Project overview

Sumati Sadan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800021758. Sumati Sadan is located at 2, 3, 184184-1. This is a New being developed by Mark Life Space.

Sumati Sadan has residential Apartments with carpet areas ranging from 5840 to 5840 Sq.ft. Carpet. The Project has total 15 of which 15 are currently available for sale.

Sumati Sadan is being developed on a total land area of 2906 Sq.ft. Sumati Sadan has 1 Wings / Towers Sumati Sadan

ProjectDeveloperLocationPossession
Sankalp HeritageShyam Biharilal Gehani986/1 T O4, 98631-12-2019 00:00:00
Sky Residency Loksadan Chs Phase 1 Up To G Plus 7Pt.Sky Property Developers Private Limited766, 766/1 To 531-12-2017 00:00:00
Aqsa Palace Chs LtdK T Group400064, Mumbai Suburban30-09-2017 00:00:00
Sky CrestSky Property Developers Private LimitedCts Number 37 37/A And 38 38/1 To 38/731-01-2021 00:00:00
Raj NirmanFerro Build682/682/1 To 228-06-2018 00:00:00
Unity ComplexR B Shah And CoCts No 278Pt 280Pt 282 283 284 284/1 To 22 285 285/1 To 37 286 287 289 290 291 29230-12-2021 00:00:00
Project Details
  • Project:
    Sumati Sadan
  • Location:
  • 2, 3, 184184-1
  • Const. Stage:
    New
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Mark Life Space
  • Phone:
  • Address:
  • Mirza Shopping Centre
Project RERA Details
MAHA REARA No: P51800021758
Project Type Residential / Group Housing
RERA Project Status New
Architect Harish D Gandhi
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 30 Jun 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Jul 2019
Last Retrived 26 Jul 2025
Sumati Sadan QR Code
Sumati Sadan
MahaRERA - P51800021758
Apartment Details & Configuration
TypeArea
residential542.55 Sq.mts. ( 5840 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sumati Sadanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Miter Room 1.17By1.35 Mtr
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Na
Open Parking50% completed
50% Complete
Stacked/Pit Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply75% completed
75% Complete
Adequate Water Connection Of Mcgm Shall Be Provide
Buildings / Wings in Sumati Sadan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sumati Sadan by Mark Life Spacelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

2906 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

15 apartments in total
Total
15
Booked
0
Available
15

Saleable Area Statistics (Sq. ft.)

87600 Total
Total
87600
Booked
0
Available
87600
Total 15 apartments in project. 0 apartments booked. 0% apartments booked.
Total 87600 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Sumati Sadan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sumati SadanJun 20218100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
residential542.55 Sq.mts. ( 5840 Sq.ft. )15
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sumati SadanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mark Life Space
for Project
Sumati Sadan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation