Project overview

Sidhivinayak Flora is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800033003. Sidhivinayak Flora is located at Lqr9fgjewehvbo40epqphwwnc73f9m5wsljalydv/Ue=. This is a New being developed by Sidhivinayak Constructions.

Sidhivinayak Flora has 1 BHK, 1 BHK owner, 1RK, 2 BHK, 2 BHK Owner & 3 BHK Apartments with carpet areas ranging from 303 to 850 Sq.ft. Carpet. The Project has total 53 of which 14 are currently available for sale.

Sidhivinayak Flora is being developed on a total land area of 13045 Sq.ft. out of which 1959 Sq.ft. i.e 15% is reserved for recreational purposes. Sidhivinayak Flora has 2 Wings / Towers Flora Wing A,Flora Wing B

ProjectDeveloperLocationPossession
Natekar HeightsSabari Developers LlpPc/3V7jftameupeallypkeyl6hgx40x7wo++8Hqucbu=31-05-2019 00:00:00
Arham AumMahavir Enterprises5N7tt36kmt/P+Fxf9grnwg==31-12-2017 00:00:00
The Golf Boulevard Building - 1Empress & Adishakti JvRsq90vchzchpc4mjx0q9wq==30-06-2022 00:00:00
Trishabh Greens - Wing ARishabh EnterprisesFhzrtgrxrbma/2Rd/Uyjttczlzjtao4rkay18cxvgd6hcrzr26zxfcerzgavdgto30-12-2025 00:00:00
Trishabh Greens - Wing BRishabh EnterprisesFhzrtgrxrbma/2Rd/Uyjttczlzjtao4rkay18cxvgd6hcrzr26zxfcerzgavdgto30-12-2025 00:00:00
Chaurang ShraddhaM/S. Chaurang DevelopersGp7cgmaovlrkyskyc7sqqw==31-12-2017 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedQa5y3u+5Nypbelry56eeba==31-07-2025 00:00:00
Sabari AshvilleSabari Jani AssociatesPlbtjq/Dxz5y3hsouzoy6x7edozsuehnhq8sgdxmmqe=31-12-2017 00:00:00
Shivpuri Building No.10 Chs Ltd - Shivam HeightsSidhivinayak Constructions3Z3dnc7lnnogdyp98aicqotwwqlqsh+0Sej1w8608+Dkrfhw7pycoycq7xpe42bs31-12-2018 00:00:00
Hubtown Seasons - B WingJoynest Premises PrivatelimitedTetwwqzaw20pldof5hsdjg==31-07-2025 00:00:00
LegranzEkta Shubham VentureIip02h4c4qdflswhxxymuwky9mx7mg1ydsqicdzkwn4=31-12-2018 00:00:00
OrionNivaan Infratech Private Limited3Mix5lo1q3yqcacptqa2kidwbzfbeozlbpheboesotu=31-12-2017 00:00:00
GeetanjaliKukreja Construction CoP31rfnogjfcq4esmkquobzin+Ldwddgpsqd6dhyk7qbzygrar7v9nddqponfznts/9U6mr4z3iwdxodu9buu4jizrdod7uwfwnezmseb09jvvcpiqbeqwiedgvbaa1yz31-12-2017 00:00:00
Sapphire TowerMukesh Ramesh Bajaj And Manjit Singh Jodh Singh AbrolNul9j5to9btk1vfw4mjms0t2ew5l+Az3gex8repm9x4=04-07-2024 00:00:00
Sidhivinayak FloraSidhivinayak ConstructionsLqr9fgjewehvbo40epqphwwnc73f9m5wsljalydv/Ue=19-08-2024 00:00:00
Abhilash Phase IiSanjona BuildersHssy0xv7wxx3sxitfqlpm9ijkgxmfkd/1Mihxcggqqj49/Zdmffuitqbtazryvr731-12-2024 00:00:00
Sahakar Nagar Grace Co-Op. Hsg. Soc. LtdApoorva Homes0Xbm3vnls0kqunva9hktsg==31-12-2019 00:00:00
Raj Ekjyot SukrutiSadguna RealtyIawkxqy0y+G5dhqojdti9a==31-12-2018 00:00:00
Pure GoldSudhir Vasu Shetty7Cds6wggqshsow9ngwg0da==31-03-2018 00:00:00
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Zlqtqpaehjegd0mw3cvfdkwxgdvrs+Zr2/Nnzqpzlie=30-05-2023 00:00:00
Aayush AuraAayush & Arrtha Realtors LlpRr1ghp0rabbsu2xddrfw3q==31-12-2018 00:00:00
Siddhi GarimaNha Infraprojects Private LimitedTi6pxkp7siqyuvvgrc3qldd2rhtyr0oolt1odwcbp54=31-12-2018 00:00:00
ApurvaSidhivinayak ConstructionsAfi/2Vowiqc2zqrb61d4e6f9jyy9s5qle2r0b9v1sro=31-12-2018 00:00:00
Krishvi ResidencyShagun Chembur (Aop)Auip8sa3ojpcpqf83vsywg==31-12-2019 00:00:00
Little Malabar HillPardis Construction LlpMk7cogdqakqthgxpnlhbz6vayfmj5t35uhw1vn9hm1dwcj1xb4g1pas2riudu/Zg30-09-2020 00:00:00
CviiPardis Construction LlpVrbcuxygj4swsqunqqjm9bow2oeimtgkig6qybwssnf07jxm4drnhclq0pr6sfud31-03-2018 00:00:00
Ekjyot SanmaanDheeraj P Vohra6Lhrwpk8j6evuiegvxlskg==30-12-2023 00:00:00
Tulsi ChambersSurana Construction (Chembur )Ojgop6nt2s4ca4fq0ljqza==30-06-2021 00:00:00
Heritage PrideHeritage RealtorsLkxrjpwoneeb6wvhhingqbst6q0/Ekoapthn1amcrkvk8ysijcnsiw+Rru0pg7lv30-09-2018 00:00:00
Chembur Nandadeep Chs LtdOm Sai Developers400071, Mumbai Suburban, Kurla31-08-2022 00:00:00
Vandana ArtemisThree Towers Lifespace Llp0Xbm3vnls0kqunva9hktsg==30-12-2021 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.Vjwztmsq+Dyuhkdsmrtpbxmtcvfvlguod09uwzuimgjg3jeloa6p3pj0lcxpp7l9kr/Yuqkfpcfwgq+J+S8phs4eakew49wvsvpgkbyd62jgbikvo3dw0qlssmf6xh0o31-01-2021 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land ConsultancyUu516uyizwtwu7f590gn5g==31-12-2018 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.1Csmkvu20xokexjjha3xja==31-12-2019 00:00:00
Altavista - Phase 2Spenta Enclave Private LimitedMzyllwl3s6iqp9l1aqvhxq==30-06-2021 00:00:00
Altavista - Phase 1Spenta Enclave Private LimitedMzyllwl3s6iqp9l1aqvhxq==31-12-2019 00:00:00
EdificeBuildproPo6qgihehk7mpxmgwog+Bcinmddypwuhkdp5odpvwuk=31-12-2017 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Ariso ApartmentKyraa Housing Projects2Kv9bhmzn6qao0mchai+Dfjxjjkl3jh6azlkoske11/9Xxkm4padrs5dgatrk+Xv30-12-2024 00:00:00
PanoramaEkta Shubham VentureWfhhirekjlxknxo4onmoeq==31-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.A3vj8ihzunalfed9holwdlkhrrksjy+Wbczaz5rz2uq=31-03-2019 00:00:00
Harvest MoonCalvin PropertiesWlt9cgarbyra7a4sq2qwje+3Qgwp4q0lgb1le05ijpr6uiyyjx1w9ijy9dx3/C7x31-12-2019 00:00:00
Sabari Palm ViewSabari Developers LlpG1npbtzv74hueq16pqipstensepjhexr4rhxrkla5um=31-03-2019 00:00:00
Trishabh SignetDimension Housing Realty LlpJoek75keboy+B/U6tpz+Jg==31-12-2019 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction Company2G9il53ls2xb1yntnubs+Q==31-12-2018 00:00:00
117 ResidencyV3 PartnersEzzwq/Gndr3j0srgm6canbbvyegjqbk4xdtnt7wajj8mpbnk9jzx06vesab1bs3831-12-2019 00:00:00
Highway View Phase 1Unity Land ConsultancyWkrrbej3is8kyduolwmdgg==30-12-2020 00:00:00
United ElicasIi Walls Infra Llp60Wawfcqkeoatzfi2exehrb6qhssphnuhmfbljfuv5hohle6u8nlzniho6yen60q1knv6kv43k6qbycoioqy75ric6xepxoaksmohntwat8=30-12-2024 00:00:00
Vishnu ApolloThree Towers Lifespace Llp0Xbm3vnls0kqunva9hktsg==30-12-2021 00:00:00
Shrikant Chembers IiShrikant Studios Pvt. Ltd.400071, Mumbai Suburban31-03-2022 00:00:00
Maa KamalVirat BuildersLmcfffmpxuidhdt7rhm3iq==31-07-2019 00:00:00
Safal TrademarkJai Mata Di Home Construction Pvt LtdOg8raa9f52rifxxiqeftqdlcnim4be3hnomr9z91g7a=30-12-2023 00:00:00
Sabari ShobhaSabari Developers LlpH0cectqw7zj+1Z37zugrqwdsp9szj0ucg5dyrq+Xetlt8ocheg6zmpe/Blhxiorf30-11-2020 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private Limited0Tiqwlacztorg6g+Gc6tng==30-12-2024 00:00:00
Kings ParadiseNilesh Laxmikant KudalkarJjhculwvmw0e/Ny6kboplg==30-12-2026 00:00:00
Altavista - Phase 3Spenta Enclave Private LimitedMzyllwl3s6iqp9l1aqvhxq==30-06-2025 00:00:00
Altavista - Phase 4Spenta Enclave Private LimitedU8h5otjrv17rzu/Y9owx3a==30-12-2024 00:00:00
Meraki ArenaMeraki Habitats LlpXmb7y7npasoee6pfyfo9lqrxj6z9qvhesira53gjro2kfkt9nxxvu4yr9jhjohngnc7di6wzx3j3qtxhpkllba==30-11-2020 00:00:00
Castle PeakInnerspaceLocw4ect1zrbkqke8wixuxdt0cm0avxpak7lp6si1es=31-03-2018 00:00:00
Hari Kunj IiiKukreja Construction CoHv37ukfmmyzeu6vnxdklelm8so50uwjrxdzgdkbqqne=30-09-2020 00:00:00
Thapar Le ParcSamarpeet Properties Pvt LtdPzyqglpvtwyay2pyrx33fcpfosobvhlscq2lg1jvakg=30-06-2026 00:00:00
Vishwa BhuvanMajestic Royale City DevelopersIrmbm9gmkwahzl25tkqmfrl+Gjxg3paasmoncvi67kq=31-03-2026 00:00:00
Runwal WoodsEvie Holdings Private Limited And Adishakti Bhoomi Vikas (India) Private LimitedBdw2ubjtlbatu5ea36q0wfdnauql5yxrxujwe8n4xw4=30-09-2028 00:00:00
Ornata - AmberSpenta Enclave Private LimitedMzyllwl3s6iqp9l1aqvhxq==31-12-2024 00:00:00
Suprabha-Shivam LifestyleShivam Lifestyle3Abxgg15k5qgcektn6sxhg==31-12-2023 00:00:00
Swastik EleganceSwastik RealtorsS7f++Qsvgwppmjrwuf5qyq==31-12-2023 00:00:00
GurukripaInspira Realty And Infra Private Limited0Aymcceewnutzax0xv8aha==30-09-2026 00:00:00
RADHA CONTINENTALSACVIR DIMENSIONS LLPCentral Avenue Road, Chembur, 40007131-10-2027 00:00:00
Bhagwan ResidencyV3 PartnersOxdrfib97ew/Qcpgoksixq==31-12-2025 00:00:00
Trishabh Greens - Wing CRishabh EnterprisesFhzrtgrxrbma/2Rd/Uyjttczlzjtao4rkay18cxvgd6ima1u7ulz7ra3/Pmcqruh30-06-2027 00:00:00
Ornata - SapphireSpenta Enclave Private LimitedMzyllwl3s6iqp9l1aqvhxq==30-06-2025 00:00:00
AeraRe Infra Pvt Ltd28B7lchiwx5z4vdtx/0Cyjaralyx5ntu70ydetlhiiu=31-12-2018 00:00:00
Sai LeelaVriti Infrastructure Pvt. Ltd.F470oeedbdxcrc0cfgr1aph/T8dqw/E4+635Aeiqf2wgjm4fpnmrs+Gmtz2u/E83n93dfxtywe274q6juiwdug==31-12-2017 00:00:00
Subhash Nagar Building No 22G A Builders Pvt Ltd.Mumbai Suburban, 40007130-04-2022 00:00:00
ZynergyMaa Ashapura DevelopersLuusxkowahwb+K3qx9yfvq==30-12-2023 00:00:00
Orchid CourtPranjee Properties Pvt. Ltd.Lu6zipklsquudyzpzszg/W==31-12-2017 00:00:00
RajeswariShree Krishna Homes Pvt LtdEuapfw9stv46l2mixsuhyf/Lzndq03aupnl11dpjwdrvskj9j+Djsqjvrdnankv526lrfi6il9d2uwprtx26vw==31-12-2017 00:00:00
OdinaRajyog EnterpriseX9filaqsbgwtv4eccjgbkw==31-03-2019 00:00:00
Chembur Manshanti ChslMenorah Realties Private LimitedDdhs1xpvl74eupnauimtsqdp2t5f4yioro4fv2re0gf2bhxsznghlgod5bm5pwk630-12-2023 00:00:00
RudrakshSandu DevelopersEnzojc9gzq3zy6j8ougvd90tijorxknfqd+Bb0puyac=31-10-2018 00:00:00
Central ParkShree Ganesh EnterprisesDgaghxrwikybev0sfdtalq5xcvyafgjmddosqrvujgc=31-12-2019 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
ViceroyPinakiprojectsMumbai Suburban, 40007130-06-2022 00:00:00
Amrita PriveSkree Krishna PropertiesIgihpwvslvxnntelr0lsxnhbk6jbe55fzvbt1nxu6cqth44sfowddbyolrvfsziw30-06-2019 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.S0bndgvhy54ah0i8xfoju0skgcaqmgbhef70unelxkv/Vpd8lr3ticzfwz3isneq31-12-2019 00:00:00
United EldoraSun Builders & DevelopersCfbaen4wcgys7ylvx2rsopxjxcnlbqq7c6ndagzvjeugze2nzvrjjyfr8fe0chdg30-09-2020 00:00:00
Sai SansarConcrete Builders+Ac3mrandz6l8w3atqqkywfoid5gykwasgadthgwliw=30-12-2023 00:00:00
Kk GrandeKk RealtyQichxc/Pmlhqkc5mhjzjhsko6ig8gx+7Lp7bwinatyqszbjad21jhmawqjw49i3u31-12-2018 00:00:00
AbhilashSanjona Builders400071, Mumbai Suburban30-12-2017 00:00:00
Pearl BellezaChembur Hotels Private LimitedQfvsozer7phyhs0oav5sda==31-12-2018 00:00:00
Chembur Heights IiKukreja Construction CoIpwyfz3itrhfiuamx17f/Q==30-06-2019 00:00:00
Swastik Plaza C Chs Ltd-AvanaPratibha Veekay Real Estate LlpOmu2lerjdxkqensx95jabq==31-12-2018 00:00:00
Balaji EmpireM/S Trimurti &Amp; K. Mukesh Builders And DevelopersMumbai Suburban, 40007131-12-2008 00:00:00
Rustomjee Balmoral - Wing AKeystone Realtors Limited8G1lshiocgx2d5z+Lt8ccdbyel5xke5z+Zirw74qpwi=15-04-2030 00:00:00
Srushtiraj Siddhi SquareChinnaiah Venkatesh GowdaC8yyf6pxqjj9tvh7+3J+Rw==30-12-2028 00:00:00
InsigniaTwo Taurus Realty Llp36Tyxwwpap/Yp7ido5hlsipg5tt6bx9jo5vginzdjvko7nawyaxxuvpirzi+4Wch31-12-2026 00:00:00
27 PallazzoSiddharth Pankaj ChothaniNogbs845os59iqffgm0jzw==31-12-2025 00:00:00
Le JardinJay Construction IndiaRnsb/6Fiegb2bmbciozzkcr8tc/Mf3ockzqqlcb9ftq=18-05-2018 00:00:00
NishirajUnique Builders & DevelopersQk5jh782+Wqvo5fcumgjc6mtu8doykjogrcdznwtnsi=31-03-2019 00:00:00
Srushti EnclaveGadkari Builders & Associates5Ed5lht3eh6qgyt0ico+Lvvlu1pbymnn/Kor02pxedobt7t1rxmb2lwfwtbbnj6e31-12-2019 00:00:00
Aayush PoornimaAayush DevelopersMhcm+Owa6eylyx5cg+Jmbw==30-06-2019 00:00:00
Zen ApartmentsBholenath Developers Ltd.Nzxtdvfml8pypw+Oy6vvhrvgvd0hi9md/A8mfo5t+Mjxjy9hxlretck96cqvlgpj31-03-2018 00:00:00
Simran HeightsVikas Narayan Raikar+Yzqgustbnvdtldubbtni0xsiwldfrquxqoshoohz9bun5hoog30e1gia9sccszlc+1Asmqpwd+5K6ec2g2co2n+Jwz4wdf0dqf1xqw1ay01gmrzxkw3n6n/Uhsgsh3eubhmbymelq2rdyq2qa+Ndw==24-09-2019 00:00:00
LourdesVictor Homes Pvt Ltd40007130-12-2023 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar HufE/4M4d6l3/I58rz3rfkp1w==30-06-2021 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedDjdn5glruvgpmti3743rrqhnu54ugisodv0durtrmengspz+Q1ummatzabfb1umg30-12-2024 00:00:00
Casa CelesteAster Developers400071, Mumbai City31-12-2019 00:00:00
A.R VintageA.R AssociatesLtdmkpkuips1mzz3cloht8ftolasdvwyg7bfenjyjr0=30-05-2022 00:00:00
Mahesh ApartmentSatyendrakumar Shantiswaroop MaheshEju5s7x/2Bjhlqlk/Qmx/Qpvnbjoudphcs4epx38icm=31-12-2018 00:00:00
Hubtown Seasons - I WingJoynest Premises Private Limited7Smanefmwmrweiqb3xbx9q==30-12-2025 00:00:00
NakshatraMetro Developers Co.Geqkprg5kaadslhbjy+Jfa==30-03-2022 00:00:00
Kedarnath ApartmentsMajestic Royale Developers3Liw5nkrmnwf6qblwgulka==31-12-2027 00:00:00
Hari OmMajestic Royale DevelopersDr5tmu7fn/Nltefbewymhq==30-06-2027 00:00:00
Sai SwaroopSai Sharan HotelsF1smc68/Y9rqa+Yh2uoidvk4f+8Lf+Xmt9v/P6lx9ulznjwl5uf8q+Sv0g/Nnjf5cgmkrdvwcruchjw++0Gjnjvohcnapxduvg/Noiwu5+O=31-12-2027 00:00:00
KedarnathNeeshiv PropertiesOir0fy2u2bo+N9nseu1euq==31-12-2028 00:00:00
KailasaDevnani DevelopersLsk13i3jf8+Pp9mmbljgytmpkyoctb/Qgftic5tnhlhcb/Mfuclkyynhjgg1ffu4vtnf7errwyf4ux5cgv7v1g==30-06-2021 00:00:00
Sidhivinayak AuraMgs Property Developers Pvt. Ltd.Knbvmyxxgvrkco0mqhltkzuhla2jbt5uuylg81fxrua=31-12-2027 00:00:00
Aayush GokulAayush DevelopersDb36ebtf5iky6hetcprkfg==30-06-2027 00:00:00
Rustomjee Balmoral - Wing DKeystone Realtors Limited8G1lshiocgx2d5z+Lt8ccdbyel5xke5z+Zirw74qpwi=15-04-2030 00:00:00
Rustomjee Balmoral - Wing FKeystone Realtors Limited8G1lshiocgx2d5z+Lt8ccdbyel5xke5z+Zirw74qpwi=15-04-2030 00:00:00
Redevelopment Of Gurudeo Geetanjali Chs Ltd.Heritage Lifestyles LlpV7ci80dfzj6wkrykxgovizog1rnba8poaueb3cbd6ss=31-12-2025 00:00:00
Jade ResidencesJsr RealtyO628z3s/Okecgxrdoqt0iw==30-09-2025 00:00:00
71 PardisPardis Construction Llp31-12-2027 00:00:00
Udaya BhuvanShree Krishna Homes Pvt LtdTufqc39qybdr8mechuot/W==31-03-2019 00:00:00
JaihindS.P. Erectors And Developers Private Limited9G9mpzib84gu2u0wgbxa5a==31-12-2023 00:00:00
Sai SaburiPardis La Llp31-12-2027 00:00:00
Shree VaniShree Krishna Properties31-03-2028 00:00:00
Aayush AurumAayush Builders & Developers Llp01-09-2028 00:00:00
Mahavir SereneInfinity Construction Co31-12-2029 00:00:00
Sidheshwar RoyaleM/S Yug DevelopersWndv139exldjrxhwzs4awg==31-03-2026 00:00:00
Balaji Arcade Wing CShikhar DevelopersJxsjjp5l3orfmdhomttxejlcocoqkisuwu2x/Mycojb2dwavpgd6sgywj1i2brkj31-12-2019 00:00:00
Prima Complex5Th Avenue Habitat Llp30-06-2028 00:00:00
Rustomjee Balmoral - Wing CKeystone Realtors Limited15-12-2030 00:00:00
Golfshire AVensco Projects Llp31-12-2030 00:00:00
Golfshire BVensco Projects Llp31-12-2030 00:00:00
Icons 71Skyplus Real Estates Private Limited31-12-2031 00:00:00
Project Details
  • Project:
    Sidhivinayak Flora
  • Location:
  • Lqr9fgjewehvbo40epqphwwnc73f9m5wsljalydv/Ue=
  • Const. Stage:
    New
  • Possession:
    19 Aug 2024
Developer Details

  • Developer:
    Sidhivinayak Constructions
  • Phone:
  • Address:
  • Mahinder Chambers
Project RERA Details
MAHA REARA No: P51800033003
Project Type Residential / Group Housing
RERA Project Status New
Architect Ashish Atmaram Pachupate
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 19 Aug 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 13 Aug 2024
Last Retrived 13 Feb 2026
Sidhivinayak Flora QR Code
Sidhivinayak Flora
MahaRERA - P51800033003
Apartment Details & Configuration
TypeArea
1 BHK37.36 Sq.mts. ( 402 Sq.ft. )
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )
1RK28.16 Sq.mts. ( 303 Sq.ft. )
2 BHK59.94 Sq.mts. ( 645 Sq.ft. )
3 BHK79 Sq.mts. ( 850 Sq.ft. )
2 BHK60.41 Sq.mts. ( 650 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sidhivinayak Floralast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Sidhivinayak Flora
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sidhivinayak Flora by Sidhivinayak Constructionslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

13045 Sq. ft.

Project Area

1959 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

53 apartments in total
Total
53
Booked
39
Available
14

Saleable Area Statistics (Sq. ft.)

33639 Total
Total
33639
Booked
23608
Available
10031
Total 53 apartments in project. 39 apartments booked. 73% apartments booked.
Total 33639 Sq.ft. saleable area. 23608 saleable area booked.
70% area booked.

Flora Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Flora Wing AAug 2024111010029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.36 Sq.mts. ( 402 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK28.16 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.94 Sq.mts. ( 645 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK Owner59.94 Sq.mts. ( 645 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK79 Sq.mts. ( 850 Sq.ft. )9
6 Booked66% Booked
66% Booked
27 total apartments / 19 apartments booked. 70% apartments booked.
Work Description in Building Flora Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress97% done
97% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress97% done
97% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress48% done
48% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked

Flora Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Flora Wing BAug 2024111010027
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.36 Sq.mts. ( 402 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK owner37.36 Sq.mts. ( 402 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK28.16 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK60.41 Sq.mts. ( 650 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK Owner60.41 Sq.mts. ( 650 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK79 Sq.mts. ( 850 Sq.ft. )10
7 Booked70% Booked
70% Booked
26 total apartments / 20 apartments booked. 76% apartments booked.
Work Description in Building Flora Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress97% done
97% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress97% done
97% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress97% done
97% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress48% done
48% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
Sidhivinayak Constructions
for Project
Sidhivinayak Flora
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation