Project overview

Siddhi Vinayak Grandeur is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900013137. Siddhi Vinayak Grandeur is located at 913. This is a Ongoing being developed by Gopal Rampritsingh Thakur.

Siddhi Vinayak Grandeur has 2 BHK & Shop Apartments with carpet areas ranging from 1192 to 739 Sq.ft. Carpet. The Project has total 22 of which 0 are currently available for sale.

Siddhi Vinayak Grandeur is being developed on a total land area of 5490 Sq.ft. Siddhi Vinayak Grandeur has 1 Wings / Towers Siddhi Vinayak Grandeur

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Siddhi Vinayak Grandeur
  • Location:
  • 913
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Gopal Rampritsingh Thakur
  • Phone:
  • Address:
  • Thanishka Commerical Premises
Project RERA Details
MAHA REARA No: P51900013137
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Wairkars
Funding Bank NKGSB COOPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession 31 Oct 2023
Litigations No Litigations
Last Modified 22 Mar 2024
Last Retrived 26 Jul 2025
Siddhi Vinayak Grandeur QR Code
Siddhi Vinayak Grandeur
MahaRERA - P51900013137
Apartment Details & Configuration
TypeArea
2 BHK63.07 Sq.mts. ( 679 Sq.ft. )
2 BHK63.3 Sq.mts. ( 681 Sq.ft. )
2 BHK68.62 Sq.mts. ( 739 Sq.ft. )
Shop110.7 Sq.mts. ( 1192 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Siddhi Vinayak Grandeurlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Construction Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Construction Completed
Landscaping & Tree Planting100% completed
95% Complete
Construction Completed
Open Parking100% completed
95% Complete
Construction Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Construction Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Construction Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Construction Completed
Water Supply100% completed
95% Complete
Construction Completed
Buildings / Wings in Siddhi Vinayak Grandeur
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Siddhi Vinayak Grandeur by Gopal Rampritsingh Thakurlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5490 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

22 apartments in total
Total
22
Booked
22
Available
0

Saleable Area Statistics (Sq. ft.)

16556 Total
Total
16556
Booked
16556
Available
0
Total 22 apartments in project. 22 apartments booked. 100% apartments booked.
Total 16556 Sq.ft. saleable area. 16556 saleable area booked.
100% area booked.

Siddhi Vinayak Grandeur

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Siddhi Vinayak GrandeurDec 2021221003624
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK63.07 Sq.mts. ( 679 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK63.3 Sq.mts. ( 681 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK68.62 Sq.mts. ( 739 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop110.7 Sq.mts. ( 1192 Sq.ft. )3
3 Booked100% Booked
100% Booked
22 total apartments / 22 apartments booked. 100% apartments booked.
Work Description in Building Siddhi Vinayak GrandeurCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Gopal Rampritsingh Thakur
for Project
Siddhi Vinayak Grandeur
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation