Project overview

Shyam Aangan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700047719. Shyam Aangan is located at Blk No.C-928, Room No.1856 With Adjacent Land Bearing Cts No.24475 And 24476. This is a New being developed by Sachdev Developers (Opc) Private Limited.

Shyam Aangan has 1 BHK & 2 BHK Apartments with carpet areas ranging from 312 to 485 Sq.ft. Carpet. The Project has total 35 of which 35 are currently available for sale.

Shyam Aangan is being developed on a total land area of 4556 Sq.ft. Shyam Aangan has 1 Wings / Towers Shyam Aangan

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shyam Aangan
  • Location:
  • Blk No.C-928, Room No.1856 With Adjacent Land Bearing Cts No.24475 And 24476
  • Const. Stage:
    New
  • Possession:
    30 Nov 2024
Developer Details

  • Developer:
    Sachdev Developers (Opc) Private Limited
  • Phone:
  • Address:
  • Dayal Tere Naam Taran
Project RERA Details
MAHA REARA No: P51700047719
Project Type Residential / Group Housing
RERA Project Status New
Architect Prasad K Garad
Funding Bank AXIS BANK
Proposed Possession 30 Nov 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Nov 2022
Last Retrived 26 Jul 2025
Shyam Aangan QR Code
Shyam Aangan
MahaRERA - P51700047719
Apartment Details & Configuration
TypeArea
1 BHK28.98 Sq.mts. ( 312 Sq.ft. )
1 BHK31.19 Sq.mts. ( 336 Sq.ft. )
1 BHK31.94 Sq.mts. ( 344 Sq.ft. )
2 BHK45.08 Sq.mts. ( 485 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shyam Aanganlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Work Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Connected To Municipal Drainage Line
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Borewell
Buildings / Wings in Shyam Aangan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shyam Aangan by Sachdev Developers (Opc) Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4556 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

35 apartments in total
Total
35
Booked
0
Available
35

Saleable Area Statistics (Sq. ft.)

13734 Total
Total
13734
Booked
0
Available
13734
Total 35 apartments in project. 0 apartments booked. 0% apartments booked.
Total 13734 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Shyam Aangan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shyam AanganNov 2024710001718
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.98 Sq.mts. ( 312 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK31.19 Sq.mts. ( 336 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK31.94 Sq.mts. ( 344 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK45.08 Sq.mts. ( 485 Sq.ft. )14
None Booked0% Booked
0% Booked
35 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Shyam AanganCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Sachdev Developers (Opc) Private Limited
for Project
Shyam Aangan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation