Project overview

Supreme Elysia is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800034860. Supreme Elysia is located at 415C. This is a New being developed by Supreme Mega Constructions Llp.

Supreme Elysia has 4 BHK & 5 BHK & more Apartments with carpet areas ranging from 1767 to 3349 Sq.ft. Carpet. The Project has total 11 of which 3 are currently available for sale.

Supreme Elysia is being developed on a total land area of 10368 Sq.ft. Supreme Elysia has 1 Wings / Towers Supreme Elysia

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Supreme Elysia
  • Location:
  • 415C
  • Const. Stage:
    New
  • Possession:
    31 May 2025
Developer Details

  • Developer:
    Supreme Mega Constructions Llp
  • Phone:
  • Address:
  • Everest Classic
Project RERA Details
MAHA REARA No: P51800034860
Project Type Residential / Group Housing
RERA Project Status New
Architect Yomesh Rao
Funding Bank HDFC BANK
Proposed Possession 31 May 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Aug 2022
Last Retrived 26 Jul 2025
Supreme Elysia QR Code
Supreme Elysia
MahaRERA - P51800034860
Apartment Details & Configuration
TypeArea
4 BHK164.14 Sq.mts. ( 1767 Sq.ft. )
4 BHK193.15 Sq.mts. ( 2079 Sq.ft. )
5 BHK & more311.15 Sq.mts. ( 3349 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Supreme Elysialast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Approval
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Approval
Landscaping & Tree Planting
As Per Approval
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Approval
Solid Waste Management And Disposal
As Per Approval
Storm Water Drains
As Per Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting90% completed
90% Complete
As Per Approval
Water Supply
As Per Approval
Buildings / Wings in Supreme Elysia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Supreme Elysia by Supreme Mega Constructions Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

10368 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

11 apartments in total
Total
11
Booked
8
Available
3

Saleable Area Statistics (Sq. ft.)

23203 Total
Total
23203
Booked
16008
Available
7195
Total 11 apartments in project. 8 apartments booked. 72% apartments booked.
Total 23203 Sq.ft. saleable area. 16008 saleable area booked.
69% area booked.

Supreme Elysia

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Supreme ElysiaMay 2025141012042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK164.14 Sq.mts. ( 1767 Sq.ft. )3
2 Booked66% Booked
66% Booked
4 BHK193.15 Sq.mts. ( 2079 Sq.ft. )7
6 Booked85% Booked
85% Booked
5 BHK & more311.15 Sq.mts. ( 3349 Sq.ft. )1
None Booked0% Booked
0% Booked
11 total apartments / 8 apartments booked. 72% apartments booked.
Work Description in Building Supreme ElysiaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Supreme Mega Constructions Llp
for Project
Supreme Elysia
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation