Project overview

Sukh Sagar Co-Op Hsg Society is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700051135. Sukh Sagar Co-Op Hsg Society is located at Plot No 4/S No 34/Hissa 1. This is a New being developed by Noble Infrastructure Builder And Developers.

Sukh Sagar Co-Op Hsg Society has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 150 to 502 Sq.ft. Carpet. The Project has total 30 of which 30 are currently available for sale.

Sukh Sagar Co-Op Hsg Society is being developed on a total land area of 6323 Sq.ft. out of which 145 Sq.ft. i.e 2% is reserved for recreational purposes. Sukh Sagar Co-Op Hsg Society has 1 Wings / Towers Sukh Sagar Co-Op Hsg Society

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sukh Sagar Co-Op Hsg Society
  • Location:
  • Plot No 4/S No 34/Hissa 1
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Noble Infrastructure Builder And Developers
  • Phone:
  • Address:
  • Dwarkapuri Villa
Project RERA Details
MAHA REARA No: P51700051135
Project Type Residential / Group Housing
RERA Project Status New
Architect Arti V Jamgoankar
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 13 Mar 2024
Last Retrived 26 Jul 2025
Sukh Sagar Co-Op Hsg Society QR Code
Sukh Sagar Co-Op Hsg Society
MahaRERA - P51700051135
Apartment Details & Configuration
TypeArea
1 BHK30.64 Sq.mts. ( 330 Sq.ft. )
1 BHK32.06 Sq.mts. ( 345 Sq.ft. )
1 BHK33.23 Sq.mts. ( 358 Sq.ft. )
1 BHK33.3 Sq.mts. ( 358 Sq.ft. )
2 BHK46.65 Sq.mts. ( 502 Sq.ft. )
Shop13.95 Sq.mts. ( 150 Sq.ft. )
Shop16.03 Sq.mts. ( 173 Sq.ft. )
Shop17.01 Sq.mts. ( 183 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sukh Sagar Co-Op Hsg Societylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Yet Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Mjp Get Connection After O.C.
Buildings / Wings in Sukh Sagar Co-Op Hsg Society
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sukh Sagar Co-Op Hsg Society by Noble Infrastructure Builder And Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6323 Sq. ft.

Project Area

145 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

30 apartments in total
Total
30
Booked
0
Available
30

Saleable Area Statistics (Sq. ft.)

10832 Total
Total
10832
Booked
0
Available
10832
Total 30 apartments in project. 0 apartments booked. 0% apartments booked.
Total 10832 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Sukh Sagar Co-Op Hsg Society

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sukh Sagar Co-Op Hsg SocietyDec 202561010036
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.64 Sq.mts. ( 330 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK32.06 Sq.mts. ( 345 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK33.23 Sq.mts. ( 358 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK33.3 Sq.mts. ( 358 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK46.65 Sq.mts. ( 502 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop13.95 Sq.mts. ( 150 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.03 Sq.mts. ( 173 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.01 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
30 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sukh Sagar Co-Op Hsg SocietyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Noble Infrastructure Builder And Developers
for Project
Sukh Sagar Co-Op Hsg Society
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation