Project overview
SIDDHIVINAYAK is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800011066. SIDDHIVINAYAK is located at 88. This is a New being developed by Triumph Ventures.
SIDDHIVINAYAK has 2 BHK Apartments with carpet areas ranging from 731 to 837 Sq.ft. Carpet. The Project has total 146 of which 13 are currently available for sale.
SIDDHIVINAYAK is being developed on a total land area of 20882 Sq.ft. out of which 5500 Sq.ft. i.e 26% is reserved for recreational purposes. SIDDHIVINAYAK has 3 Wings / Towers Wing A,Wing B,Wing C
| Project | Developer | Location | Possession |
-
Project:
SIDDHIVINAYAK
-
Location:
-
88
-
Const. Stage:
New
-
Possession:
30 Jun 2021
-
Developer:
Triumph Ventures
-
Phone:
-
Address:
-
Chintamani Plaza,
| MAHA REARA No: |
P51800011066 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Irani Architects |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Jun 2021 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
06 Oct 2023 |
| Last Retrived |
13 Feb 2026 |
SIDDHIVINAYAK QR Code
SIDDHIVINAYAK
MahaRERA - P51800011066
| Type | Area |
| 2 BHK | 58.46 Sq.mts. ( 629 Sq.ft. ) |
| 2 BHK | 57.61 Sq.mts. ( 620 Sq.ft. ) |
| 2 BHK TYPE 1 | 58.02 Sq.mts. ( 625 Sq.ft. ) |
| 2 BHK TYPE 2 | 57.66 Sq.mts. ( 621 Sq.ft. ) |
| 2 BHK TYPE 9 | 74.71 Sq.mts. ( 804 Sq.ft. ) |
| 2 BHK | 67.91 Sq.mts. ( 731 Sq.ft. ) |
| 2 BHK | 71.87 Sq.mts. ( 774 Sq.ft. ) |
| 2 BHK | 72.43 Sq.mts. ( 780 Sq.ft. ) |
| 2 BHK | 90.09 Sq.mts. ( 970 Sq.ft. ) |
| 2 BHK | 91.08 Sq.mts. ( 980 Sq.ft. ) |
| 2 BHK | 67.9 Sq.mts. ( 731 Sq.ft. ) |
| 2 BHK | 69.65 Sq.mts. ( 750 Sq.ft. ) |
| 2 BHK | 77.79 Sq.mts. ( 837 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of SIDDHIVINAYAKlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space100% completed
|
|
Completed |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
Completed |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements100% completed
|
|
Completed |
Landscaping & Tree Planting100% completed
|
|
Completed |
Open Parking100% completed
|
|
Completed |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Completed |
Solid Waste Management And Disposal
|
|
Na |
Storm Water Drains100% completed
|
|
Completed |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting100% completed
|
|
Completed |
Water Supply100% completed
|
|
Completed |
Buildings / Wings in SIDDHIVINAYAK
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of SIDDHIVINAYAK by Triumph Ventureslast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Apartments Statistics
146
apartments in total
Saleable Area Statistics (Sq. ft.)
109136
Total
Total 146 apartments in project. 133 apartments booked. 91% apartments booked.
Total 109136 Sq.ft. saleable area. 99640 saleable area booked.
91% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing A | Jun 2021 | 22 | 1 | 2 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 58.46 Sq.mts. ( 629 Sq.ft. ) | 6 | |
| 2 BHK | 57.61 Sq.mts. ( 620 Sq.ft. ) | 6 | |
| 2 BHK TYPE 1 | 58.02 Sq.mts. ( 625 Sq.ft. ) | 5 | |
| 2 BHK TYPE 2 | 57.66 Sq.mts. ( 621 Sq.ft. ) | 6 | |
| 2 BHK TYPE 9 | 74.71 Sq.mts. ( 804 Sq.ft. ) | 1 | |
24 total apartments / 20 apartments booked. 83% apartments booked. |
| Work Description in Building Wing A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing B | Jun 2021 | 22 | 1 | 2 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 67.91 Sq.mts. ( 731 Sq.ft. ) | 21 | |
| 2 BHK | 71.87 Sq.mts. ( 774 Sq.ft. ) | 19 | |
| 2 BHK | 72.43 Sq.mts. ( 780 Sq.ft. ) | 19 | |
| 2 BHK | 90.09 Sq.mts. ( 970 Sq.ft. ) | 1 | |
| 2 BHK | 91.08 Sq.mts. ( 980 Sq.ft. ) | 1 | |
61 total apartments / 56 apartments booked. 91% apartments booked. |
| Work Description in Building Wing B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing C | Jun 2021 | 22 | 1 | 2 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 67.9 Sq.mts. ( 731 Sq.ft. ) | 21 | |
| 2 BHK | 69.65 Sq.mts. ( 750 Sq.ft. ) | 19 | |
| 2 BHK | 77.79 Sq.mts. ( 837 Sq.ft. ) | 21 | |
61 total apartments / 57 apartments booked. 93% apartments booked. |
| Work Description in Building Wing C | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Triumph Ventures
for Project
SIDDHIVINAYAK
last updated on
13 Feb 2026 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |