Spm Lake City Phase Ii Part 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700024828. Spm Lake City Phase Ii Part 2 is located at 421503. This is a New Project being developed by Kothari &Amp; Deshmukh Landmark Llp.

Spm Lake City Phase Ii Part 2 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 297 to 388 Sq.ft. Carpet. The Project has total 184 of which 184 are currently available for sale.

Spm Lake City Phase Ii Part 2 is being developed on a total land area of 132828 Sq.ft. out of which 21782 Sq.ft. i.e 16% is reserved for recreational purposes. Spm Lake City Phase Ii Part 2 has 4 Wings / Towers Wing H,Wing I,Wing J,Wing K

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Spm Lake City Phase Ii Part 2
  • Location:
  • 421503
  • Const. Stage:
    New Project
  • Possession:
    28 Feb 2026
Developer Details

  • Developer:
    Kothari &Amp; Deshmukh Landmark Llp
  • Phone:
  • Address:
  • House No 4, S No 56/2, Karav, Karav, Karav, 421503
Project RERA Details
MAHA REARA No: P51700024828
Project Type Residential
RERA Project Status New Project
Funding Bank FEDERAL Bank
Proposed Possession 28 Feb 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 05 Aug 2020
Last Retrived 28 Jul 2025
Spm Lake City Phase Ii Part 2 QR Code
Spm Lake City Phase Ii Part 2
MahaRERA - P51700024828
Apartment Details & Configuration
TypeArea
1 BHK24.23 Sq.mts. ( 261 Sq.ft. )
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )
1 BHK30.12 Sq.mts. ( 324 Sq.ft. )
1 BHK32.25 Sq.mts. ( 347 Sq.ft. )
1 BHK38.61 Sq.mts. ( 416 Sq.ft. )
1RK18.28 Sq.mts. ( 197 Sq.ft. )
1RK16.45 Sq.mts. ( 177 Sq.ft. )
1 BHK26.15 Sq.mts. ( 281 Sq.ft. )
2 BHK33.75 Sq.mts. ( 363 Sq.ft. )
1 BHK27.56 Sq.mts. ( 297 Sq.ft. )
1 BHK32.51 Sq.mts. ( 350 Sq.ft. )
2 BHK36.08 Sq.mts. ( 388 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Spm Lake City Phase Ii Part 2last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
0
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
0
Buildings / Wings in Spm Lake City Phase Ii Part 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Spm Lake City Phase Ii Part 2 by Kothari &Amp; Deshmukh Landmark Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

132828 Sq. ft.

Project Area

21782 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

184 apartments in total
Total
184
Booked
0
Available
184

Saleable Area Statistics (Sq. ft.)

52147 Total
Total
52147
Booked
0
Available
52147
Total 184 apartments in project. 0 apartments booked. 0% apartments booked.
Total 52147 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing HFeb 20255101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.23 Sq.mts. ( 261 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK30.12 Sq.mts. ( 324 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK32.25 Sq.mts. ( 347 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK38.61 Sq.mts. ( 416 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK18.28 Sq.mts. ( 197 Sq.ft. )8
None Booked0% Booked
0% Booked
36 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing HCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing IFeb 20255101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.23 Sq.mts. ( 261 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK30.12 Sq.mts. ( 324 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK16.45 Sq.mts. ( 177 Sq.ft. )8
None Booked0% Booked
0% Booked
1RK18.28 Sq.mts. ( 197 Sq.ft. )4
None Booked0% Booked
0% Booked
52 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ICompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing JFeb 20255100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.15 Sq.mts. ( 281 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK32.25 Sq.mts. ( 347 Sq.ft. )8
None Booked0% Booked
0% Booked
1RK18.28 Sq.mts. ( 197 Sq.ft. )20
None Booked0% Booked
0% Booked
2 BHK33.75 Sq.mts. ( 363 Sq.ft. )8
None Booked0% Booked
0% Booked
60 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing JCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing K

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing KFeb 20255101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.56 Sq.mts. ( 297 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK32.51 Sq.mts. ( 350 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK36.08 Sq.mts. ( 388 Sq.ft. )16
None Booked0% Booked
0% Booked
36 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing KCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Kothari &Amp; Deshmukh Landmark Llp
for Project
Spm Lake City Phase Ii Part 2
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation