Project overview

Smit Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000021689. Smit Heights is located at Palghar. This is a New Project being developed by Smit Infra.

Smit Heights has 1 BHK & 2 BHK Apartments with carpet areas ranging from 304 to 505 Sq.ft. Carpet. The Project has total 85 of which 85 are currently available for sale.

Smit Heights is being developed on a total land area of 11977 Sq.ft. out of which 10186 Sq.ft. i.e 85% is reserved for recreational purposes. Smit Heights has 1 Wings / Towers Smit Heights

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Smit Heights
  • Location:
  • Palghar
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Smit Infra
  • Phone:
  • Address:
  • 29/001, Harsh Vihar Chs Ltd, Shanti Nagar, Near Railway Station, Sector-1, 401107
Project RERA Details
MAHA REARA No: P99000021689
Project Type Residential
RERA Project Status New Project
Architect Shape Consultants
Funding Bank AXIS BANK LTD
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Nov 2023
Last Retrived 28 Jul 2025
Smit Heights QR Code
Smit Heights
MahaRERA - P99000021689
Apartment Details & Configuration
TypeArea
1 BHK28.22 Sq.mts. ( 304 Sq.ft. )
1 BHK29.47 Sq.mts. ( 317 Sq.ft. )
1 BHK30.82 Sq.mts. ( 332 Sq.ft. )
1 BHK31.19 Sq.mts. ( 336 Sq.ft. )
2 BHK46.89 Sq.mts. ( 505 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Smit Heightslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electric Work As Per Msedcl
Energy management
Na
Fire Protection And Fire Safety Requirements
Provisional Fir Noc Obtained As Per Vvcmc
Landscaping & Tree Planting
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank Completed
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Will Be Provided In Internal Roads
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Bore Well Water
Buildings / Wings in Smit Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Smit Heights by Smit Infralast updated on 28 Jul 2025 as per information obtained from MARA RERA.

11977 Sq. ft.

Project Area

10186 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

85 apartments in total
Total
85
Booked
0
Available
85

Saleable Area Statistics (Sq. ft.)

30484 Total
Total
30484
Booked
0
Available
30484
Total 85 apartments in project. 0 apartments booked. 0% apartments booked.
Total 30484 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Smit Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Smit HeightsDec 2023181010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.22 Sq.mts. ( 304 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK29.47 Sq.mts. ( 317 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK30.82 Sq.mts. ( 332 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK31.19 Sq.mts. ( 336 Sq.ft. )17
None Booked0% Booked
0% Booked
2 BHK46.89 Sq.mts. ( 505 Sq.ft. )17
None Booked0% Booked
0% Booked
85 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Smit HeightsCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Smit Infra
for Project
Smit Heights
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation