Project overview

Simran Deluxe is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005150. Simran Deluxe is located at Cts No 23507. This is a Ongoing being developed by Sai Buildcon.

Simran Deluxe has 2 BHK Apartments with carpet areas ranging from 981 to 981 Sq.ft. Carpet. The Project has total 14 of which 12 are currently available for sale.

Simran Deluxe is being developed on a total land area of 4203 Sq.ft. Simran Deluxe has 1 Wings / Towers Simran Deluxe

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Simran Deluxe
  • Location:
  • Cts No 23507
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Sai Buildcon
  • Phone:
  • Address:
  • Sai Arcade
Project RERA Details
MAHA REARA No: P51700005150
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Hotwani & Associates
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Aug 2017
Last Retrived 26 Jul 2025
Simran Deluxe QR Code
Simran Deluxe
MahaRERA - P51700005150
Apartment Details & Configuration
TypeArea
2 BHK91.13 Sq.mts. ( 981 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Simran Deluxelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Meter Room
Energy management
Led Light
Fire Protection And Fire Safety Requirements
Not Started
Landscaping & Tree Planting
Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Started
Street Lighting
Not Started
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Not Started
Buildings / Wings in Simran Deluxe
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Simran Deluxe by Sai Buildconlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4203 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
2
Available
12

Saleable Area Statistics (Sq. ft.)

13733 Total
Total
13733
Booked
1962
Available
11771
Total 14 apartments in project. 2 apartments booked. 14% apartments booked.
Total 13733 Sq.ft. saleable area. 1962 saleable area booked.
14% area booked.

Simran Deluxe

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Simran DeluxeJan 190081010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK91.13 Sq.mts. ( 981 Sq.ft. )14
14 total apartments / 2 apartments booked. 14% apartments booked.
Work Description in Building Simran DeluxeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress45% done
45% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked
Channel Partners
Channel Partners Registered by Developer
Sai Buildcon
for Project
Simran Deluxe
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation