Project overview

Sunrise Orlem 2A Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800007706. Sunrise Orlem 2A Phase 1 is located at 439, 438B. This is a Ongoing being developed by Dhaval Housing Aop.

Sunrise Orlem 2A Phase 1 has 3 BHK Type 1, 3 BHK type 2, DUPLEX TYPE 1 & Duplex Type 2 Apartments with carpet areas ranging from 1105 to 1603 Sq.ft. Carpet. The Project has total 41 of which 13 are currently available for sale.

Sunrise Orlem 2A Phase 1 is being developed on a total land area of 11268 Sq.ft. Sunrise Orlem 2A Phase 1 has 1 Wings / Towers Sunrise Orlem 2A

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sunrise Orlem 2A Phase 1
  • Location:
  • 439, 438B
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Dhaval Housing Aop
  • Phone:
  • Address:
  • Centerpoint
Project RERA Details
MAHA REARA No: P51800007706
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Design Studio Ahmedabad
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 31 Jan 2023
Litigations No Litigations
Last Modified 08 Sep 2021
Last Retrived 26 Jul 2025
Sunrise Orlem 2A Phase 1 QR Code
Sunrise Orlem 2A Phase 1
MahaRERA - P51800007706
Apartment Details & Configuration
TypeArea
3 BHK Type 1103 Sq.mts. ( 1109 Sq.ft. )
3 BHK type 2102.68 Sq.mts. ( 1105 Sq.ft. )
DUPLEX TYPE 1148.91 Sq.mts. ( 1603 Sq.ft. )
Duplex Type 2138.73 Sq.mts. ( 1493 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunrise Orlem 2A Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
As Per Swdremark
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
The Stp Plant Will Be Ready Before Possession
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Will Be Completed Before Possession For Phase 1
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Lines Laid
Solid Waste Management And Disposal
The Final Layout Will Comprise Of Internal Street
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply100% completed
95% Complete
Water Main Line Laid
Buildings / Wings in Sunrise Orlem 2A Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunrise Orlem 2A Phase 1 by Dhaval Housing Aoplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11268 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

41 apartments in total
Total
41
Booked
28
Available
13

Saleable Area Statistics (Sq. ft.)

46263 Total
Total
46263
Booked
31881
Available
14382
Total 41 apartments in project. 28 apartments booked. 68% apartments booked.
Total 46263 Sq.ft. saleable area. 31881 saleable area booked.
69% area booked.

Sunrise Orlem 2A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sunrise Orlem 2ADec 2020231015039
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK Type 1103 Sq.mts. ( 1109 Sq.ft. )18
14 Booked77% Booked
77% Booked
3 BHK type 2102.68 Sq.mts. ( 1105 Sq.ft. )21
12 Booked57% Booked
57% Booked
DUPLEX TYPE 1148.91 Sq.mts. ( 1603 Sq.ft. )1
1 Booked100% Booked
100% Booked
Duplex Type 2138.73 Sq.mts. ( 1493 Sq.ft. )1
1 Booked100% Booked
100% Booked
41 total apartments / 28 apartments booked. 68% apartments booked.
Work Description in Building Sunrise Orlem 2ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dhaval Housing Aop
for Project
Sunrise Orlem 2A Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation