartments booked.
Total 15421 Sq.ft. saleable area. 10846 saleable area booked.
70% area booked.

Swami Residency Bldg No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Swami Residency Bldg No 1Apr 20203100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.54 Sq.mts. ( 361 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK36.51 Sq.mts. ( 393 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK25.55 Sq.mts. ( 275 Sq.ft. )6
4 Booked66% Booked
66% Booked
20 total apartments / 14 apartments booked. 70% apartments booked.
Work Description in Building Swami Residency Bldg No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Swami Residency Bldg No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Swami Residency Bldg No 2Apr 20203100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK36.51 Sq.mts. ( 393 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK25.55 Sq.mts. ( 275 Sq.ft. )8
5 Booked62% Booked
62% Booked
20 total apartments / 17 apartments booked. 85% apartments booked.
Work Description in Building Swami Residency Bldg No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Swami Residency Bldg No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Swami Residency Bldg No 3Apr 20201100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.16 Sq.mts. ( 583 Sq.ft. )3
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Swami Residency Bldg No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Satish Bapu Giri
for Project
Swami Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation