Project overview

Southfield Gravity is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800029080. Southfield Gravity is located at 732 To 737. This is a New being developed by Southfield Buildcon Llp.

Southfield Gravity has 1 BHK Apartments with carpet areas ranging from 331 to 332 Sq.ft. Carpet. The Project has total 144 of which 0 are currently available for sale.

Southfield Gravity is being developed on a total land area of 55919 Sq.ft. out of which 11430 Sq.ft. i.e 20% is reserved for recreational purposes. Southfield Gravity has 2 Wings / Towers Gravity D-Springs,Gravity D1-Orion

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Southfield Gravity
  • Location:
  • 732 To 737
  • Const. Stage:
    New
  • Possession:
    29 Feb 2024
Developer Details

  • Developer:
    Southfield Buildcon Llp
  • Phone:
  • Address:
  • No 1
Project RERA Details
MAHA REARA No: P51800029080
Project Type Residential / Group Housing
RERA Project Status New
Architect Sundeep Amrutkar
Funding Bank
Proposed Possession 29 Feb 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Jul 2025
Last Retrived 26 Jul 2025
Southfield Gravity QR Code
Southfield Gravity
MahaRERA - P51800029080
Apartment Details & Configuration
TypeArea
1 BHK30.49 Sq.mts. ( 328 Sq.ft. )
2 BHK42.13 Sq.mts. ( 453 Sq.ft. )
2 BHK45.81 Sq.mts. ( 493 Sq.ft. )
1 BHK30.72 Sq.mts. ( 331 Sq.ft. )
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Southfield Gravitylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Mcgm Plan
Energy management
As Per Mcgm Plan
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
As Per Mcgm Plan
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
As Per Mcgm Plan
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Mcgm Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
As Per Mcgm Plan
Water Supply
As Per Mcgm Plan
Buildings / Wings in Southfield Gravity
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Southfield Gravity by Southfield Buildcon Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

55919 Sq. ft.

Project Area

11430 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

144 apartments in total
Total
144
Booked
144
Available
0

Saleable Area Statistics (Sq. ft.)

53375 Total
Total
53375
Booked
53375
Available
0
Total 144 apartments in project. 144 apartments booked. 100% apartments booked.
Total 53375 Sq.ft. saleable area. 53375 saleable area booked.
100% area booked.

Gravity D-Springs

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gravity D-SpringsFeb 2024231010052
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.49 Sq.mts. ( 328 Sq.ft. )21
21 Booked100% Booked
100% Booked
2 BHK42.13 Sq.mts. ( 453 Sq.ft. )19
19 Booked100% Booked
100% Booked
2 BHK45.81 Sq.mts. ( 493 Sq.ft. )21
21 Booked100% Booked
100% Booked
61 total apartments / 61 apartments booked. 100% apartments booked.
Work Description in Building Gravity D-SpringsCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gravity D1-Orion

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gravity D1-OrionFeb 202423101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.72 Sq.mts. ( 331 Sq.ft. )39
39 Booked100% Booked
100% Booked
1 BHK30.86 Sq.mts. ( 332 Sq.ft. )44
44 Booked100% Booked
100% Booked
83 total apartments / 83 apartments booked. 100% apartments booked.
Work Description in Building Gravity D1-OrionCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Southfield Buildcon Llp
for Project
Southfield Gravity
last updated on 26 Jul 2025 as per information obtained from MARA RERA.