Project overview

Signature Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000006550. Signature Residency is located at 45. This is a Ongoing being developed by Munir Abdullatif Gazi.

Signature Residency has 1 BHK & 2 BHK Apartments with carpet areas ranging from 307 to 551 Sq.ft. Carpet. The Project has total 376 of which 178 are currently available for sale.

Signature Residency is being developed on a total land area of 146072 Sq.ft. out of which 18940 Sq.ft. i.e 13% is reserved for recreational purposes. Signature Residency has 20 Wings / Towers Building No 1,Building No 10,Building No 11,Building No 12,Building No 13,Building No 14,Building No 15,Building No 2,Building No 3,Building No 34,Building No 35,Building No 36,Building No 37,Building No 38,Building No 4,Building No 5,Building No 6,Building No 7,Building No 8,Building No 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Signature Residency
  • Location:
  • 45
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2028
Developer Details

  • Developer:
    Munir Abdullatif Gazi
  • Phone:
  • Address:
  • Mehta House
Project RERA Details
MAHA REARA No: P99000006550
Project Type Others
RERA Project Status Ongoing
Architect Ketan Gopal Sawant
Funding Bank BANK OF INDIA
Proposed Possession 30 Dec 2028
Revised Possession 30 Dec 2028
Extended Possession
Litigations No Litigations
Last Modified 04 Nov 2022
Last Retrived 28 Jul 2025
Signature Residency QR Code
Signature Residency
MahaRERA - P99000006550
Apartment Details & Configuration
TypeArea
1 BHK27.58 Sq.mts. ( 297 Sq.ft. )
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )
2 BHK39.54 Sq.mts. ( 426 Sq.ft. )
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )
2 BHK51.33 Sq.mts. ( 553 Sq.ft. )
Shop14.45 Sq.mts. ( 156 Sq.ft. )
Shop14.72 Sq.mts. ( 158 Sq.ft. )
Shop17.31 Sq.mts. ( 186 Sq.ft. )
Shop19.06 Sq.mts. ( 205 Sq.ft. )
Shop20.08 Sq.mts. ( 216 Sq.ft. )
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )
1 BHK32.73 Sq.mts. ( 352 Sq.ft. )
1 BHK32.94 Sq.mts. ( 355 Sq.ft. )
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )
1 BHK36.76 Sq.mts. ( 396 Sq.ft. )
2 BHK44.23 Sq.mts. ( 476 Sq.ft. )
2 BHK51.19 Sq.mts. ( 551 Sq.ft. )
1 BHK31.49 Sq.mts. ( 339 Sq.ft. )
1 BHK32.84 Sq.mts. ( 353 Sq.ft. )
1 BHK33.48 Sq.mts. ( 360 Sq.ft. )
1 BHK35.32 Sq.mts. ( 380 Sq.ft. )
1 BHK36.75 Sq.mts. ( 396 Sq.ft. )
1 BHK39.53 Sq.mts. ( 426 Sq.ft. )
Shop13.29 Sq.mts. ( 143 Sq.ft. )
Shop15.9 Sq.mts. ( 171 Sq.ft. )
Shop18.3 Sq.mts. ( 197 Sq.ft. )
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )
Shop9.85 Sq.mts. ( 106 Sq.ft. )
Shop12.17 Sq.mts. ( 131 Sq.ft. )
Shop15.74 Sq.mts. ( 169 Sq.ft. )
Shop20.06 Sq.mts. ( 216 Sq.ft. )
Shop20.64 Sq.mts. ( 222 Sq.ft. )
00 Sq.mts. ( 0 Sq.ft. )
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )
Shop13.86 Sq.mts. ( 149 Sq.ft. )
Shop15.59 Sq.mts. ( 168 Sq.ft. )
Shop17.03 Sq.mts. ( 183 Sq.ft. )
Shop18.29 Sq.mts. ( 197 Sq.ft. )
1 BHK32.74 Sq.mts. ( 352 Sq.ft. )
1 BHK33.47 Sq.mts. ( 360 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Signature Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply
Work In Progress
Water Conservation, Rain water Harvesting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Street Lighting
Work In Progress
Storm Water Drains
Work In Progress
Solid Waste Management And Disposal
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Open Parking
Na
Landscaping & Tree Planting
Na
Internal Roads & Footpaths
Work In Progress
Fire Protection And Fire Safety Requirements
Na
Energy management
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Community Buildings
Na
Aggregate area of recreational Open Space
Na
Buildings / Wings in Signature Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Signature Residency by Munir Abdullatif Gazilast updated on 28 Jul 2025 as per information obtained from MARA RERA.

146072 Sq. ft.

Project Area

18940 Sq. ft.

Recreational Open Space

Total 20

Wings / Towers in Project

Apartments Statistics

376 apartments in total
Total
376
Booked
198
Available
178

Saleable Area Statistics (Sq. ft.)

136653 Total
Total
136653
Booked
70957
Available
65696
Total 376 apartments in project. 198 apartments booked. 52% apartments booked.
Total 136653 Sq.ft. saleable area. 70957 saleable area booked.
52% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.58 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )8
3 Booked37% Booked
37% Booked
2 BHK39.54 Sq.mts. ( 426 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK51.33 Sq.mts. ( 553 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop14.45 Sq.mts. ( 156 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.72 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.31 Sq.mts. ( 186 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.06 Sq.mts. ( 205 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop20.08 Sq.mts. ( 216 Sq.ft. )1
None Booked0% Booked
0% Booked
30 total apartments / 13 apartments booked. 43% apartments booked.
Work Description in Building Building No 1Completion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 10Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )10
6 Booked60% Booked
60% Booked
1 BHK32.73 Sq.mts. ( 352 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK32.94 Sq.mts. ( 355 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK36.76 Sq.mts. ( 396 Sq.ft. )8
7 Booked87% Booked
87% Booked
25 total apartments / 16 apartments booked. 64% apartments booked.
Work Description in Building Building No 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 11Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )10
2 BHK44.23 Sq.mts. ( 476 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK51.19 Sq.mts. ( 551 Sq.ft. )5
None Booked0% Booked
0% Booked
30 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building Building No 11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 12Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.49 Sq.mts. ( 339 Sq.ft. )10
7 Booked70% Booked
70% Booked
1 BHK32.84 Sq.mts. ( 353 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK32.94 Sq.mts. ( 355 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.48 Sq.mts. ( 360 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.32 Sq.mts. ( 380 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK36.75 Sq.mts. ( 396 Sq.ft. )9
6 Booked66% Booked
66% Booked
25 total apartments / 19 apartments booked. 76% apartments booked.
Work Description in Building Building No 12Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 13Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )6
3 Booked50% Booked
50% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )9
7 Booked77% Booked
77% Booked
1 BHK39.53 Sq.mts. ( 426 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.23 Sq.mts. ( 476 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK51.19 Sq.mts. ( 551 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop13.29 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.9 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.31 Sq.mts. ( 186 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.3 Sq.mts. ( 197 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.06 Sq.mts. ( 205 Sq.ft. )2
None Booked0% Booked
0% Booked
30 total apartments / 17 apartments booked. 56% apartments booked.
Work Description in Building Building No 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress60% done
60% Booked

Building No 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 14Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )8
4 Booked50% Booked
50% Booked
1 BHK33.46 Sq.mts. ( 360 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK36.76 Sq.mts. ( 396 Sq.ft. )8
7 Booked87% Booked
87% Booked
Shop9.85 Sq.mts. ( 106 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop12.17 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.74 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop20.06 Sq.mts. ( 216 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop20.64 Sq.mts. ( 222 Sq.ft. )2
None Booked0% Booked
0% Booked
29 total apartments / 16 apartments booked. 55% apartments booked.
Work Description in Building Building No 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress31% done
31% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Building No 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 15Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 15Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )10
5 Booked50% Booked
50% Booked
1 BHK32.75 Sq.mts. ( 353 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.48 Sq.mts. ( 360 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK36.76 Sq.mts. ( 396 Sq.ft. )9
8 Booked88% Booked
88% Booked
25 total apartments / 15 apartments booked. 60% apartments booked.
Work Description in Building Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress67% done
67% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress67% done
67% Booked

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.58 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )10
9 Booked90% Booked
90% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )9
8 Booked88% Booked
88% Booked
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK51.19 Sq.mts. ( 551 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.33 Sq.mts. ( 553 Sq.ft. )4
4 Booked100% Booked
100% Booked
30 total apartments / 28 apartments booked. 93% apartments booked.
Work Description in Building Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress38% done
38% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 34

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 34Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 34Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 35

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 35Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 35Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 36

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 36Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 36Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 37

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 37Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 37Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 38

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 38Jan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 38Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )10
4 Booked40% Booked
40% Booked
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )5
1 Booked20% Booked
20% Booked
2 BHK51.19 Sq.mts. ( 551 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.33 Sq.mts. ( 553 Sq.ft. )4
3 Booked75% Booked
75% Booked
20 total apartments / 9 apartments booked. 45% apartments booked.
Work Description in Building Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )10
6 Booked60% Booked
60% Booked
1 BHK32.94 Sq.mts. ( 355 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.48 Sq.mts. ( 360 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK36.76 Sq.mts. ( 396 Sq.ft. )9
9 Booked100% Booked
100% Booked
25 total apartments / 21 apartments booked. 84% apartments booked.
Work Description in Building Building No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Building No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 6Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )8
2 BHK39.54 Sq.mts. ( 426 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK51.33 Sq.mts. ( 553 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop13.86 Sq.mts. ( 149 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.59 Sq.mts. ( 168 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.03 Sq.mts. ( 183 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.06 Sq.mts. ( 205 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop20.08 Sq.mts. ( 216 Sq.ft. )1
1 Booked100% Booked
100% Booked
29 total apartments / 8 apartments booked. 27% apartments booked.
Work Description in Building Building No 6Completion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 7Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK39.54 Sq.mts. ( 426 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK51.33 Sq.mts. ( 553 Sq.ft. )4
2 Booked50% Booked
50% Booked
Shop13.29 Sq.mts. ( 143 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.9 Sq.mts. ( 171 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.31 Sq.mts. ( 186 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.29 Sq.mts. ( 197 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.06 Sq.mts. ( 205 Sq.ft. )2
2 Booked100% Booked
100% Booked
23 total apartments / 15 apartments booked. 65% apartments booked.
Work Description in Building Building No 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress45% done
45% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 8Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.5 Sq.mts. ( 339 Sq.ft. )10
8 Booked80% Booked
80% Booked
1 BHK32.74 Sq.mts. ( 352 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.47 Sq.mts. ( 360 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK35.33 Sq.mts. ( 380 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK36.75 Sq.mts. ( 396 Sq.ft. )9
6 Booked66% Booked
66% Booked
25 total apartments / 18 apartments booked. 72% apartments booked.
Work Description in Building Building No 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building No 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 9Dec 20284100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.53 Sq.mts. ( 307 Sq.ft. )10
1 BHK29.98 Sq.mts. ( 323 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK44.22 Sq.mts. ( 476 Sq.ft. )5
1 Booked20% Booked
20% Booked
2 BHK51.19 Sq.mts. ( 551 Sq.ft. )5
None Booked0% Booked
0% Booked
30 total apartments / 2 apartments booked. 6% apartments booked.
Work Description in Building Building No 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Munir Abdullatif Gazi
for Project
Signature Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation