Project overview

Somnath Avenue is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000056009. Somnath Avenue is located at 111. This is a New being developed by Somnath Builders & Developers.

Somnath Avenue has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 125 to 486 Sq.ft. Carpet. The Project has total 74 of which 74 are currently available for sale.

Somnath Avenue is being developed on a total land area of 6788 Sq.ft. out of which 156602 Sq.ft. i.e 2307% is reserved for recreational purposes. Somnath Avenue has 3 Wings / Towers Type B6 Sector No 1 Bldg No 4 Wing B,Type B6 Sector No 1 Bldg No 4 Wing C,Type C4 Sector No 1 Bldg No 4 Wing A

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Somnath Avenue
  • Location:
  • 111
  • Const. Stage:
    New
  • Possession:
    31 Dec 2033
Developer Details

  • Developer:
    Somnath Builders & Developers
  • Phone:
  • Address:
  • Heramb Apartment
Project RERA Details
MAHA REARA No: P99000056009
Project Type Others
RERA Project Status New
Architect Ajay Wade & Associates
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2033
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 May 2024
Last Retrived 28 Jul 2025
Somnath Avenue QR Code
Somnath Avenue
MahaRERA - P99000056009
Apartment Details & Configuration
TypeArea
1 BHK28.72 Sq.mts. ( 309 Sq.ft. )
1 BHK32.95 Sq.mts. ( 355 Sq.ft. )
1RK20.19 Sq.mts. ( 217 Sq.ft. )
1 BHK30.83 Sq.mts. ( 332 Sq.ft. )
1 BHK31.27 Sq.mts. ( 337 Sq.ft. )
1 BHK32.32 Sq.mts. ( 348 Sq.ft. )
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )
1 BHK37.34 Sq.mts. ( 402 Sq.ft. )
2 BHK43.96 Sq.mts. ( 473 Sq.ft. )
2 BHK45.11 Sq.mts. ( 486 Sq.ft. )
Shop11.6 Sq.mts. ( 125 Sq.ft. )
Shop13.24 Sq.mts. ( 143 Sq.ft. )
Shop14.22 Sq.mts. ( 153 Sq.ft. )
Shop14.35 Sq.mts. ( 154 Sq.ft. )
Shop14.75 Sq.mts. ( 159 Sq.ft. )
Shop15.05 Sq.mts. ( 162 Sq.ft. )
Shop19.02 Sq.mts. ( 205 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Somnath Avenuelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Somnath Avenue
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Somnath Avenue by Somnath Builders & Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

6788 Sq. ft.

Project Area

156602 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

74 apartments in total
Total
74
Booked
0
Available
74

Saleable Area Statistics (Sq. ft.)

23329 Total
Total
23329
Booked
0
Available
23329
Total 74 apartments in project. 0 apartments booked. 0% apartments booked.
Total 23329 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Type B6 Sector No 1 Bldg No 4 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type B6 Sector No 1 Bldg No 4 Wing BDec 203341000100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.72 Sq.mts. ( 309 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK32.95 Sq.mts. ( 355 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK20.19 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type B6 Sector No 1 Bldg No 4 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress45% done
45% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type B6 Sector No 1 Bldg No 4 Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type B6 Sector No 1 Bldg No 4 Wing CDec 203341000100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.72 Sq.mts. ( 309 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK32.95 Sq.mts. ( 355 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK20.19 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type B6 Sector No 1 Bldg No 4 Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress45% done
45% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type C4 Sector No 1 Bldg No 4 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type C4 Sector No 1 Bldg No 4 Wing ADec 203341000100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.83 Sq.mts. ( 332 Sq.ft. )15
None Booked0% Booked
0% Booked
1 BHK31.27 Sq.mts. ( 337 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK32.32 Sq.mts. ( 348 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK37.34 Sq.mts. ( 402 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK43.96 Sq.mts. ( 473 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK45.11 Sq.mts. ( 486 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.6 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.24 Sq.mts. ( 143 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.22 Sq.mts. ( 153 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.35 Sq.mts. ( 154 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.75 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.05 Sq.mts. ( 162 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.02 Sq.mts. ( 205 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type C4 Sector No 1 Bldg No 4 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress20% done
20% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress45% done
45% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Somnath Builders & Developers
for Project
Somnath Avenue
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation