Project overview

Sundaram Plaza H Wing is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000031965. Sundaram Plaza H Wing is located at S.No.199. This is a New being developed by Nine Realty Developers.

Sundaram Plaza H Wing has 1 BHK & 2 BHK Apartments with carpet areas ranging from 242 to 411 Sq.ft. Carpet. The Project has total 14 of which 14 are currently available for sale.

Sundaram Plaza H Wing is being developed on a total land area of 2953 Sq.ft. out of which 2804 Sq.ft. i.e 95% is reserved for recreational purposes. Sundaram Plaza H Wing has 1 Wings / Towers Sundaram Plaza H Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sundaram Plaza H Wing
  • Location:
  • S.No.199
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Nine Realty Developers
  • Phone:
  • Address:
  • Nakoda Heights
Project RERA Details
MAHA REARA No: P99000031965
Project Type Residential / Group Housing
RERA Project Status New
Architect Sanat Mehta & Associate
Funding Bank RBL Bank Limited
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Nov 2021
Last Retrived 28 Jul 2025
Sundaram Plaza H Wing QR Code
Sundaram Plaza H Wing
MahaRERA - P99000031965
Apartment Details & Configuration
TypeArea
1 BHK22.45 Sq.mts. ( 242 Sq.ft. )
1 BHK22.6 Sq.mts. ( 243 Sq.ft. )
1 BHK22.7 Sq.mts. ( 244 Sq.ft. )
1 BHK23.46 Sq.mts. ( 253 Sq.ft. )
2 BHK38.2 Sq.mts. ( 411 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sundaram Plaza H Winglast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Dwg
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Dwg
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
As Per Dwg
Landscaping & Tree Planting50% completed
50% Complete
As Per Dwg
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Dwg
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
As Per Dwg
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Dwg
Water Conservation, Rain water Harvesting
As Per Dwg
Water Supply
As Per Dwg
Buildings / Wings in Sundaram Plaza H Wing
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sundaram Plaza H Wing by Nine Realty Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

2953 Sq. ft.

Project Area

2804 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
0
Available
14

Saleable Area Statistics (Sq. ft.)

3921 Total
Total
3921
Booked
0
Available
3921
Total 14 apartments in project. 0 apartments booked. 0% apartments booked.
Total 3921 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Sundaram Plaza H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sundaram Plaza H WingDec 20268101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.45 Sq.mts. ( 242 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK22.6 Sq.mts. ( 243 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK22.7 Sq.mts. ( 244 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK23.46 Sq.mts. ( 253 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK38.2 Sq.mts. ( 411 Sq.ft. )3
None Booked0% Booked
0% Booked
14 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sundaram Plaza H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress65% done
65% Booked
Sanitary Fittings within the flats / premises
work-in-progress65% done
65% Booked
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked
Channel Partners
Channel Partners Registered by Developer
Nine Realty Developers
for Project
Sundaram Plaza H Wing
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation