Project overview

Star Height is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000008026. Star Height is located at 9/1, 90/1. This is a Ongoing being developed by Eric Infrastructure.

Star Height has RESIDENTIAL AND COMM Apartments with carpet areas ranging from 22268 to 22268 Sq.ft. Carpet. The Project has total 54 of which 2 are currently available for sale.

Star Height is being developed on a total land area of 6687 Sq.ft. Star Height has 1 Wings / Towers Star Height

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Star Height
  • Location:
  • 9/1, 90/1
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2019
Developer Details

  • Developer:
    Eric Infrastructure
  • Phone:
  • Address:
  • Raj Madhur Chs Ltd
Project RERA Details
MAHA REARA No: P99000008026
Project Type Others
RERA Project Status Ongoing
Architect Ajay Wade & Associates
Funding Bank BANK OF BARODA
Proposed Possession 30 Jun 2019
Revised Possession 30 Jun 2019
Extended Possession 30 Sep 2024
Litigations No Litigations
Last Modified 14 Jul 2025
Last Retrived 28 Jul 2025
Star Height QR Code
Star Height
MahaRERA - P99000008026
Apartment Details & Configuration
TypeArea
RESIDENTIAL AND COMM2068.72 Sq.mts. ( 22268 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Star Heightlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Facility Available In A Larger Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal100% completed
95% Complete
Na
Storm Water Drains100% completed
95% Complete
Facility Available In A Larger Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Facility Will Start Once Vvmc Water Supply Commenc
Buildings / Wings in Star Height
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Star Height by Eric Infrastructurelast updated on 28 Jul 2025 as per information obtained from MARA RERA.

6687 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

54 apartments in total
Total
54
Booked
52
Available
2

Saleable Area Statistics (Sq. ft.)

1202456 Total
Total
1202456
Booked
1157920
Available
44535
Total 54 apartments in project. 52 apartments booked. 96% apartments booked.
Total 1202456 Sq.ft. saleable area. 1157920 saleable area booked.
96% area booked.

Star Height

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Star HeightDec 202213101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL AND COMM2068.72 Sq.mts. ( 22268 Sq.ft. )54
52 Booked96% Booked
96% Booked
54 total apartments / 52 apartments booked. 96% apartments booked.
Work Description in Building Star HeightCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Eric Infrastructure
for Project
Star Height
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation