Project overview

Star Residency 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000021578. Star Residency 1 is located at Varangade Road. This is a New Project being developed by Starwood Developers Limited.

Star Residency 1 has 1 BHK & Shop Apartments with carpet areas ranging from 145 to 287 Sq.ft. Carpet. The Project has total 44 of which 37 are currently available for sale.

Star Residency 1 is being developed on a total land area of 9727 Sq.ft. Star Residency 1 has 1 Wings / Towers B No 4 Star Residency1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Star Residency 1
  • Location:
  • Varangade Road
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Starwood Developers Limited
  • Phone:
  • Address:
  • Plot No 86, Sanghavi Sadan, Off Yavar Ali Jung Marg, Western Express Highway, Near Silver Metropolis, Goregaon East, 400063
Project RERA Details
MAHA REARA No: P99000021578
Project Type Residential
RERA Project Status New Project
Funding Bank ICICI BANK LTD
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Jan 2024
Last Retrived 28 Jul 2025
Star Residency 1 QR Code
Star Residency 1
MahaRERA - P99000021578
Apartment Details & Configuration
TypeArea
1 BHK26.67 Sq.mts. ( 287 Sq.ft. )
Shop13.48 Sq.mts. ( 145 Sq.ft. )
Shop15.53 Sq.mts. ( 167 Sq.ft. )
Shop17.29 Sq.mts. ( 186 Sq.ft. )
Shop23.44 Sq.mts. ( 252 Sq.ft. )
Shop23.47 Sq.mts. ( 253 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Star Residency 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Construction In Progess
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Electric Cabin
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
As Per Layout
Open Parking
As Per Layout
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Yet To Be Approved
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply60% completed
60% Complete
Na
Buildings / Wings in Star Residency 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Star Residency 1 by Starwood Developers Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

9727 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

44 apartments in total
Total
44
Booked
7
Available
37

Saleable Area Statistics (Sq. ft.)

12064 Total
Total
12064
Booked
2010
Available
10054
Total 44 apartments in project. 7 apartments booked. 15% apartments booked.
Total 12064 Sq.ft. saleable area. 2010 saleable area booked.
17% area booked.

B No 4 Star Residency1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B No 4 Star Residency1Dec 20225100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.67 Sq.mts. ( 287 Sq.ft. )37
Shop13.48 Sq.mts. ( 145 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.53 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.29 Sq.mts. ( 186 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop23.44 Sq.mts. ( 252 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.47 Sq.mts. ( 253 Sq.ft. )2
None Booked0% Booked
0% Booked
44 total apartments / 7 apartments booked. 15% apartments booked.
Work Description in Building B No 4 Star Residency1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Starwood Developers Limited
for Project
Star Residency 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation