Project overview

Siddhivinayak Garima is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000001125. Siddhivinayak Garima is located at 30/0. This is a Ongoing being developed by Siddhivinayak Homes.

Siddhivinayak Garima has Residential Apartments with carpet areas ranging from 322 to 497 Sq.ft. Carpet. The Project has total 236 of which 8 are currently available for sale.

Siddhivinayak Garima is being developed on a total land area of 117743 Sq.ft. out of which 11787 Sq.ft. i.e 10% is reserved for recreational purposes. Siddhivinayak Garima has 7 Wings / Towers Building No 1, A And B Wing,Building No 2, C And D Wing,Building No 3, E And F Wing,Building No 4, G And H Wing,Building No 5, I And J Wing,Building No 6, K, L And M Wing,Building No 7, N Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Siddhivinayak Garima
  • Location:
  • 30/0
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Siddhivinayak Homes
  • Phone:
  • Address:
  • Siddhivinayak Homes
Project RERA Details
MAHA REARA No: P52000001125
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Meenakshi Shrivastav
Funding Bank INDIAN OVERSEAS BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 26 Jul 2017
Last Retrived 28 Jul 2025
Siddhivinayak Garima QR Code
Siddhivinayak Garima
MahaRERA - P52000001125
Apartment Details & Configuration
TypeArea
Residential30.63 Sq.mts. ( 330 Sq.ft. )
Residential31.02 Sq.mts. ( 334 Sq.ft. )
Residential33.63 Sq.mts. ( 362 Sq.ft. )
Residential34.03 Sq.mts. ( 366 Sq.ft. )
Residential45.76 Sq.mts. ( 493 Sq.ft. )
Residential45.9 Sq.mts. ( 494 Sq.ft. )
Residential45.91 Sq.mts. ( 494 Sq.ft. )
Residential45.96 Sq.mts. ( 495 Sq.ft. )
Residential46.58 Sq.mts. ( 501 Sq.ft. )
Residential47.13 Sq.mts. ( 507 Sq.ft. )
Residential29.51 Sq.mts. ( 318 Sq.ft. )
Residential29.6 Sq.mts. ( 319 Sq.ft. )
Residential29.87 Sq.mts. ( 322 Sq.ft. )
Residential30.73 Sq.mts. ( 331 Sq.ft. )
Residential31.1 Sq.mts. ( 335 Sq.ft. )
Residential19.72 Sq.mts. ( 212 Sq.ft. )
Residential22.73 Sq.mts. ( 245 Sq.ft. )
Residential21.33 Sq.mts. ( 230 Sq.ft. )
Residential21.34 Sq.mts. ( 230 Sq.ft. )
Residential30.3 Sq.mts. ( 326 Sq.ft. )
Residential30.39 Sq.mts. ( 327 Sq.ft. )
Residential30.46 Sq.mts. ( 328 Sq.ft. )
Residential30.49 Sq.mts. ( 328 Sq.ft. )
Residential30.5 Sq.mts. ( 328 Sq.ft. )
Residential30.92 Sq.mts. ( 333 Sq.ft. )
Residential30.93 Sq.mts. ( 333 Sq.ft. )
Residential31.63 Sq.mts. ( 340 Sq.ft. )
Residential31.77 Sq.mts. ( 342 Sq.ft. )
Residential43.29 Sq.mts. ( 466 Sq.ft. )
Residential43.41 Sq.mts. ( 467 Sq.ft. )
Residential44.25 Sq.mts. ( 476 Sq.ft. )
Residential46.14 Sq.mts. ( 497 Sq.ft. )
Residential29.65 Sq.mts. ( 319 Sq.ft. )
Residential30.12 Sq.mts. ( 324 Sq.ft. )
Residential30.44 Sq.mts. ( 328 Sq.ft. )
Residential30.56 Sq.mts. ( 329 Sq.ft. )
Residential30.84 Sq.mts. ( 332 Sq.ft. )
Residential30.9 Sq.mts. ( 333 Sq.ft. )
Residential30.95 Sq.mts. ( 333 Sq.ft. )
Residential31.2 Sq.mts. ( 336 Sq.ft. )
Residential31.41 Sq.mts. ( 338 Sq.ft. )
Residential31.59 Sq.mts. ( 340 Sq.ft. )
Residential32.26 Sq.mts. ( 347 Sq.ft. )
Residential32.54 Sq.mts. ( 350 Sq.ft. )
Residential41.9 Sq.mts. ( 451 Sq.ft. )
Residential44.75 Sq.mts. ( 482 Sq.ft. )
Residential45.85 Sq.mts. ( 494 Sq.ft. )
Residential47.02 Sq.mts. ( 506 Sq.ft. )
Residential49.87 Sq.mts. ( 537 Sq.ft. )
Residential29.88 Sq.mts. ( 322 Sq.ft. )
Residential30.62 Sq.mts. ( 330 Sq.ft. )
Residential31.6 Sq.mts. ( 340 Sq.ft. )
Residential32.58 Sq.mts. ( 351 Sq.ft. )
Residential44.68 Sq.mts. ( 481 Sq.ft. )
Residential44.84 Sq.mts. ( 483 Sq.ft. )
Residential46.12 Sq.mts. ( 496 Sq.ft. )
Residential46.18 Sq.mts. ( 497 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Siddhivinayak Garimalast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Work Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Completed
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Work Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Completed
Street Lighting100% completed
95% Complete
Work Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work Completed
Water Supply
As Per Availability From Municipal Corporation
Buildings / Wings in Siddhivinayak Garima
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Siddhivinayak Garima by Siddhivinayak Homeslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

117743 Sq. ft.

Project Area

11787 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

236 apartments in total
Total
236
Booked
228
Available
8

Saleable Area Statistics (Sq. ft.)

91528 Total
Total
91528
Booked
87735
Available
3792
Total 236 apartments in project. 228 apartments booked. 96% apartments booked.
Total 91528 Sq.ft. saleable area. 87735 saleable area booked.
96% area booked.

Building No 1, A And B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1, A And B WingDec 201851010012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential30.63 Sq.mts. ( 330 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential31.02 Sq.mts. ( 334 Sq.ft. )4
3 Booked75% Booked
75% Booked
Residential33.63 Sq.mts. ( 362 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential34.03 Sq.mts. ( 366 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential45.76 Sq.mts. ( 493 Sq.ft. )16
12 Booked75% Booked
75% Booked
32 total apartments / 27 apartments booked. 84% apartments booked.
Work Description in Building Building No 1, A And B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 2, C And D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2, C And D WingDec 201851010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential45.9 Sq.mts. ( 494 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential45.91 Sq.mts. ( 494 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential45.96 Sq.mts. ( 495 Sq.ft. )8
7 Booked87% Booked
87% Booked
Residential46.58 Sq.mts. ( 501 Sq.ft. )12
12 Booked100% Booked
100% Booked
Residential47.13 Sq.mts. ( 507 Sq.ft. )8
8 Booked100% Booked
100% Booked
32 total apartments / 31 apartments booked. 96% apartments booked.
Work Description in Building Building No 2, C And D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 3, E And F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3, E And F WingDec 201851010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential29.51 Sq.mts. ( 318 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential29.6 Sq.mts. ( 319 Sq.ft. )16
16 Booked100% Booked
100% Booked
Residential29.87 Sq.mts. ( 322 Sq.ft. )6
6 Booked100% Booked
100% Booked
Residential30.73 Sq.mts. ( 331 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential31.1 Sq.mts. ( 335 Sq.ft. )6
6 Booked100% Booked
100% Booked
32 total apartments / 32 apartments booked. 100% apartments booked.
Work Description in Building Building No 3, E And F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 4, G And H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 4, G And H WingDec 201851010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential19.72 Sq.mts. ( 212 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential22.73 Sq.mts. ( 245 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential29.6 Sq.mts. ( 319 Sq.ft. )16
16 Booked100% Booked
100% Booked
Residential29.87 Sq.mts. ( 322 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential31.1 Sq.mts. ( 335 Sq.ft. )4
4 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building Building No 4, G And H WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 5, I And J Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 5, I And J WingJan 190051010020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential21.33 Sq.mts. ( 230 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential21.34 Sq.mts. ( 230 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential29.51 Sq.mts. ( 318 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential29.6 Sq.mts. ( 319 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.3 Sq.mts. ( 326 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.39 Sq.mts. ( 327 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.46 Sq.mts. ( 328 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.49 Sq.mts. ( 328 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.5 Sq.mts. ( 328 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.92 Sq.mts. ( 333 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.93 Sq.mts. ( 333 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential31.63 Sq.mts. ( 340 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential31.77 Sq.mts. ( 342 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential43.29 Sq.mts. ( 466 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential43.41 Sq.mts. ( 467 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential44.25 Sq.mts. ( 476 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential46.14 Sq.mts. ( 497 Sq.ft. )6
6 Booked100% Booked
100% Booked
40 total apartments / 40 apartments booked. 100% apartments booked.
Work Description in Building Building No 5, I And J WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 6, K, L And M Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 6, K, L And M WingJan 190051010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential29.65 Sq.mts. ( 319 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential30.12 Sq.mts. ( 324 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.44 Sq.mts. ( 328 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.56 Sq.mts. ( 329 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.84 Sq.mts. ( 332 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.9 Sq.mts. ( 333 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential30.95 Sq.mts. ( 333 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential31.2 Sq.mts. ( 336 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential31.41 Sq.mts. ( 338 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential31.59 Sq.mts. ( 340 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential32.26 Sq.mts. ( 347 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential32.54 Sq.mts. ( 350 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential41.9 Sq.mts. ( 451 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential44.75 Sq.mts. ( 482 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential45.85 Sq.mts. ( 494 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential47.02 Sq.mts. ( 506 Sq.ft. )2
2 Booked100% Booked
100% Booked
Residential49.87 Sq.mts. ( 537 Sq.ft. )2
2 Booked100% Booked
100% Booked
40 total apartments / 40 apartments booked. 100% apartments booked.
Work Description in Building Building No 6, K, L And M WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building No 7, N Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 7, N WingDec 201851010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential29.88 Sq.mts. ( 322 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential30.62 Sq.mts. ( 330 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential31.6 Sq.mts. ( 340 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential32.58 Sq.mts. ( 351 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential44.68 Sq.mts. ( 481 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential44.84 Sq.mts. ( 483 Sq.ft. )4
4 Booked100% Booked
100% Booked
Residential46.12 Sq.mts. ( 496 Sq.ft. )4
3 Booked75% Booked
75% Booked
Residential46.18 Sq.mts. ( 497 Sq.ft. )4
3 Booked75% Booked
75% Booked
32 total apartments / 30 apartments booked. 93% apartments booked.
Work Description in Building Building No 7, N WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Siddhivinayak Homes
for Project
Siddhivinayak Garima
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation