Project overview

Sidhivinayak Flora is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800033003. Sidhivinayak Flora is located at Cts No 454/19 And 454/20. This is a New being developed by Sidhivinayak Constructions.

Sidhivinayak Flora has 1 BHK, 1 BHK owner, 1RK, 2 BHK, 2 BHK Owner & 3 BHK Apartments with carpet areas ranging from 303 to 850 Sq.ft. Carpet. The Project has total 53 of which 14 are currently available for sale.

Sidhivinayak Flora is being developed on a total land area of 13045 Sq.ft. out of which 1959 Sq.ft. i.e 15% is reserved for recreational purposes. Sidhivinayak Flora has 2 Wings / Towers Flora Wing A,Flora Wing B

ProjectDeveloperLocationPossession
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Cts Nos.53/Pt And 52/Pt30-05-2023 00:00:00
Aayush AuraAayush & Arrtha Realtors Llp361 362 36331-12-2018 00:00:00
Siddhi GarimaNha Infraprojects Private LimitedC.T.S. No.4A And 4B31-12-2018 00:00:00
Pure GoldSudhir Vasu Shetty119 And 119 131-03-2018 00:00:00
EdificeBuildproCts 302 Plot No 3431-12-2017 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Krishvi ResidencyShagun Chembur (Aop)176031-12-2019 00:00:00
Little Malabar HillPardis Construction Llp267/1 And 267/2, Cts No 267 Part30-09-2020 00:00:00
Safal TrademarkJai Mata Di Home Construction Pvt Ltd303 1 To 45, Cts No 30330-12-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.831 -Pt31-12-2019 00:00:00
Altavista - Phase 2Spenta Enclave Private Limited343 Part30-06-2021 00:00:00
Altavista - Phase 1Spenta Enclave Private Limited343 Part31-12-2019 00:00:00
PanoramaEkta Shubham VentureCts No 1746/2131-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.1417, 1417/1 To 631-03-2019 00:00:00
Harvest MoonCalvin PropertiesCts No 1389 Plot No 460 Chembur31-12-2019 00:00:00
Central ParkShree Ganesh Enterprises552/1 To 9 /14-A, 55231-12-2019 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
ViceroyPinakiprojectsMumbai Suburban, 40007130-06-2022 00:00:00
Vandana ArtemisThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.833 Pt At Mhada Layout As Rna Continental Subhash Nagar Chembur East Mumbai 40007131-01-2021 00:00:00
Sabari Palm ViewSabari Developers LlpCts No 1746 By 1331-03-2019 00:00:00
Trishabh SignetDimension Housing Realty Llp129531-12-2019 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction CompanyCts No 8 A31-12-2018 00:00:00
United EldoraSun Builders & DevelopersPlot No.92A/Cts No.255 And 255/130-09-2020 00:00:00
Sai SansarConcrete Builders1274/1, Cts 1274, Plot No 42730-12-2023 00:00:00
Kk GrandeKk Realty197/1 To 4, Plot No. 151, Cts No. 19731-12-2018 00:00:00
LegranzEkta Shubham VenturePlot No. 5, Cts No. 11431-12-2018 00:00:00
OrionNivaan Infratech Private LimitedCts Nos. 471 47231-12-2017 00:00:00
GeetanjaliKukreja Construction CoPlot No. 184. Ss Iii, M West Ward, 15Th Road, Village Chembur31-12-2017 00:00:00
Altavista - Phase 4Spenta Enclave Private Limited343 Part30-12-2024 00:00:00
Trishabh Greens - Wing CRishabh Enterprises1677/1 To 4, 167530-06-2027 00:00:00
Ornata - SapphireSpenta Enclave Private Limited343 Part30-06-2025 00:00:00
Ariso ApartmentKyraa Housing Projects828 Part/ 64 To 75, Cts No 828 Part30-12-2024 00:00:00
Meraki ArenaMeraki Habitats LlpCts No 667 619/21A And 21 B 619/14 619/15 Of Village Borla30-11-2020 00:00:00
Castle PeakInnerspace190/1, Plot No. 142 Cts No. 19031-03-2018 00:00:00
Sabari ShobhaSabari Developers LlpCts 1612, 1612-1 To 4 Chembur Village30-11-2020 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private LimitedCts No.469-A30-12-2024 00:00:00
AeraRe Infra Pvt LtdPlot No 560 Cts No 146831-12-2018 00:00:00
Amrita PriveSkree Krishna PropertiesCts No. 1450, Plot No 532 Of Ss Ii30-06-2019 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.973/1 To 9, Plot No.117, Cts Nos. 97331-12-2019 00:00:00
AbhilashSanjona Builders400071, Mumbai Suburban30-12-2017 00:00:00
LourdesVictor Homes Pvt Ltd40007130-12-2023 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar HufCts 94430-06-2021 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedCts 467 Part Village Chembur Tal Kurla30-12-2024 00:00:00
Pearl BellezaChembur Hotels Private LimitedCts 91031-12-2018 00:00:00
Chembur Heights IiKukreja Construction CoCts No. 128/B/530-06-2019 00:00:00
Aayush PoornimaAayush Developers366/1430-06-2019 00:00:00
Hari Kunj IiiKukreja Construction CoCts No.128/B/12A30-09-2020 00:00:00
ZynergyMaa Ashapura DevelopersCts 343Pt30-12-2023 00:00:00
Orchid CourtPranjee Properties Pvt. Ltd.11631-12-2017 00:00:00
Sai LeelaVriti Infrastructure Pvt. Ltd.Plot No 118-C, Cts No 296 Part And 296/3 And 296/431-12-2017 00:00:00
Subhash Nagar Building No 22G A Builders Pvt Ltd.Mumbai Suburban, 40007130-04-2022 00:00:00
Swastik Plaza C Chs Ltd-AvanaPratibha Veekay Real Estate Llp366/1131-12-2018 00:00:00
Zen ApartmentsBholenath Developers Ltd.Plot No. 421 C.T.S. No. 1287/1287 1 To 631-03-2018 00:00:00
Simran HeightsVikas Narayan Raikar379, 378/1 To 3, 376, 377, 379/1, 375, , 376/1 To 3, 374, 380/1 To 3, 37824-09-2019 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land Consultancy116 Part31-12-2018 00:00:00
Vishnu ApolloThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Shrikant Chembers IiShrikant Studios Pvt. Ltd.400071, Mumbai Suburban31-03-2022 00:00:00
KailasaDevnani Developers252/2, 252/1, Cts No. 25230-06-2021 00:00:00
Trishabh Greens - Wing ARishabh Enterprises1675, 167730-12-2025 00:00:00
Project Details
  • Project:
    Sidhivinayak Flora
  • Location:
  • Cts No 454/19 And 454/20
  • Const. Stage:
    New
  • Possession:
    19 Aug 2024
Developer Details

  • Developer:
    Sidhivinayak Constructions
  • Phone:
  • Address:
  • Mahinder Chambers
Project RERA Details
MAHA REARA No: P51800033003
Project Type Residential / Group Housing
RERA Project Status New
Architect Ashish Atmaram Pachupate
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 19 Aug 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 13 Aug 2024
Last Retrived 26 Jul 2025
Sidhivinayak Flora QR Code
Sidhivinayak Flora
MahaRERA - P51800033003
Apartment Details & Configuration
TypeArea
1 BHK37.36 Sq.mts. ( 402 Sq.ft. )
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )
1RK28.16 Sq.mts. ( 303 Sq.ft. )
2 BHK59.94 Sq.mts. ( 645 Sq.ft. )
3 BHK79 Sq.mts. ( 850 Sq.ft. )
2 BHK60.41 Sq.mts. ( 650 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sidhivinayak Floralast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Sidhivinayak Flora
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sidhivinayak Flora by Sidhivinayak Constructionslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

13045 Sq. ft.

Project Area

1959 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

53 apartments in total
Total
53
Booked
39
Available
14

Saleable Area Statistics (Sq. ft.)

33639 Total
Total
33639
Booked
23608
Available
10031
Total 53 apartments in project. 39 apartments booked. 73% apartments booked.
Total 33639 Sq.ft. saleable area. 23608 saleable area booked.
70% area booked.

Flora Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Flora Wing AAug 2024111010029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.36 Sq.mts. ( 402 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK28.16 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.94 Sq.mts. ( 645 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK Owner59.94 Sq.mts. ( 645 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK79 Sq.mts. ( 850 Sq.ft. )9
6 Booked66% Booked
66% Booked
27 total apartments / 19 apartments booked. 70% apartments booked.
Work Description in Building Flora Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress97% done
97% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress48% done
48% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked

Flora Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Flora Wing BAug 2024111010027
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.36 Sq.mts. ( 402 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK owner37.36 Sq.mts. ( 402 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK28.16 Sq.mts. ( 303 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK60.41 Sq.mts. ( 650 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK Owner60.41 Sq.mts. ( 650 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK79 Sq.mts. ( 850 Sq.ft. )10
7 Booked70% Booked
70% Booked
26 total apartments / 20 apartments booked. 76% apartments booked.
Work Description in Building Flora Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress97% done
97% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress48% done
48% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
Sidhivinayak Constructions
for Project
Sidhivinayak Flora
last updated on 26 Jul 2025 as per information obtained from MARA RERA.