Project overview

Silver Scape/Silver Enclave is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009210. Silver Scape/Silver Enclave is located at 889. This is a Ongoing being developed by Malde Properties Llp.

Silver Scape/Silver Enclave has 2 BHK & 3 BHK Apartments with carpet areas ranging from 718 to 982 Sq.ft. Carpet. The Project has total 62 of which 0 are currently available for sale.

Silver Scape/Silver Enclave is being developed on a total land area of 43041 Sq.ft. out of which 2517 Sq.ft. i.e 6% is reserved for recreational purposes. Silver Scape/Silver Enclave has 2 Wings / Towers Silver Enclave,Silver Scape

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Silver Scape/Silver Enclave
  • Location:
  • 889
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Malde Properties Llp
  • Phone:
  • Address:
  • Kadampada Chs Lts
Project RERA Details
MAHA REARA No: P51800009210
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Last Modified 15 Feb 2024
Last Retrived 26 Jul 2025
Silver Scape/Silver Enclave QR Code
Silver Scape/Silver Enclave
MahaRERA - P51800009210
Apartment Details & Configuration
TypeArea
NA0 Sq.mts. ( 0 Sq.ft. )
2 BHK66.7 Sq.mts. ( 718 Sq.ft. )
2 BHK68.28 Sq.mts. ( 735 Sq.ft. )
2 BHK69.96 Sq.mts. ( 753 Sq.ft. )
2 BHK70.79 Sq.mts. ( 762 Sq.ft. )
3 BHK89.37 Sq.mts. ( 962 Sq.ft. )
3 BHK91.23 Sq.mts. ( 982 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Silver Scape/Silver Enclavelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Completed
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Silver Scape/Silver Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Silver Scape/Silver Enclave by Malde Properties Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

43041 Sq. ft.

Project Area

2517 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

62 apartments in total
Total
62
Booked
62
Available
0

Saleable Area Statistics (Sq. ft.)

50114 Total
Total
50114
Booked
50114
Available
0
Total 62 apartments in project. 62 apartments booked. 100% apartments booked.
Total 50114 Sq.ft. saleable area. 50114 saleable area booked.
100% area booked.

Silver Enclave

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Silver EnclaveJun 20230000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
NA0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Silver EnclaveCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Silver Scape

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Silver ScapeDec 202321100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.7 Sq.mts. ( 718 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK68.28 Sq.mts. ( 735 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK69.96 Sq.mts. ( 753 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK70.79 Sq.mts. ( 762 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK89.37 Sq.mts. ( 962 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK91.23 Sq.mts. ( 982 Sq.ft. )14
14 Booked100% Booked
100% Booked
62 total apartments / 62 apartments booked. 100% apartments booked.
Work Description in Building Silver ScapeCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Malde Properties Llp
for Project
Silver Scape/Silver Enclave
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation