Project overview

Spm Lake City Phase Ii Part 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700024808. Spm Lake City Phase Ii Part 1 is located at Survey No 56 Hissa No 2. This is a New being developed by Kothari & Deshmukh Landmark Llp.

Spm Lake City Phase Ii Part 1 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 282 to 416 Sq.ft. Carpet. The Project has total 199 of which 155 are currently available for sale.

Spm Lake City Phase Ii Part 1 is being developed on a total land area of 66737 Sq.ft. Spm Lake City Phase Ii Part 1 has 3 Wings / Towers Wing D,Wing E,Wing L

ProjectDeveloperLocationPossession
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Mount View R4 To R7Himanshu Builders & DevelopersS No 67/3A 68/9B31-12-2023 00:00:00
Balaji VivantaMayur Enterprises Builders & DevelopersPlot No 3 ,Hissa No 1 ,2,3 ,4 Old Survey No 71 Hissa No 1,231-12-2023 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Sai Geeta Apt.K K EnterprisesSurvey No 29, H N 5A, Plot No 7231-12-2023 00:00:00
Laxminarayan ParkJalaram InfraSurvey No 63 Hissa No331-12-2023 00:00:00
Mangaljyot Co Op Hsg Soc LtdShridhar Dattatray Patil8/B/1/2 And 9/B/1/331-12-2026 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Dream AvenueDream Maruti RealtorsS No 15, H No 4 - S No 16, H No 331-12-2025 00:00:00
Kisan HeightsPravin Kisan BhoirS No 86/1/130-09-2027 00:00:00
Regency Sarvam Phase 12Regency Nirman LtdS No.42/1, 42/2, 42/3, 42/4A/1, 42/4A/2, 42/5, 42/6, 47/1, 50/1A, 50/2, 220/1, 201/1, 223/130-11-2024 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Thanekar CivicShree Swami Samarth EnterprisesS No 133, H No 209-04-2024 00:00:00
Saurabh ResidencyM/S Krishna Builders & DevelopersS No 77 , H No 2/1730-06-2024 00:00:00
Ved ParadiseKulkarni And Associates896631-12-2024 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Dashmesh ParkSatyam ConstructionsCts No 2340931-03-2023 00:00:00
Shankeshwar DarshanKalpvriksh Homes LlpOld Sno 559 New Sno 207 Hno 1,2 Old Sno 560 New Snio 165 Hno 1Pt31-12-2024 00:00:00
Eknath Heights - 1Omkar EnterprisesSurvey No 123 Hissa No 331-12-2022 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
SambhaviShree Vakratunda DevelopersSurvey No 531-10-2024 00:00:00
Shree Mangal Narayan ResidencyN V ConstructionCts 9721 To973431-12-2023 00:00:00
Vakratunda HomesNarayan Sunil RanePlot No 4,S .No 108, Hissa No 131-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Hemant Shishir Co.Op HsgNarendra Kalyanji Patel3512-352131-12-2023 00:00:00
Fortune EmporioQuanta Realty LlpCts No 4090 To 4096,4166 To 4171,4240,4241 New Sno 37 Hno 3C31-12-2025 00:00:00
The Valaji EstateFore Holdings4065,4093-4097,4099-410205-07-2024 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Fiora EMacrotech Developers Limited260/1A (Pt)31-03-2026 00:00:00
Savaliya HeightsShree Savaliya Homes LlpOld Sno 477 New Sno 119 Hno 131-12-2026 00:00:00
Ramakant ArcadeVastu EnterprisesCts No. 244, 25431-05-2023 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Shivaay AvyaanShreeram BuildconNew Survey 7,281(Old), Hissa No.230-11-2025 00:00:00
Dosti Desire - Phase 2D.D. Associates85/731-08-2027 00:00:00
Shubh Mangalam Phase IiShubh RealitySr No 106 Hissa No 125-12-2026 00:00:00
Cyber Square - 1Greenscape It Park LlpD-102,D-103 &D-10431-03-2027 00:00:00
Delta LuxuriaShreenathji Organisers Pvt LtdPlot No 6130-04-2027 00:00:00
Giriraj SparshDura Vida Associates77 Tika No 18 Naupada30-06-2025 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Sai CityOm Sai Builders & DevelopersSurvey No.3/1/E,3/1/D,3/1/C31-12-2031 00:00:00
Marathon Nextown JasperMarathon Ener-Gen140,141/2,141/1,142/3,220/1B31-12-2027 00:00:00
Shyam ParkVishnu Shyamlal SachdevCts . No. 2077031-12-2025 00:00:00
Kamdhenu VogueM/S Kamdhenu Lifespaces20 Plus 2131-03-2027 00:00:00
Sai Galaxy A- Wing And C- WingJash DevelopersS. No. 10 Hissa No. 231-12-2025 00:00:00
Tanishka ResidencyAnmol DevelopersSurvey No 61 Hissa No 2C/9A/10D/2B, Survey No 80 Hissa No 9A15-01-2023 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
The Universe Neptune - BGayasuddin Riyazuddin KhanS No 112/130-06-2024 00:00:00
Siyara Fortune Building A Wing BShakti Realty8145, 8146, 8153, 8172, 8176 To 820231-12-2027 00:00:00
Satyaneelayam Co Op Hsg SocietyYash Infra749 B31-12-2025 00:00:00
Unique ElanzaUnique Star Developers LlpS No 29 H No 4 And S No 30 H No 5 Village Ghodbunder25-03-2027 00:00:00
Sindhri SagarRounak Shyam PanjwaniU No 75(P) Cts No 30783 9458 (P) Sheet No 49 R .No 163931-12-2024 00:00:00
Swarup TowerBaba RealtySurvey No 124 Hissa No 1/B31-12-2024 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Aai Mauli ParkHendar Laxman MhatreS. No. 1731-12-2025 00:00:00
Shubham Monolith D WingGaurivinayak Builders And Developers Pvt LtdSurvey No 30 Hissa No 15A31-12-2026 00:00:00
Godrej Ascend Phase 3Godrej Properties Limited39 Part, 41/1 Part31-10-2029 00:00:00
Shivalaya Complex Ph 2 Wing BM/S Balaji Group Of CompaniesSurvey No 17 Hissa No 131-12-2022 00:00:00
Amina Bi Inamdar TowerRoyal Infra61 To 6431-03-2024 00:00:00
Seva SmrutiNeelpadma AssociatesC.T.S.No 1150 To 115131-05-2024 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Ramdev BaseraRamdev BaseraOld Sno 225 New Sno 188 Hno 7, 9Pt, 10Pt31-12-2025 00:00:00
Navkar AvenueNavkar EnterprisesCts No 18 & 19/ T No 1031-12-2025 00:00:00
Krishna Highlands Phase 1M/S Rohan ConstructionSurvey No 6 Hissa No 3B31-12-2025 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Rajoba SolitaireM/S. Gangadhar Associates58B/1A, Sector Ii, Tikka No. 2 Village Thane30-06-2026 00:00:00
Shree Gajanan Enterprises Rukhmini ChsShree Gajanan Enterprises Rukhmini ChsPlot No. 331-07-2026 00:00:00
Dosti West County - Phase 5 - Dosti Olive - Wing ADosti EnterprisesSurvey No 16/10/A/1(Pt), 16/9/A(Pt), 16/8/A(Pt)30-09-2028 00:00:00
Ganesh Villa ChslBhavani EnterprisesSurvey No 7A/4/A/330-06-2026 00:00:00
Mukund VishnuShree Swami Samartha AssociatesTika No 12 Cst No 103A 2A 103A 2B Village Pachpakhadi30-12-2021 00:00:00
Anjani SparshGeeta Space Realtors249-2, 249-730-12-2020 00:00:00
Mohan Nano Estates IiiMohan Lifespaces Llp24/1,24/2P,24/6P,24/8,24/9,25/1,25/231-12-2019 00:00:00
Building No. 2 Wings A And B AlpineSd Corporation Private Limited840 A/130-12-2020 00:00:00
PrathamRoodraksh Probuilder And Infracon Private LimitedCts 284B 284D31-12-2019 00:00:00
Silver SpringAnudan Properties Private LimitedF. P.4330-12-2022 00:00:00
Crystal HeightsNirala Construction424B, 425, 416B, 421/1 To 3, 421, 417/1 To 430-12-2021 00:00:00
Nirmaan HeightsChaitanya DevelopersCts 233A, 234B And Benefits Of Plots Under Set Back/Road Widening Bearing Cts 234C And 234D Borivali09-03-2022 00:00:00
Reliable ResidencyReliable InfraventuresPLOT NO 72 SC S NO 12, 130-04-2024 00:00:00
Aadi AarambhNirman Construction129/1 A And 129/1B28-02-2018 00:00:00
Pushpa ParkVas Infrastructure Ltd.75715-08-2023 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Project Details
  • Project:
    Spm Lake City Phase Ii Part 1
  • Location:
  • Survey No 56 Hissa No 2
  • Const. Stage:
    New
  • Possession:
    30 Jan 2026
Developer Details

  • Developer:
    Kothari & Deshmukh Landmark Llp
  • Phone:
  • Address:
  • S No 56/2
Project RERA Details
MAHA REARA No: P51700024808
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 30 Jan 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Mar 2020
Last Retrived 26 Jul 2025
Spm Lake City Phase Ii Part 1 QR Code
Spm Lake City Phase Ii Part 1
MahaRERA - P51700024808
Apartment Details & Configuration
TypeArea
1 BHK24.17 Sq.mts. ( 260 Sq.ft. )
1 BHK24.33 Sq.mts. ( 262 Sq.ft. )
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )
1 BHK32.25 Sq.mts. ( 347 Sq.ft. )
1RK16.45 Sq.mts. ( 177 Sq.ft. )
1 BHK24.23 Sq.mts. ( 261 Sq.ft. )
1RK16.71 Sq.mts. ( 180 Sq.ft. )
1RK18.28 Sq.mts. ( 197 Sq.ft. )
1 BHK38.63 Sq.mts. ( 416 Sq.ft. )
2 BHK33.75 Sq.mts. ( 363 Sq.ft. )
2 BHK36.26 Sq.mts. ( 390 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Spm Lake City Phase Ii Part 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
0
Electrical Meter Room, Sub-Station, Receiving Station
Not Commenced. Will Be Given As Per Tmc Dcr
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Spm Lake City Phase Ii Part 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Spm Lake City Phase Ii Part 1 by Kothari & Deshmukh Landmark Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

66737 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

199 apartments in total
Total
199
Booked
44
Available
155

Saleable Area Statistics (Sq. ft.)

53875 Total
Total
53875
Booked
12413
Available
41462
Total 199 apartments in project. 44 apartments booked. 22% apartments booked.
Total 53875 Sq.ft. saleable area. 12413 saleable area booked.
23% area booked.

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJan 20255101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.17 Sq.mts. ( 260 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK24.33 Sq.mts. ( 262 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )32
8 Booked25% Booked
25% Booked
1 BHK32.25 Sq.mts. ( 347 Sq.ft. )12
1RK16.45 Sq.mts. ( 177 Sq.ft. )8
80 total apartments / 10 apartments booked. 12% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJan 20255101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.23 Sq.mts. ( 261 Sq.ft. )20
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )20
1RK16.45 Sq.mts. ( 177 Sq.ft. )8
1RK16.71 Sq.mts. ( 180 Sq.ft. )4
1 Booked25% Booked
25% Booked
1RK18.28 Sq.mts. ( 197 Sq.ft. )24
7 Booked29% Booked
29% Booked
76 total apartments / 13 apartments booked. 17% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

Wing L

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing LJan 20255101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.2 Sq.mts. ( 282 Sq.ft. )16
8 Booked50% Booked
50% Booked
1 BHK32.25 Sq.mts. ( 347 Sq.ft. )12
9 Booked75% Booked
75% Booked
1 BHK38.63 Sq.mts. ( 416 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK33.75 Sq.mts. ( 363 Sq.ft. )12
4 Booked33% Booked
33% Booked
2 BHK36.26 Sq.mts. ( 390 Sq.ft. )2
None Booked0% Booked
0% Booked
43 total apartments / 21 apartments booked. 48% apartments booked.
Work Description in Building Wing LCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress25% done
25% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kothari & Deshmukh Landmark Llp
for Project
Spm Lake City Phase Ii Part 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation