Project overview

SIDDHIVINAYAK is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800011066. SIDDHIVINAYAK is located at 88. This is a New being developed by Triumph Ventures.

SIDDHIVINAYAK has 2 BHK Apartments with carpet areas ranging from 731 to 837 Sq.ft. Carpet. The Project has total 146 of which 13 are currently available for sale.

SIDDHIVINAYAK is being developed on a total land area of 20882 Sq.ft. out of which 5500 Sq.ft. i.e 26% is reserved for recreational purposes. SIDDHIVINAYAK has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    SIDDHIVINAYAK
  • Location:
  • 88
  • Const. Stage:
    New
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Triumph Ventures
  • Phone:
  • Address:
  • Chintamani Plaza,
Project RERA Details
MAHA REARA No: P51800011066
Project Type Residential / Group Housing
RERA Project Status New
Architect Irani Architects
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 06 Oct 2023
Last Retrived 13 Feb 2026
SIDDHIVINAYAK QR Code
SIDDHIVINAYAK
MahaRERA - P51800011066
Apartment Details & Configuration
TypeArea
2 BHK58.46 Sq.mts. ( 629 Sq.ft. )
2 BHK57.61 Sq.mts. ( 620 Sq.ft. )
2 BHK TYPE 158.02 Sq.mts. ( 625 Sq.ft. )
2 BHK TYPE 257.66 Sq.mts. ( 621 Sq.ft. )
2 BHK TYPE 974.71 Sq.mts. ( 804 Sq.ft. )
2 BHK67.91 Sq.mts. ( 731 Sq.ft. )
2 BHK71.87 Sq.mts. ( 774 Sq.ft. )
2 BHK72.43 Sq.mts. ( 780 Sq.ft. )
2 BHK90.09 Sq.mts. ( 970 Sq.ft. )
2 BHK91.08 Sq.mts. ( 980 Sq.ft. )
2 BHK67.9 Sq.mts. ( 731 Sq.ft. )
2 BHK69.65 Sq.mts. ( 750 Sq.ft. )
2 BHK77.79 Sq.mts. ( 837 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of SIDDHIVINAYAKlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking100% completed
95% Complete
Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in SIDDHIVINAYAK
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of SIDDHIVINAYAK by Triumph Ventureslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

20882 Sq. ft.

Project Area

5500 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

146 apartments in total
Total
146
Booked
133
Available
13

Saleable Area Statistics (Sq. ft.)

109136 Total
Total
109136
Booked
99640
Available
9496
Total 146 apartments in project. 133 apartments booked. 91% apartments booked.
Total 109136 Sq.ft. saleable area. 99640 saleable area booked.
91% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 202122121001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.46 Sq.mts. ( 629 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK57.61 Sq.mts. ( 620 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK TYPE 158.02 Sq.mts. ( 625 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK TYPE 257.66 Sq.mts. ( 621 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK TYPE 974.71 Sq.mts. ( 804 Sq.ft. )1
1 Booked100% Booked
100% Booked
24 total apartments / 20 apartments booked. 83% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202122121001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK67.91 Sq.mts. ( 731 Sq.ft. )21
18 Booked85% Booked
85% Booked
2 BHK71.87 Sq.mts. ( 774 Sq.ft. )19
17 Booked89% Booked
89% Booked
2 BHK72.43 Sq.mts. ( 780 Sq.ft. )19
19 Booked100% Booked
100% Booked
2 BHK90.09 Sq.mts. ( 970 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK91.08 Sq.mts. ( 980 Sq.ft. )1
1 Booked100% Booked
100% Booked
61 total apartments / 56 apartments booked. 91% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202122121001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK67.9 Sq.mts. ( 731 Sq.ft. )21
21 Booked100% Booked
100% Booked
2 BHK69.65 Sq.mts. ( 750 Sq.ft. )19
18 Booked94% Booked
94% Booked
2 BHK77.79 Sq.mts. ( 837 Sq.ft. )21
18 Booked85% Booked
85% Booked
61 total apartments / 57 apartments booked. 93% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Triumph Ventures
for Project
SIDDHIVINAYAK
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation