Project overview

Solitaire is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008101. Solitaire is located at Cts No 855 C. This is a Ongoing being developed by Solitaire Constructions.

Solitaire has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 286 to 713 Sq.ft. Carpet. The Project has total 150 of which 68 are currently available for sale.

Solitaire is being developed on a total land area of 37309 Sq.ft. out of which 1091 Sq.ft. i.e 3% is reserved for recreational purposes. Solitaire has 2 Wings / Towers Om Datta Krupa Welfare Sra Sahakari Gruhanirman S,Solitaire Heights

ProjectDeveloperLocationPossession
Sankalp HeritageShyam Biharilal Gehani986/1 T O4, 98631-12-2019 00:00:00
Sky Residency Loksadan Chs Phase 1 Up To G Plus 7Pt.Sky Property Developers Private Limited766, 766/1 To 531-12-2017 00:00:00
Aqsa Palace Chs LtdK T Group400064, Mumbai Suburban30-09-2017 00:00:00
Sky CrestSky Property Developers Private LimitedCts Number 37 37/A And 38 38/1 To 38/731-01-2021 00:00:00
Raj NirmanFerro Build682/682/1 To 228-06-2018 00:00:00
Unity ComplexR B Shah And CoCts No 278Pt 280Pt 282 283 284 284/1 To 22 285 285/1 To 37 286 287 289 290 291 29230-12-2021 00:00:00
Redevelopment Of Khatri Apartments Cooperative Housing Society LimitedSrp Realtors Privaye LimitedSurvey No 36, Cts No 747A31-12-2019 00:00:00
Tower 28Shiv Shakti Builders And Developers19/1 To 6730-06-2022 00:00:00
Bhagat GrandeurChirag Agro Fins Private LimitedCts 243A31-12-2018 00:00:00
21 HillsAmar Developers679/1 To 7 Of Village Malad, Cts Nos 67930-06-2018 00:00:00
Laxman NiwasYash RealtorsCts 83 930-06-2018 00:00:00
Jalan NiwasKarmvir Intelligent Housing Private Limited400064, Mumbai Suburban31-12-2022 00:00:00
Om HeightsKosmos &Amp; Apple RealtyMalad31-12-2020 00:00:00
Conwood Housing-Palace RoyaleConwood Housing Private Limited202, 202-B, 202-A30-09-2020 00:00:00
Sahakar AvenueSahakar Corporation551/1 To 531-12-2020 00:00:00
AdhritMundara DevelopersCts 838B 838B 1To 90 840 841 Pt 841 1To 53 And 58 To 6330-10-2023 00:00:00
Udyam Kunj Chs Redevelopment Phase IMahendra Mhatre40009731-12-2017 00:00:00
Gaurav SocietyPadmavati Maitri Corporation LlpMalad (East)31-12-2020 00:00:00
Divyam ResidencyBhavesh Mahendra Mehta437 1 To 11, 43731-12-2017 00:00:00
Romell Diva Phase Ii - 17Th To 20Th FoorRomell Real Estate Private Limited954B And 954D30-12-2025 00:00:00
Liberty Garden Chs LtdK T Group400064, Mumbai Suburban18-05-2017 00:00:00
Mandlik Nagar Chs Ltd Phase Ii Rehab Wing E Pt And FTriumph Builders Llp29 Pt31-12-2018 00:00:00
Horizon JewelHorizon Dream Homes Private Limited10B, Cts No 10A31-12-2019 00:00:00
Darpan HeightsDudhal Infra461, 4611 To 4.30-06-2018 00:00:00
Sainik EnterprisesCaptain Dilip Kopikar610/B/1 Rani Sati Marg Malad East31-12-2018 00:00:00
Chandraraj ComplexShree Sai Shraddha Associates15/C20-03-2018 00:00:00
New Simit ApartmentReliable Buildhights Llp786-1, 786-2, S.No.78610-10-2019 00:00:00
Malad ShantiSachit Thakkar939/A/1431-12-2018 00:00:00
Raj Rani PrideGeetaraj Realtors463 463/1 To 463/731-12-2020 00:00:00
Jay Kirti Chs LtdRajendra ShahMumbai Suburban, 40006431-12-2017 00:00:00
Sainath Malad Sra ChsShree Mahalaxmi Associates578 1 To 2831-12-2017 00:00:00
Bhoomi Celestia B-WingSashwat Construwell Private Limited554 554/1To10 555 555/1To3 556A 557 557/1To3 558To560 562 563 580Pt To 582 589A 590 593A30-12-2021 00:00:00
Sun-Vision AvenueWoodland Constructions Pvt Ltd400064, Mumbai Suburban31-03-2018 00:00:00
Royal Pearl / Royal SankalpRoyal Realtors154, 154/1 To 154/3931-12-2019 00:00:00
Saylee EnclaveFunsign Housing Pvt. Ltd960/ 1 To 7, 96030-10-2021 00:00:00
Romell Diva Phase Iii - 21St To 23Rd FloorRomell Real Estate Private Limited954B And 954D30-12-2025 00:00:00
Irene Wing A Phase 1Sheth Creators And Sunvision Private Limited231, 230, 23230-12-2025 00:00:00
Divine TowersKabra Estate And Investment ConsultantsCts No.5597Survey No.13130-12-2021 00:00:00
Lotus Niwas / Satya NiwasK L Ventures And Enterprises984 And 984/1 To 1031-03-2019 00:00:00
Sheetal Vaibhav KutirD.G.Land Developers Pvt LtdCts 42401-07-2023 00:00:00
ShreyaBharat Navinchandra Gala473/473/1 T0 531-12-2018 00:00:00
Bhoomi Celestia -A1 WingSashwat Construwell Private Limited554 554/1To10 555 555/1To3 556A 557 557/1To3 558To560 562 563 580Pt To582 589A 590 593A30-12-2022 00:00:00
Chetna Kunj ChsK Merchant Construction Ltd972B31-12-2019 00:00:00
Siddharth PalaceRajkumar Raghunath KushwahaCts No 360B31-12-2019 00:00:00
Gomes Apartment ChsMetro Associates9530-12-2021 00:00:00
Sun ShadeShubham Enterprise698 And 698/ 1 To 731-01-2020 00:00:00
Aristo ClassicAop Of Bindesh And Milind Somaiya400064, Mumbai Suburban09-02-2019 00:00:00
Vasai CentralMarianella Properties Pvt. Ltd.Mumbai Suburban, 40006431-01-2018 00:00:00
Sanghvi JewelSanghvi RealtorsCts 572A 572B 572A1 To 16 572A20 To 44 572A17a And B 572 A 18A And B 572A 19A And B31-12-2018 00:00:00
Horizon HomesHorizon Dream Homes Private LimitedNavy Colony31-03-2015 00:00:00
Shreeji Plaza Wing BSiddharth EnterprisesCts No 1 Pt And 2 Pt Of Village Valnai Taluka Borivali - W Orlem Malad - W Mumbai30-06-2025 00:00:00
Advent PalazzoAdvent Developers Private LimitedCts No. 630-06-2018 00:00:00
Laxmi VillaLaxmidevi Developers28101-06-2018 00:00:00
Aaditya PlazaJet Build Developers(Mumbai)751, 751/1 To 88 Of Villege Malad31-12-2018 00:00:00
Milan ResidencyM/S Milan Builders788/B/1/B31-12-2018 00:00:00
Asmita Sand DunesSun Developers1224A/1 And 1224A/230-06-2019 00:00:00
A.N. HeightsH Square Builders411A/1 To 10, 223/5, 411A, 223/3, 223/6, 220/1130-06-2021 00:00:00
Shreeji Plaza Wing ASiddharth EnterprisesCts No 1 Pt And 2 Pt Of Village Valnai Taluka Borivali Orlem Malad - West Mumbai30-06-2023 00:00:00
Subhshri ArcadeSubhshridevelopers163/1/24, 16328-02-2021 00:00:00
Das Bhavan ChslRishabraj Estate Developers Pvt Ltd777 1 To 4, 77731-12-2017 00:00:00
LinkparkAdarsh Industrial Estate Private LimitedResidentail Building No 2 Under Sra Scheme On Plot Bearing Cts No 335/1 Malad Mumbai19-10-2026 00:00:00
Aabiel AvenueRight Channel Construction Pvt Ltd341/A-1, 341A-2, 341/A31-12-2019 00:00:00
Sri Balaji EnclaveAni Anu Developers Private Limited1067 A2 To 1067 A431-12-2019 00:00:00
Sky TowerRajyog Realtors35230-12-2023 00:00:00
Royal AccordAnuradha Real Estate Developers Pvt Ltd1069A/2/C, Cts No. 1069A/2A/1, 1069A/2A/230-12-2023 00:00:00
Bhoomi Celestia - A WingSashwat Construwell Private Limited557, 554/1To 10, 559To560 562 563 580To 582 589A 590 593A, 555/1 To 3, 55530-12-2022 00:00:00
Lovedale ResidencesYashodhan Unique Construction Company4A31-03-2018 00:00:00
Laxmi HeightsDudhal InfraNew Cts Number 397A30-06-2018 00:00:00
Ahimsa HeightsAhimsa Builder1177Abcde, 1179Abc, 1221Cd, 1178A30-09-2018 00:00:00
Shree Sumitra ApartmentsShree Mahalakshmi Constructions1861-4, 18631-12-2018 00:00:00
Beacon ChslBhushan Anant Vichare290 / A30-06-2018 00:00:00
Laxmi EnclaveShree Laxmidevi Developers1823-06-2018 00:00:00
Om PalaceP. G. Enterprises344/1 To 16, 344, 34230-06-2019 00:00:00
NirmanJpv Realtors Private Limited76531-12-2017 00:00:00
Mamtora EmbassyMamtora Constructions106230-06-2028 00:00:00
Saptaratna TowersRaja Constructions Company33/1231-12-2017 00:00:00
Eaze Zone In Laxmi Singh ComplexKeystone Realtors Pvt. Ltd.1214/130-06-2021 00:00:00
Kapadia AvenueL J Enterprise697/1 To 13, 69731-03-2019 00:00:00
Malad Sati Darshan Chs Ltd.Goyal Sati Darshan Llp581, 58031-05-2026 00:00:00
Sheetal AnupamDgs Township Pvt Ltd684 1 To 9, 684/68415-05-2025 00:00:00
Hansini AstoriaShaishav Nitesh Satra8931-12-2024 00:00:00
Pushpak HeightsPushpak Realties Private LimitedMalad31-12-2019 00:00:00
Shree Santosh AppartmentBharat Navinchandra GalaC.S.T. No-96831-12-2018 00:00:00
Tilak Revelopment Project Of Tilak Apartment ChslKabra And AssociatesPlot No 4 Cts No 132 132 1 To 431-12-2017 00:00:00
Maitri Siya ApartmentMaitri And Pp RealtorsCts No 84 84 1 85 85 1 To 3 Village Malad South30-06-2019 00:00:00
Siddhi VinayakShree Ganesh EnterprisesCts No 371 Part 372 Part 373 Part30-12-2026 00:00:00
VishwavillaGlasswood And Lucky Developers670/1 To 8, Cts No 67031-07-2018 00:00:00
Upakram Chs Ltd.Rajvi Builders And Developers400064, Mumbai Suburban01-01-2017 00:00:00
Sharnam HeightsShyam Biharilal Gehani980/A Village Pahadi Goregaon, 979/1 To 8, 97931-12-2019 00:00:00
Jeevan JyotOm Shiv Constructions CoPlot No 173, 608A/1 To 6 And 608B, Cts No 608A30-12-2021 00:00:00
Parsh GalaxyParsh Housing Pvt Ltd133/133/1-431-12-2017 00:00:00
SolitaireSolitaire ConstructionsCts No 855 C31-03-2019 00:00:00
Unity HeightsUnited Developers6741-7675 6761 9871-1031-07-2018 00:00:00
Atharva ComplexAtharva RealtorsPodar Road31-12-2016 00:00:00
Gayatri BhuvanIndra Realtors209/1 To 5, 20831-12-2017 00:00:00
Om HeightsOm Shiv Construction CoMumbai Suburban, 40005813-10-2020 00:00:00
Victory DivineYashodanand Realtors960/830-09-2020 00:00:00
SummersetNeo Housing And Infrastructure Development Limited41531-12-2017 00:00:00
Sai Vishal Chs LtdK T GroupMumbai Suburban, 40006430-04-2018 00:00:00
Vora AashishVora Estate DevelopersMumbai Suburban, 40009731-12-2020 00:00:00
Hava Hira ChsPatel Developers400064, Mumbai Suburban01-08-2015 00:00:00
Adarsh Shakti Nagar Co-Op Hsg Soc PropK.Talsania ConstructionMumbai Suburban, 40006430-12-2023 00:00:00
Aviron ClassicSanjay Talakshi Savla811/1 To 4, 81131-12-2019 00:00:00
Dhoot Sky Residency-New Sonali ChslDhoot Developers Pvt. Ltd.Cts No 307/105 And 307/10730-06-2021 00:00:00
Siddhachal Malad MamletdarwadiBucon Engineers & Infrastructure Pvt. Ltd.80931-12-2017 00:00:00
Project Details
  • Project:
    Solitaire
  • Location:
  • Cts No 855 C
  • Const. Stage:
    Ongoing
  • Possession:
    31 Mar 2019
Developer Details

  • Developer:
    Solitaire Constructions
  • Phone:
  • Address:
  • Solitaire Star Bldg
Project RERA Details
MAHA REARA No: P51800008101
Project Type Others
RERA Project Status Ongoing
Architect Ms Daddy & Associates
Funding Bank HDFC BANK
Proposed Possession 31 Mar 2019
Revised Possession 31 Mar 2019
Extended Possession 15 May 2025
Litigations No Litigations
Last Modified 05 Sep 2022
Last Retrived 26 Jul 2025
Solitaire QR Code
Solitaire
MahaRERA - P51800008101
Apartment Details & Configuration
TypeArea
1 BHK26.66 Sq.mts. ( 287 Sq.ft. )
1 BHK34.53 Sq.mts. ( 372 Sq.ft. )
Office space148.05 Sq.mts. ( 1594 Sq.ft. )
Office space31.55 Sq.mts. ( 340 Sq.ft. )
Shop31.68 Sq.mts. ( 341 Sq.ft. )
Shop27.5 Sq.mts. ( 296 Sq.ft. )
Shop17.76 Sq.mts. ( 191 Sq.ft. )
Shop19.94 Sq.mts. ( 215 Sq.ft. )
Shop23.66 Sq.mts. ( 255 Sq.ft. )
Shop24.23 Sq.mts. ( 261 Sq.ft. )
Shop24.38 Sq.mts. ( 262 Sq.ft. )
Shop25.54 Sq.mts. ( 275 Sq.ft. )
1 BHK40.64 Sq.mts. ( 437 Sq.ft. )
1 BHK41.67 Sq.mts. ( 449 Sq.ft. )
2 BHK63.23 Sq.mts. ( 681 Sq.ft. )
2 BHK63.7 Sq.mts. ( 686 Sq.ft. )
2 BHK66.28 Sq.mts. ( 713 Sq.ft. )
Shop42.74 Sq.mts. ( 460 Sq.ft. )
Shop45.68 Sq.mts. ( 492 Sq.ft. )
Shop59.13 Sq.mts. ( 636 Sq.ft. )
Shop26.58 Sq.mts. ( 286 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Solitairelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space20% completed
20% Complete
Na
Community Buildings
Na
COVERD PARKING100% completed
95% Complete
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply40% completed
40% Complete
Na
Buildings / Wings in Solitaire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Solitaire by Solitaire Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

37309 Sq. ft.

Project Area

1091 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

150 apartments in total
Total
150
Booked
82
Available
68

Saleable Area Statistics (Sq. ft.)

75581 Total
Total
75581
Booked
39246
Available
36335
Total 150 apartments in project. 82 apartments booked. 54% apartments booked.
Total 75581 Sq.ft. saleable area. 39246 saleable area booked.
52% area booked.

Om Datta Krupa Welfare Sra Sahakari Gruhanirman S

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Om Datta Krupa Welfare Sra Sahakari Gruhanirman SMar 201920101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.66 Sq.mts. ( 287 Sq.ft. )31
13 Booked41% Booked
41% Booked
1 BHK34.53 Sq.mts. ( 372 Sq.ft. )7
5 Booked71% Booked
71% Booked
Office space148.05 Sq.mts. ( 1594 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space31.55 Sq.mts. ( 340 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop31.68 Sq.mts. ( 341 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop27.5 Sq.mts. ( 296 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.76 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.94 Sq.mts. ( 215 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.66 Sq.mts. ( 255 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.23 Sq.mts. ( 261 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.38 Sq.mts. ( 262 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.54 Sq.mts. ( 275 Sq.ft. )1
1 Booked100% Booked
100% Booked
48 total apartments / 25 apartments booked. 52% apartments booked.
Work Description in Building Om Datta Krupa Welfare Sra Sahakari Gruhanirman SCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress59% done
59% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress53% done
53% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress86% done
86% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Solitaire Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Solitaire HeightsMar 2019221112042
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.64 Sq.mts. ( 437 Sq.ft. )20
15 Booked75% Booked
75% Booked
1 BHK41.67 Sq.mts. ( 449 Sq.ft. )19
16 Booked84% Booked
84% Booked
2 BHK63.23 Sq.mts. ( 681 Sq.ft. )20
4 Booked20% Booked
20% Booked
2 BHK63.7 Sq.mts. ( 686 Sq.ft. )19
12 Booked63% Booked
63% Booked
2 BHK66.28 Sq.mts. ( 713 Sq.ft. )20
10 Booked50% Booked
50% Booked
Shop42.74 Sq.mts. ( 460 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.68 Sq.mts. ( 492 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop59.13 Sq.mts. ( 636 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop26.58 Sq.mts. ( 286 Sq.ft. )1
None Booked0% Booked
0% Booked
102 total apartments / 57 apartments booked. 55% apartments booked.
Work Description in Building Solitaire HeightsCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress41% done
41% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress88% done
88% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress58% done
58% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress85% done
85% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Solitaire Constructions
for Project
Solitaire
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation