Project overview

Siddhagiri Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000014294. Siddhagiri Residency is located at 223, Sector-17. This is a New being developed by Ss Engineering.

Siddhagiri Residency has 1 BHK & 1RK Apartments with carpet areas ranging from 195 to 315 Sq.ft. Carpet. The Project has total 17 of which 12 are currently available for sale.

Siddhagiri Residency is being developed on a total land area of 3223 Sq.ft. Siddhagiri Residency has 1 Wings / Towers Siddhagiri Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Siddhagiri Residency
  • Location:
  • 223, Sector-17
  • Const. Stage:
    New
  • Possession:
    01 Nov 2020
Developer Details

  • Developer:
    Ss Engineering
  • Phone:
  • Address:
  • Today Housing
Project RERA Details
MAHA REARA No: P52000014294
Project Type Residential / Group Housing
RERA Project Status New
Architect Pioneer Architect
Funding Bank APNA SAHAKARI BANK LIMITED
Proposed Possession 01 Nov 2020
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Nov 2022
Last Retrived 28 Jul 2025
Siddhagiri Residency QR Code
Siddhagiri Residency
MahaRERA - P52000014294
Apartment Details & Configuration
TypeArea
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )
1 BHK29.17 Sq.mts. ( 314 Sq.ft. )
1 BHK29.26 Sq.mts. ( 315 Sq.ft. )
1RK18.11 Sq.mts. ( 195 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Siddhagiri Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Schedule
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
As Per Schedule
Open Parking
As Per Schedule
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Schedule
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Schedule
Street Lighting100% completed
95% Complete
Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
As Per Schedule
Buildings / Wings in Siddhagiri Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Siddhagiri Residency by Ss Engineeringlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

3223 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

17 apartments in total
Total
17
Booked
5
Available
12

Saleable Area Statistics (Sq. ft.)

5167 Total
Total
5167
Booked
1558
Available
3609
Total 17 apartments in project. 5 apartments booked. 29% apartments booked.
Total 5167 Sq.ft. saleable area. 1558 saleable area booked.
30% area booked.

Siddhagiri Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Siddhagiri ResidencyJan 20205100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK29.17 Sq.mts. ( 314 Sq.ft. )8
2 Booked25% Booked
25% Booked
1 BHK29.26 Sq.mts. ( 315 Sq.ft. )4
2 Booked50% Booked
50% Booked
1RK18.11 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
17 total apartments / 5 apartments booked. 29% apartments booked.
Work Description in Building Siddhagiri ResidencyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ss Engineering
for Project
Siddhagiri Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation