Project overview

Sunrise Orlem Building 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007714. Sunrise Orlem Building 4 is located at 4Cinawvfwofyorn7ma3ycg==. This is a Ongoing being developed by Dhaval Housing Aop.

Sunrise Orlem Building 4 has 1 BHK Apartments with carpet areas ranging from 282 to 282 Sq.ft. Carpet. The Project has total 13 of which 6 are currently available for sale.

Sunrise Orlem Building 4 is being developed on a total land area of 2083 Sq.ft. Sunrise Orlem Building 4 has 1 Wings / Towers Sunrise Orlem Building 4

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sunrise Orlem Building 4
  • Location:
  • 4Cinawvfwofyorn7ma3ycg==
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Dhaval Housing Aop
  • Phone:
  • Address:
  • Centerpoint
Project RERA Details
MAHA REARA No: P51800007714
Project Type Others
RERA Project Status Ongoing
Architect Sanjay Neve
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 15 Mar 2019
Last Retrived 13 Feb 2026
Sunrise Orlem Building 4 QR Code
Sunrise Orlem Building 4
MahaRERA - P51800007714
Apartment Details & Configuration
TypeArea
1 BHK26.17 Sq.mts. ( 282 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunrise Orlem Building 4last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
As Per Swd Remark
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting10% completed
10% Complete
Common For The Layout
Open Parking
To Be Completed Before Possession
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Mcgm
Solid Waste Management And Disposal
Will Be Completed Before Handing Over Possession
Storm Water Drains30% completed
30% Complete
Dp Road Side Wip; As Per Remarks
Street Lighting
To Be Handed Before Possession
Treatment And Disposal Of Sewage And Sullage Water
To Be Finished Before Completion Of Phase
Water Conservation, Rain water Harvesting
Na
Water Supply
To Be Handed Before Possession
Buildings / Wings in Sunrise Orlem Building 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunrise Orlem Building 4 by Dhaval Housing Aoplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

2083 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

13 apartments in total
Total
13
Booked
7
Available
6

Saleable Area Statistics (Sq. ft.)

3662 Total
Total
3662
Booked
1972
Available
1690
Total 13 apartments in project. 7 apartments booked. 53% apartments booked.
Total 3662 Sq.ft. saleable area. 1972 saleable area booked.
54% area booked.

Sunrise Orlem Building 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sunrise Orlem Building 4Jan 19007100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.17 Sq.mts. ( 282 Sq.ft. )13
7 Booked53% Booked
53% Booked
13 total apartments / 7 apartments booked. 53% apartments booked.
Work Description in Building Sunrise Orlem Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dhaval Housing Aop
for Project
Sunrise Orlem Building 4
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation