Project overview
Sunteck Oneworld 2, Tivri, Naigaon East is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000032834. Sunteck Oneworld 2, Tivri, Naigaon East is located at Survey No 30 Hissa 1 Part, Survey No 30 Hissa 3 Part, Survey No 35 Hissa 2 Part. This is a New being developed by Sunteck Realty Limited.
Sunteck Oneworld 2, Tivri, Naigaon East has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 277 to 783 Sq.ft. Carpet. The Project has total 370 of which 147 are currently available for sale.
Sunteck Oneworld 2, Tivri, Naigaon East is being developed on a total land area of 32938 Sq.ft. Sunteck Oneworld 2, Tivri, Naigaon East has 2 Wings / Towers Tower 3,Tower 4
| Project | Developer | Location | Possession |
-
Project:
Sunteck Oneworld 2, Tivri, Naigaon East
-
Location:
-
Survey No 30 Hissa 1 Part, Survey No 30 Hissa 3 Part, Survey No 35 Hissa 2 Part
-
Const. Stage:
New
-
Possession:
31 Dec 2025
-
Developer:
Sunteck Realty Limited
-
Phone:
-
Address:
-
Sunteck Centre
| MAHA REARA No: |
P99000032834 |
| Project Type |
Others |
| RERA Project Status |
New |
| Funding Bank |
AXIS BANK |
| Proposed Possession |
31 Dec 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
02 Feb 2022 |
| Last Retrived |
28 Jul 2025 |
Sunteck Oneworld 2, Tivri, Naigaon East QR Code
Sunteck Oneworld 2, Tivri, Naigaon East
MahaRERA - P99000032834
| Type | Area |
| 1 BHK | 28.93 Sq.mts. ( 311 Sq.ft. ) |
| 2 BHK | 39.09 Sq.mts. ( 421 Sq.ft. ) |
| Shop | 45.28 Sq.mts. ( 487 Sq.ft. ) |
| Shop | 46.12 Sq.mts. ( 496 Sq.ft. ) |
| Shop | 49.55 Sq.mts. ( 533 Sq.ft. ) |
| Shop | 50.37 Sq.mts. ( 542 Sq.ft. ) |
| Shop | 51.14 Sq.mts. ( 550 Sq.ft. ) |
| Shop | 51.15 Sq.mts. ( 551 Sq.ft. ) |
| Shop | 55.67 Sq.mts. ( 599 Sq.ft. ) |
| Shop | 59.45 Sq.mts. ( 640 Sq.ft. ) |
| Shop | 61.49 Sq.mts. ( 662 Sq.ft. ) |
| Shop | 62.27 Sq.mts. ( 670 Sq.ft. ) |
| Shop | 33.59 Sq.mts. ( 362 Sq.ft. ) |
| Shop | 35.93 Sq.mts. ( 387 Sq.ft. ) |
| Shop | 36.17 Sq.mts. ( 389 Sq.ft. ) |
| Shop | 25.42 Sq.mts. ( 274 Sq.ft. ) |
| Shop | 28.03 Sq.mts. ( 302 Sq.ft. ) |
| Shop | 45.41 Sq.mts. ( 489 Sq.ft. ) |
| Shop | 48.3 Sq.mts. ( 520 Sq.ft. ) |
| Shop | 53.33 Sq.mts. ( 574 Sq.ft. ) |
| Shop | 55.99 Sq.mts. ( 603 Sq.ft. ) |
| Shop | 62.59 Sq.mts. ( 674 Sq.ft. ) |
| Shop | 65.24 Sq.mts. ( 702 Sq.ft. ) |
| Shop | 72.7 Sq.mts. ( 783 Sq.ft. ) |
| Shop | 33.91 Sq.mts. ( 365 Sq.ft. ) |
| Shop | 36.21 Sq.mts. ( 390 Sq.ft. ) |
| Shop | 36.3 Sq.mts. ( 391 Sq.ft. ) |
| Shop | 25.74 Sq.mts. ( 277 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunteck Oneworld 2, Tivri, Naigaon Eastlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Work Not Started |
|
|
|
Work Not Started |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Work Not Started |
|
|
|
Work Not Started |
Fire Protection And Fire Safety
Requirements
|
|
Work Not Started |
Landscaping & Tree Planting
|
|
Work Not Started |
|
|
|
Work Not Started |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Work Not Started |
Solid Waste Management And Disposal
|
|
Work Not Started |
|
|
|
Work Not Started |
|
|
|
Work Not Started |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Work Not Started |
Water Conservation, Rain water Harvesting
|
|
Work Not Started |
|
|
|
Work Not Started |
Buildings / Wings in Sunteck Oneworld 2, Tivri, Naigaon East
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunteck Oneworld 2, Tivri, Naigaon East by Sunteck Realty Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
370
apartments in total
Saleable Area Statistics (Sq. ft.)
139931
Total
Total 370 apartments in project. 223 apartments booked. 60% apartments booked.
Total 139931 Sq.ft. saleable area. 81363 saleable area booked.
58% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Tower 3 | Dec 2025 | 23 | 1 | 0 | 1 | 0 | 0 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 28.93 Sq.mts. ( 311 Sq.ft. ) | 83 | |
| 2 BHK | 39.09 Sq.mts. ( 421 Sq.ft. ) | 88 | |
| Shop | 45.28 Sq.mts. ( 487 Sq.ft. ) | 1 | |
| Shop | 46.12 Sq.mts. ( 496 Sq.ft. ) | 1 | |
| Shop | 49.55 Sq.mts. ( 533 Sq.ft. ) | 1 | |
| Shop | 50.37 Sq.mts. ( 542 Sq.ft. ) | 1 | |
| Shop | 51.14 Sq.mts. ( 550 Sq.ft. ) | 1 | |
| Shop | 51.15 Sq.mts. ( 551 Sq.ft. ) | 1 | |
| Shop | 55.67 Sq.mts. ( 599 Sq.ft. ) | 1 | |
| Shop | 59.45 Sq.mts. ( 640 Sq.ft. ) | 1 | |
| Shop | 61.49 Sq.mts. ( 662 Sq.ft. ) | 1 | |
| Shop | 62.27 Sq.mts. ( 670 Sq.ft. ) | 2 | |
| Shop | 33.59 Sq.mts. ( 362 Sq.ft. ) | 1 | |
| Shop | 35.93 Sq.mts. ( 387 Sq.ft. ) | 1 | |
| Shop | 36.17 Sq.mts. ( 389 Sq.ft. ) | 1 | |
| Shop | 25.42 Sq.mts. ( 274 Sq.ft. ) | 1 | |
| Shop | 28.03 Sq.mts. ( 302 Sq.ft. ) | 1 | |
187 total apartments / 110 apartments booked. 58% apartments booked. |
| Work Description in Building Tower 3 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Tower 4 | Dec 2025 | 23 | 1 | 0 | 1 | 0 | 0 | 3 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 28.93 Sq.mts. ( 311 Sq.ft. ) | 83 | |
| 2 BHK | 39.09 Sq.mts. ( 421 Sq.ft. ) | 88 | |
| Shop | 45.41 Sq.mts. ( 489 Sq.ft. ) | 1 | |
| Shop | 48.3 Sq.mts. ( 520 Sq.ft. ) | 1 | |
| Shop | 53.33 Sq.mts. ( 574 Sq.ft. ) | 1 | |
| Shop | 55.99 Sq.mts. ( 603 Sq.ft. ) | 1 | |
| Shop | 62.59 Sq.mts. ( 674 Sq.ft. ) | 1 | |
| Shop | 65.24 Sq.mts. ( 702 Sq.ft. ) | 1 | |
| Shop | 72.7 Sq.mts. ( 783 Sq.ft. ) | 1 | |
| Shop | 33.91 Sq.mts. ( 365 Sq.ft. ) | 1 | |
| Shop | 36.21 Sq.mts. ( 390 Sq.ft. ) | 1 | |
| Shop | 36.3 Sq.mts. ( 391 Sq.ft. ) | 1 | |
| Shop | 25.74 Sq.mts. ( 277 Sq.ft. ) | 1 | |
| Shop | 28.03 Sq.mts. ( 302 Sq.ft. ) | 1 | |
183 total apartments / 113 apartments booked. 61% apartments booked. |
| Work Description in Building Tower 4 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Sunteck Realty Limited
for Project
Sunteck Oneworld 2, Tivri, Naigaon East
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |