Project overview

Sneh Serene is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700030955. Sneh Serene is located at Survey No 35/9. This is a New being developed by Sneh Buildcon.

Sneh Serene has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 124 to 84 Sq.ft. Carpet. The Project has total 131 of which 123 are currently available for sale.

Sneh Serene is being developed on a total land area of 23035 Sq.ft. Sneh Serene has 1 Wings / Towers Sneh Serene

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sneh Serene
  • Location:
  • Survey No 35/9
  • Const. Stage:
    New
  • Possession:
    30 Jun 2025
Developer Details

  • Developer:
    Sneh Buildcon
  • Phone:
  • Address:
  • Parasnath Darshan
Project RERA Details
MAHA REARA No: P51700030955
Project Type Residential / Group Housing
RERA Project Status New
Architect Sthapatyanirmaan
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 01 Jul 2025
Last Retrived 26 Jul 2025
Sneh Serene QR Code
Sneh Serene
MahaRERA - P51700030955
Apartment Details & Configuration
TypeArea
1 BHK27.02 Sq.mts. ( 291 Sq.ft. )
1 BHK28.46 Sq.mts. ( 306 Sq.ft. )
1 BHK29.09 Sq.mts. ( 313 Sq.ft. )
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )
2 BHK38.7 Sq.mts. ( 417 Sq.ft. )
2 BHK39.69 Sq.mts. ( 427 Sq.ft. )
Shop7.78 Sq.mts. ( 84 Sq.ft. )
Shop11.56 Sq.mts. ( 124 Sq.ft. )
Shop14.74 Sq.mts. ( 159 Sq.ft. )
Shop15.08 Sq.mts. ( 162 Sq.ft. )
Shop16.44 Sq.mts. ( 177 Sq.ft. )
Shop18.01 Sq.mts. ( 194 Sq.ft. )
Shop20.73 Sq.mts. ( 223 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sneh Serenelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
1 Electric Meter Space For Each Will Be Install
Energy management
Na
Fire Protection And Fire Safety Requirements
Developers
Landscaping & Tree Planting
As Per Kdmc Requirement
Open Parking
Developers
Sewerage (Chamber, Lines, Septic Tank , STP)
Sepctic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Developer
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
To Be Provided By Kdmc
Buildings / Wings in Sneh Serene
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sneh Serene by Sneh Buildconlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

23035 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

131 apartments in total
Total
131
Booked
8
Available
123

Saleable Area Statistics (Sq. ft.)

43503 Total
Total
43503
Booked
2206
Available
41298
Total 131 apartments in project. 8 apartments booked. 6% apartments booked.
Total 43503 Sq.ft. saleable area. 2206 saleable area booked.
5% area booked.

Sneh Serene

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sneh SereneJun 2025221000220
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.02 Sq.mts. ( 291 Sq.ft. )18
1 BHK28.46 Sq.mts. ( 306 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK29.09 Sq.mts. ( 313 Sq.ft. )19
1 BHK29.3 Sq.mts. ( 315 Sq.ft. )34
2 BHK38.7 Sq.mts. ( 417 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK39.69 Sq.mts. ( 427 Sq.ft. )33
Shop7.78 Sq.mts. ( 84 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop11.56 Sq.mts. ( 124 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.74 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.08 Sq.mts. ( 162 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.44 Sq.mts. ( 177 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.01 Sq.mts. ( 194 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop20.73 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
131 total apartments / 8 apartments booked. 6% apartments booked.
Work Description in Building Sneh SereneCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress38% done
38% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked
Channel Partners
Channel Partners Registered by Developer
Sneh Buildcon
for Project
Sneh Serene
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation