Project overview

Sunrise Charkop Wing C is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004387. Sunrise Charkop Wing C is located at 17A, Cts No 5, 8B, 17B, 18A. This is a Ongoing being developed by Dhaval Housing Aop.

Sunrise Charkop Wing C has 2 BHK Type 1, 2 BHK Type 2 & 3 BHK Apartments with carpet areas ranging from 690 to 1002 Sq.ft. Carpet. The Project has total 147 of which 4 are currently available for sale.

Sunrise Charkop Wing C is being developed on a total land area of 4676 Sq.ft. out of which 29129 Sq.ft. i.e 623% is reserved for recreational purposes. Sunrise Charkop Wing C has 2 Wings / Towers Club House,Sunrise Charkop Wing C

ProjectDeveloperLocationPossession
Damodar TowerJaanvi DevelopersOld Survey No. 136 Hissa No. 4-Part / New Survey No. 98 Hissa No. 4C31-03-2026 00:00:00
Sunrise Charkop Wing CDhaval Housing Aop17A, Cts No 5, 8B, 17B, 18A30-03-2022 00:00:00
Project Details
  • Project:
    Sunrise Charkop Wing C
  • Location:
  • 17A, Cts No 5, 8B, 17B, 18A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Mar 2022
Developer Details

  • Developer:
    Dhaval Housing Aop
  • Phone:
  • Address:
  • Centerpoint
Project RERA Details
MAHA REARA No: P51800004387
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Rukhsar Mirza
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 30 Mar 2022
Revised Possession 30 Mar 2022
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2021
Last Retrived 26 Jul 2025
Sunrise Charkop Wing C QR Code
Sunrise Charkop Wing C
MahaRERA - P51800004387
Apartment Details & Configuration
TypeArea
2 BHK Type 164.06 Sq.mts. ( 690 Sq.ft. )
2 BHK Type 275.03 Sq.mts. ( 808 Sq.ft. )
3 BHK93.09 Sq.mts. ( 1002 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sunrise Charkop Wing Clast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
In Progress
Community Buildings
Will Be Handed Over Before Possession
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
To Be Handed Over Before Possession
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc; To Be Handed Over Before Possessio
Landscaping & Tree Planting95% completed
95% Complete
Common For The Layout
Open Parking
In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp Plant Is Successfully Installed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Will Be Given Before Possession
Street Lighting50% completed
50% Complete
Will Be Handed Over Before Possession
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp Ready
Water Conservation, Rain water Harvesting100% completed
95% Complete
Common For The Layout.
Water Supply90% completed
90% Complete
Water Main Line Laid; As Per Mcgm
Buildings / Wings in Sunrise Charkop Wing C
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sunrise Charkop Wing C by Dhaval Housing Aoplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4676 Sq. ft.

Project Area

29129 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

147 apartments in total
Total
147
Booked
143
Available
4

Saleable Area Statistics (Sq. ft.)

113355 Total
Total
113355
Booked
109347
Available
4008
Total 147 apartments in project. 143 apartments booked. 97% apartments booked.
Total 113355 Sq.ft. saleable area. 109347 saleable area booked.
96% area booked.

Club House

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Club HouseSep 20212101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building Club HouseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked

Sunrise Charkop Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sunrise Charkop Wing CMar 20214110120233
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Type 164.06 Sq.mts. ( 690 Sq.ft. )108
108 Booked100% Booked
100% Booked
2 BHK Type 275.03 Sq.mts. ( 808 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK93.09 Sq.mts. ( 1002 Sq.ft. )38
34 Booked89% Booked
89% Booked
147 total apartments / 143 apartments booked. 97% apartments booked.
Work Description in Building Sunrise Charkop Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dhaval Housing Aop
for Project
Sunrise Charkop Wing C
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation