Project overview

Siddharth Residency Building No 2 Wing D And E is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800010378. Siddharth Residency Building No 2 Wing D And E is located at 776 B 1. This is a Ongoing being developed by Ramesh Jadhavji Gajra.

Siddharth Residency Building No 2 Wing D And E has 1 BHK Apartments with carpet areas ranging from 369 to 392 Sq.ft. Carpet. The Project has total 32 of which 32 are currently available for sale.

Siddharth Residency Building No 2 Wing D And E is being developed on a total land area of 40354 Sq.ft. out of which 3553 Sq.ft. i.e 9% is reserved for recreational purposes. Siddharth Residency Building No 2 Wing D And E has 1 Wings / Towers Building No 2 Wing D And E

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Siddharth Residency Building No 2 Wing D And E
  • Location:
  • 776 B 1
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Ramesh Jadhavji Gajra
  • Phone:
  • Address:
  • Satyam Shopping Centre
Project RERA Details
MAHA REARA No: P51800010378
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Jayant Ratilal Katira
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 24 Aug 2017
Last Retrived 26 Jul 2025
Siddharth Residency Building No 2 Wing D And E QR Code
Siddharth Residency Building No 2 Wing D And E
MahaRERA - P51800010378
Apartment Details & Configuration
TypeArea
1 BHK34.26 Sq.mts. ( 369 Sq.ft. )
1 BHK35.01 Sq.mts. ( 377 Sq.ft. )
1 BHK36.38 Sq.mts. ( 392 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Siddharth Residency Building No 2 Wing D And Elast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Electric Sub Station Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Full Completed
Energy management
Will Be Completed After Building Construction
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Full Completed
Open Parking100% completed
95% Complete
Full Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Full Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Full Completed
Street Lighting100% completed
95% Complete
Full Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Full Completed
Buildings / Wings in Siddharth Residency Building No 2 Wing D And E
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Siddharth Residency Building No 2 Wing D And E by Ramesh Jadhavji Gajralast updated on 26 Jul 2025 as per information obtained from MARA RERA.

40354 Sq. ft.

Project Area

3553 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

32 apartments in total
Total
32
Booked
0
Available
32

Saleable Area Statistics (Sq. ft.)

11924 Total
Total
11924
Booked
0
Available
11924
Total 32 apartments in project. 0 apartments booked. 0% apartments booked.
Total 11924 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building No 2 Wing D And E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2 Wing D And EJan 19005101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.26 Sq.mts. ( 369 Sq.ft. )24
None Booked0% Booked
0% Booked
1 BHK35.01 Sq.mts. ( 377 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK36.38 Sq.mts. ( 392 Sq.ft. )4
None Booked0% Booked
0% Booked
32 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 2 Wing D And ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ramesh Jadhavji Gajra
for Project
Siddharth Residency Building No 2 Wing D And E
last updated on 26 Jul 2025 as per information obtained from MARA RERA.