Project overview

Shubham is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700028556. Shubham is located at 400701. This is a New Project being developed by Krystal Buildcon.

Shubham has 1 BHK, 1RK, 2 BHK & Shop Apartments with carpet areas ranging from 184 to 509 Sq.ft. Carpet. The Project has total 29 of which 29 are currently available for sale.

Shubham is being developed on a total land area of 6997 Sq.ft. Shubham has 1 Wings / Towers Shubham

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shubham
  • Location:
  • 400701
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Krystal Buildcon
  • Phone:
  • Address:
  • Flat No 401, Sonai (Skyline), Plot No 11, Ghansoli, Sector 15, 400701
Project RERA Details
MAHA REARA No: P51700028556
Project Type Others
RERA Project Status New Project
Funding Bank CANARA BANK
Proposed Possession 30 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Mar 2021
Last Retrived 28 Jul 2025
Shubham QR Code
Shubham
MahaRERA - P51700028556
Apartment Details & Configuration
TypeArea
1 BHK31.35 Sq.mts. ( 337 Sq.ft. )
1 BHK35.25 Sq.mts. ( 379 Sq.ft. )
1RK19.41 Sq.mts. ( 209 Sq.ft. )
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )
Shop17.08 Sq.mts. ( 184 Sq.ft. )
Shop17.22 Sq.mts. ( 185 Sq.ft. )
Shop18.84 Sq.mts. ( 203 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shubhamlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
7 Trees
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Nmmc Storm Water Drains
Solid Waste Management And Disposal
Na
Storm Water Drains
Nmmc Storm Water Drains
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
Nmmc Water Supply
Buildings / Wings in Shubham
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shubham by Krystal Buildconlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

6997 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

29 apartments in total
Total
29
Booked
0
Available
29

Saleable Area Statistics (Sq. ft.)

11226 Total
Total
11226
Booked
0
Available
11226
Total 29 apartments in project. 0 apartments booked. 0% apartments booked.
Total 11226 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Shubham

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShubhamJun 202371010228
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.35 Sq.mts. ( 337 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK35.25 Sq.mts. ( 379 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK19.41 Sq.mts. ( 209 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )12
None Booked0% Booked
0% Booked
Shop17.08 Sq.mts. ( 184 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.22 Sq.mts. ( 185 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.84 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
29 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building ShubhamCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Krystal Buildcon
for Project
Shubham
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation