Project overview

Sukur Enclave Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700001982. Sukur Enclave Phase 1 is located at Gb2slhzhny4llyogjolopr4wzne2pxck5rxetg3qqbsjfyasnszypyv8xlhxjnhxxfbxdj2qv98vc65te1jks8tf5k1qgnhgjvrjnqn4rvhk8pvvbpt8hbvm2hwtvocl. This is a Ongoing being developed by Rajaram Construction.

Sukur Enclave Phase 1 has 1 BHK & 1 BHKS Apartments with carpet areas ranging from 353 to 484 Sq.ft. Carpet. The Project has total 53 of which 47 are currently available for sale.

Sukur Enclave Phase 1 is being developed on a total land area of 17761 Sq.ft. Sukur Enclave Phase 1 has 1 Wings / Towers Building D

ProjectDeveloperLocationPossession
Kavya ParkShree Construction CompanyBye7ts1okoixtfwh97myyodbsyy03+Zh87nfq/Jzcpkhy2alrk3ryxfzlld0u+Gx6p0hr9vp2hlva74h7i8ymw==30-06-2021 00:00:00
Kavya ResidencyKavya Mira RealtyCv4m6c0gagchjuec3nx+Jvijn29tej2md/Hthkmse17tea4qhh9o/Vrcc5+Mb2chb4yh/Ueth4spu/Qvs+Cv7/E1n0ztgrnh6+Uu3pbbuxm=31-12-2019 00:00:00
FalconM/S Ace ConstructionsE1vmrlwc8mhrjuihr8toyeyfbvhfvnmjh2ynyopbhgi=30-06-2018 00:00:00
Pristine TowerIdeal DevelopersThane, 40061531-12-2017 00:00:00
Tropical Lagoon - 4 -JacarandaSoham EstatesT1zlsa9gtldyel4cdthxwablrvgyfzhgubzu8idgxidjz4df1+Co8wxv136yaqbtcaqxyclipco5d0a0+P6zg+Z6d/Ra0xw05qbh2ex4klq=31-05-2018 00:00:00
Hill SpringAsha InfratechThane31-12-2022 00:00:00
White HouseLaabh Samruddhi EnterprisesCgg2atenl/Q46sotv8wu+W==30-12-2025 00:00:00
Tropical Lagoon - 5 - Di VitaSoham EstatesYxt7iazddczsjom3xigzk2rfsuk0bosiwelraj+Xeeiqjpc2en0wrcojr5uxcba/Khykwx5gbymfqjckeg2vx8jrin49fvznriohk352v8y=31-07-2022 00:00:00
Prathamesh TowersShivam DevelopersAm+Tlprs4blyz+6Rayvidq==31-03-2018 00:00:00
ShantaiJanardhan Sakharam Bhoir8Vst+Lz+Bpizsjevejaeqw==31-12-2019 00:00:00
Trinity HeightsAnil Thakurdas KursijaWvc22en0pj8xf4nns6yni562mzxhon6hrcxzhvnq9ba=30-05-2023 00:00:00
Pataskar Eclat Building No 3Pataskar Developers Pvt. Ltd40060231-12-2017 00:00:00
Pride Residency DaffodilSahil DevelopersHjxkrxbciqndpps2kbfykjeuviy/Lo/Zrr9k5yyiox0=31-12-2018 00:00:00
Horizon Palms IiK M DevelopersHlc1/Z7mu7nnu7wkmwcmkbcezya5/Mkjkkhyhtcdh3kjhy0sg4seem9codxfe0r330-04-2022 00:00:00
Laabh GloriaLaabh BuildwellOqp7rog+9Jlmkwxg5h5k15gryvjqkvsr7qrsi25vjzm=30-05-2023 00:00:00
Mahavir Kalpavruksha - J WingDamji Shamji Realty Pvt.Ltd.32Si2pjqdw2kv9dgpddxzc7hzhjhqoglpkgmc80v0meexnsskymeeiygrwfyxfatlysaz+Kctp2nb1h5x4ght3hnbnteqvfq+Bnhjdfjrruk7/Qpzxevk/R1vznamvg+U2ybi9zime0qo8ezesuowg==30-12-2023 00:00:00
Sai PalaceSai DeveopersDgmnztclbodnwjiji+Vveiboopjo+Fx5hjbcnjcjtny=31-03-2018 00:00:00
Mukund NiwasNew Vegas DevelopersNxorlkwdygklffrbpnbuwg==30-09-2020 00:00:00
Satgurus SolitaireBuildwell Land Developers Private LimitedWkgnycagav9avtopetyglcdibpq0os2tygumy7mtv/A=31-12-2017 00:00:00
Rosa Oasis Phase 2Uma EnterprisesLcwmlmbcwkopccf2ej8hi4acrlcozw85mti9w1gwfixohcwkqozcf4awswerkvhyqdbiyixet9aawv6vy5sweq==31-12-2018 00:00:00
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private LimitedYushcu2wpjpeucoiquv4mlgptqzmae3k+6Lyfoknhm9opr1qosvuempldhgv4woenbwf2fvxrq3buxvc8etwk3yp1xtm+Vxp2o/L8skqbdgpkb7lf2xlk7c7qubytksi30-12-2022 00:00:00
Parkwoods Building A1Aniline Construction Company Private LimitedHesaq9nctfjmzca8qz7srxn+Bukdnuu2nlep11rpudnmw2djdv9twrxnzx2ziodw31-03-2018 00:00:00
Metropolis - RIVERAANANT SQUARE108/2, 108/430-03-2025 00:00:00
Metropolis - Aquaris Phase 2ANANT SQUARE2/2330-09-2025 00:00:00
Metropolis - Aquaris Phase 1ANANT SQUARE2/2330-09-2024 00:00:00
Orovia Phase 1Vijay Suraksha Realty LlpTdebcpbe6jehpdgf7ikoxytuogb3j6scpoeck2ar7tz/26Vkokhd/Qdize09wwu+/9Jkteo0/Kt+Rck6wvg4aq==30-03-2023 00:00:00
Cosmos JewelsCosmos LifestyleEkbx4bdch+Kthflhchp/Memlm/+Hb1gvdqgy/K1i+Fg=31-03-2018 00:00:00
SubodhNew Homes Corporation/Du1zaescdrfgmtagyqicuhjfdkj21rsqphn0jz3uuq=30-09-2020 00:00:00
Vijay Vatika -5Vijay Suraksha Realty LlpXmtyt5cn9dvey6brdmowy8xpfar1al1anhs6uzwz1qk=30-09-2018 00:00:00
Ace Square Phase 1Anant SquareY7wg5zbjabavulofuswwh36t+M75w3k9g7d3kptnjqk=31-12-2017 00:00:00
Hill Spring Phase 1VelocityCapbnn6uzxafb9xwxb+Igyyx7d8qzwtfqozcpged4ww=30-06-2018 00:00:00
Puraniks CapitolPuranik Builders LimitedKfbrv+Hnys0lrlo1lemjyw==30-12-2036 00:00:00
Mahavir Kalpavruksha - Oak, Tulip, Alcacia, AlmondDamji Shamji Realty Private LimitedOwkdt1znwqmfpvq5epnpbd7jbktbuky6rdurrkuy45qsg8apnsnpavioyn2vg8bs+Tnuwryogcsq8bgmrbcgsw3fakqda9ihogeif2amkund60xrlubtv8kcow3d2itu30-12-2021 00:00:00
Dedhia Elita C WingJaydeep CorporationKtxie9dxa7i18agciggvudzr0schxg+Lffenznr3d+Wdrxvvvcnnd7zywfa3wo4u30-06-2018 00:00:00
Unnathi Woods Phase Vii AUnnathi EstatesKbgwarcrrgznhhb+Jt+Knw==30-12-2025 00:00:00
Tokyo Bay Phase - 2APuranik Tokyo Bay Private LimitedKfjt/Bi/Osqcnb5v9lyz5+Flvijt2mkxsqwqnqh4oofakpr4eos5gohwzzg33w4s30-12-2024 00:00:00
Platinum TowerHaware's Housing Development Finance Corporation Ltd.Ve5ryhgoinvvhml7tefvaqzxguehfk/Eyamce2rzxo3hvzkvmunhlkibucjjsy6z30-09-2022 00:00:00
Tokyo Bay Phase - 1Puranik Tokyo Bay Private LimitedFqzxa3zis/Dikh+Wvgafemmvveq3wt9qsussswxmvnw=30-10-2023 00:00:00
Rumahbali Phase 2Puranik Builders Limited7M3ij+Vst261txvv4aypolelb6k7urjz50f3pdv/Kg2a2gaaurccbsxmkpu1fsnhu9gh7cfbohxkxwbr64jw1fkap4ovy7gv5juggr3cjcipnkrfodrvupjmpyggffcx30-12-2023 00:00:00
Raunak HeightsUnnathi AssociatesB1o+Whhxrxk4lx4cmzd+1S5y6q5oq+L1x9oit2t61ne=30-12-2025 00:00:00
Ashok Smruti DefgM/S KeytechZkyt8sglj5zwaoql7eoqsq==31-12-2019 00:00:00
Aarambh - CM/S. Annapurna Lifespaces Llp7Ihunz6vvh9za4b2wseqwq==30-06-2026 00:00:00
Cosmos Enclave - ChestnutMonarch Developers6Xfrsekqn1vfein870i9sw==30-12-2023 00:00:00
Psk SkylarGururaj DevelopersDaehgd97kqf6zukencbyeefrk+Ubkgcrnxorqcvdysl4e2ktv5haz/Luvxcicyh130-12-2023 00:00:00
Ace HomesAarti EstatesRllpa9mh4pk3z5x30vwoza==30-12-2022 00:00:00
PelicanM/S Ace ConstructionsPeymgr7edu8x3bwn86475q==30-06-2018 00:00:00
Guru AshishShree Gurukrupa Ventures LlpEkycmc6j94nhl7d1zcsz9q==31-12-2018 00:00:00
Parkwoods D5Aniline Construction Company Private LimitedYj4hnmfydutf+Kye4ziikmxpsc8pvekxl1tbzsdgs2u=30-03-2026 00:00:00
Surendra VillaShivkrupa Construction And Developers Pvt LtdGg7glz/Aeznul+6Aqhkvgn6adttb2mfrygo0+Jkzlc0=15-07-2021 00:00:00
Unnathi Woods Phase ViiiUnnathi Estates3Wvu78jajfixkocdjbozzlezoqsrmgvwtgtsqilu7mwpofkrf7zojdamnxanj4okfrtkcq3ztvsmlc6kvwn01a7ji1ldts7mjhvqbgo5epm=30-06-2025 00:00:00
Trimity AshwaTrimity ConstructionsYbxzv9tsjwpvpr6mjirz9a==31-12-2017 00:00:00
Vihang ValleyVihang Infrastructure Pvt LtdNel5ayhy+Zw7s0zie/8Qi+Sv1zkkefnsekdn1lvbhk9wx53u0at3vf0nw9f/Aukmgucedh46wgr4jxzxfafzk8qkw0y6m+E9j1oew+Ajgljnye+0Tnwg6pcbwfsda/Ki7kd7opbk7es+Cxhgzyjfua==30-12-2026 00:00:00
Metropolis - Insignia TowersANANT SQUARE4/4, 4/5 And 6/114-04-2026 00:00:00
Mahavir Breeze Phase 1Damji Shamji Realty Pvt. Ltd.Wtbwt3x7u0syczfrtb7/Z7r2zu+G1ji9p3oc0l6z+7B7acylot3wcjbsmebxlo5fjsqhdufb6/Bdrkp81i8yqaoet0kzpvtdazza7kbxn2h/Shvqjiawzaqyoocpllc331-12-2024 00:00:00
Olive ResidencyGoodwill PropertiesH7koywjrvddgb6uxq+Ankxdb1a/Vkkevydnqkdptbfnetf8uocxt7yfuu48xvgzj30-12-2021 00:00:00
Hiranandani Westgate Phase 1SHODEN DEVELOPERS PRIVATE LIMITEDS.No. 138/2/15, 214/6, 214/8, 214/9A, 214/9B, 215/1, 215/2, 215/3A, 215/3B, 216/1, 216/2, 218/1, 218/2, 218/3, 218/4, 218/5, 218/6, 218/7, 219/1, 219/2, 219/3A, 219/3B, 219/4, 219/5, 219/6, 219/7, 220/1/A, 220/1/B, 220/2, 220/3, 220/4A, 220/4B, 220/5, 220/6, 221/1, 221/2, 222/1/A, 222/2/B, 222/2/C, 222/3, 222/4, 222/5, 222/6, 222/7, 222/8, 231/2/2/A, 231/2/2/B, 231/2/2/C, 231/2/2/D, 231/3/A, 231/3/B, 231/4, 231/6A, 231/6B, 232/1, 232/2, 232/3, 232/4, 232/5A, 232/5B31-10-2031 00:00:00
Dahlia Bldg A D And EHaware Engineers And Builders Private LimitedQzrvclapy/Nbnckxo52aiiult+Blspjxz5wybqcpnrc=30-04-2019 00:00:00
TaranganMaison Constructions Private LimitedYfitr+Xcfpdsmaxgkbmzpgz+2B50nrc5m9nn5d5cwxeon+Vcgb2ovw3o+Ds4tfjr31-05-2018 00:00:00
Sukur Enclave Phase 1Rajaram ConstructionGb2slhzhny4llyogjolopr4wzne2pxck5rxetg3qqbsjfyasnszypyv8xlhxjnhxxfbxdj2qv98vc65te1jks8tf5k1qgnhgjvrjnqn4rvhk8pvvbpt8hbvm2hwtvocl31-12-2018 00:00:00
Puranik Home Town - EPuranik Builders LimitedWazsfdolkfxaeyd+0Vaxfrlry3psbpmbomqoa4qrtbn9a1qgzp4dltaqhgbsy+Evxzovvp239bswitkxsr7pkw==30-12-2026 00:00:00
Delta Greenville - AsterDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-01-2031 00:00:00
Delta Greenville - CedarDelta Synergy LlpYnxklz8xzb2bicqrogyewzk5z4uievdtnk5qjt8j1ji=31-12-2030 00:00:00
Horizon Pearl IiKm DevelopersCfdijxvzkg306qy9geu0udaqbkmegbzbxrwnmalx2gfzbtfoow69k56g8ky3mitxebpisy+Bfxa+9R2vggd7p0xl/X3smweyalhheekbmpu=31-12-2028 00:00:00
Elysia D-4Vihang Infrastructure Pvt Ltd31-12-2031 00:00:00
PearlSagar EnterpriseYyaxhen2jtrjt4vu8yzuyg==31-08-2019 00:00:00
AnthuriumAarti EstatesFrtnoe+Acn0y7sz2bbc2zb7z1bleatj5cpc3l0lnak8ytqnqu0fgmuncllozkpcii1l0oxnhaljyzidm3+L1yw==30-10-2023 00:00:00
Ace Square Phase 2Anant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=30-06-2024 00:00:00
Horizon Heights DShreenath EnterprisesX8rgihhobgx3svrlfvpvvg==30-07-2018 00:00:00
KIPL Moryakhade Infrastructre Pvt. Ltd.S.No. 21/12,13,1430-06-2021 00:00:00
Spee Skytower Wing A And BSpee RealtorParel30-03-2024 00:00:00
6 CrystalCrystalstar Housing Developers Private LimitedExcz40/Gd9bh1ppb2pkaba==30-12-2025 00:00:00
Sumati HeightsTangent EnterprisesXzwax+4N+6Kqjddswgp9ya==30-12-2023 00:00:00
Vardhman Flora Phase -Ii - Vardhman HabitatVardhman Developers LtdGhodapdeo30-06-2024 00:00:00
ShubhadaSugee Twelve Developers LlpCzdhl96ucbbw8budaqczl1v/Nnkwpoeajdyjt2p1mvo=30-09-2024 00:00:00
UnioneSara RealtyHxb+Zqgtt7rng2wtdelntoioqvahlfbdpq4hckzba1i=30-06-2025 00:00:00
Intelligentia Segment By Haware PropertiesSuresh Kashinath Haware1Pwsmo0jgein00kqzhd8/G==31-12-2027 00:00:00
Shree SankalpShree ConstructionsK5sggkwkxffxbbgrphmjgg==31-07-2019 00:00:00
Joy SquareAnant Square7Zax2zx8kwsgfrhregnrez8io1dg24ru35hpfxhto0g=31-12-2019 00:00:00
Avatara Phase 1Anant Square30-09-2031 00:00:00
Horizon PearlKm DevelopersAbpwlgyfigior1huxez9m0zo+2Cdphkzfkctxhmngxuxurx4fe5domqqnbtjytjm38d8j2o3+Riuenlx0weqdftkklcjbjljhucmvdpl9sxgxd3/Ewhb8cbzz03o+Dyo/Dalgdutmhwuq0onyqyiza==30-04-2027 00:00:00
Ace EnclaveAce Signature Homes LlpQteztealwfqqs97tllfxug==31-12-2026 00:00:00
Metropolis BaysideANANT SQUAREGhodbunder Road31-05-2026 00:00:00
PINE WOODRDC VENTURES11/831-12-2017 00:00:00
Elita D3Vihang Infrastructure Pvt LtdPfxshpkxtbx4/3Gxmqqies75mkayayp8cmdf/Qufqqsyinhfphasy+Rbzqo5zyy7n7fwatputju04istqvs6hdjygdxxjwbr8qf1bowgqsck9yjmr/Ak50unkt+Psn4htioekg935y1z7iatq/Eh1y2hiyvpzwks0tjzfgris1eirwjwapl49zmz79hda+3Yfz1hxewges6az5ldzpfrpl1qeuveqm3qu/Pzzsmypgssnivnl75cm7nw2ucoyeo6gwyqvhs18xznevax1vwf4w==31-12-2029 00:00:00
Ceejay ResidencyPrime Realty LlpGo8rxrkjhxfgshblsgoryxcqz9mlnssrxqqtw1+Jws8c+2Yd5jsqbc5p7hsfsxqz30-06-2025 00:00:00
Buildarch DaisyBuildarch Land Devlopers Pvt. Ltd.Samwijgzszzkyonynpjid+Qxjyfz7h5lhsptznfu3ya=31-12-2024 00:00:00
PurushottamnayanGaurav EnterprisesH7xphgauie0vwaydpogpg3tl4k2epzvpjsl8an56mp2z2ylgqgh+Erdvdge4herkgap7r6b34j/Tz9719uh4hyfxsymo10klf7gail/Yusc=30-12-2022 00:00:00
Shivsharda Chs Ltd Phase IiShivshankar Singh &Amp; OthersSanman Singh Marg30-12-2023 00:00:00
Rosa SephoraAakash Darshan Buildcorp LlpM6kx+2Ybaxtfzhz0wu63nfbx1uuwjfrbiptk4fccs5m=30-06-2028 00:00:00
Rosa Manhattan Phase 3Sai Uma Construction Private Limited30-06-2032 00:00:00
Project Details
  • Project:
    Sukur Enclave Phase 1
  • Location:
  • Gb2slhzhny4llyogjolopr4wzne2pxck5rxetg3qqbsjfyasnszypyv8xlhxjnhxxfbxdj2qv98vc65te1jks8tf5k1qgnhgjvrjnqn4rvhk8pvvbpt8hbvm2hwtvocl
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Rajaram Construction
  • Phone:
  • Address:
  • Sumeet Enclave
Project RERA Details
MAHA REARA No: P51700001982
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Joshi Deshaware & Associate
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 31 Jul 2017
Last Retrived 13 Feb 2026
Sukur Enclave Phase 1 QR Code
Sukur Enclave Phase 1
MahaRERA - P51700001982
Apartment Details & Configuration
TypeArea
1 BHK32.77 Sq.mts. ( 353 Sq.ft. )
1 BHK34.5 Sq.mts. ( 371 Sq.ft. )
1 BHKS44.95 Sq.mts. ( 484 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sukur Enclave Phase 1last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space80% completed
80% Complete
Work Will Be Completed Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Work Will Be Completed Prior To Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo
Landscaping & Tree Planting80% completed
80% Complete
Groung Rg
Open Parking
Work Will Be Completed Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Will Be Done Prior To Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Will Be Done Prior To Oc
Water Supply
Work Will Be Done Prior To Oc
Buildings / Wings in Sukur Enclave Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sukur Enclave Phase 1 by Rajaram Constructionlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

17761 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

53 apartments in total
Total
53
Booked
6
Available
47

Saleable Area Statistics (Sq. ft.)

21353 Total
Total
21353
Booked
2566
Available
18787
Total 53 apartments in project. 6 apartments booked. 11% apartments booked.
Total 21353 Sq.ft. saleable area. 2566 saleable area booked.
12% area booked.

Building D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building DJan 1900201010121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.77 Sq.mts. ( 353 Sq.ft. )19
None Booked0% Booked
0% Booked
1 BHK34.5 Sq.mts. ( 371 Sq.ft. )16
1 BHKS44.95 Sq.mts. ( 484 Sq.ft. )18
53 total apartments / 6 apartments booked. 11% apartments booked.
Work Description in Building Building DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Rajaram Construction
for Project
Sukur Enclave Phase 1
last updated on 13 Feb 2026 as per information obtained from MARA RERA.