Project overview

Supreme Evana is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800033931. Supreme Evana is located at F/1207. This is a New being developed by Supreme Mega Constructions Llp.

Supreme Evana has 2 BHK & 3 BHK Apartments with carpet areas ranging from 749 to 1056 Sq.ft. Carpet. The Project has total 14 of which 2 are currently available for sale.

Supreme Evana is being developed on a total land area of 10143 Sq.ft. Supreme Evana has 1 Wings / Towers Supreme Evana

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Supreme Evana
  • Location:
  • F/1207
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Supreme Mega Constructions Llp
  • Phone:
  • Address:
  • Everest Classic
Project RERA Details
MAHA REARA No: P51800033931
Project Type Residential / Group Housing
RERA Project Status New
Architect Yomesh Rao
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 14 Mar 2022
Last Retrived 26 Jul 2025
Supreme Evana QR Code
Supreme Evana
MahaRERA - P51800033931
Apartment Details & Configuration
TypeArea
2 BHK69.55 Sq.mts. ( 749 Sq.ft. )
3 BHK98.08 Sq.mts. ( 1056 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Supreme Evanalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approved Plan
Gymnasium Fitness Center
As Per Approved Plan
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approved Plan
Solid Waste Management And Disposal
As Per Approved Plan
Storm Water Drains
As Per Approved Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Approved Plan
Water Supply
As Per Approved Plan
Buildings / Wings in Supreme Evana
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Supreme Evana by Supreme Mega Constructions Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

10143 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
12
Available
2

Saleable Area Statistics (Sq. ft.)

12631 Total
Total
12631
Booked
10519
Available
2111
Total 14 apartments in project. 12 apartments booked. 85% apartments booked.
Total 12631 Sq.ft. saleable area. 10519 saleable area booked.
83% area booked.

Supreme Evana

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Supreme EvanaJun 2024161010053
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK69.55 Sq.mts. ( 749 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK98.08 Sq.mts. ( 1056 Sq.ft. )7
5 Booked71% Booked
71% Booked
14 total apartments / 12 apartments booked. 85% apartments booked.
Work Description in Building Supreme EvanaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Supreme Mega Constructions Llp
for Project
Supreme Evana
last updated on 26 Jul 2025 as per information obtained from MARA RERA.