Project overview

Shubh Parshwa is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800029898. Shubh Parshwa is located at Cts No. 555 Part. This is a New being developed by S. Siddharth Construction Co. (Panchshil).

Shubh Parshwa has 1 BHK, 2 BHK, Balwadi, Comm. Hall., Exi Balwadi, Library, Office space, Shop, Society Office, Welfare C. & Women. En. Apartments with carpet areas ranging from 158 to 935 Sq.ft. Carpet. The Project has total 111 of which 75 are currently available for sale.

Shubh Parshwa is being developed on a total land area of 10613 Sq.ft. out of which 548 Sq.ft. i.e 5% is reserved for recreational purposes. Shubh Parshwa has 1 Wings / Towers Shubh Parshwa

ProjectDeveloperLocationPossession
Siyara IconShakti Realty1/34/35/36/44/79/3/80/131-12-2025 00:00:00
SpectrumKulin Enterprises3445-3454, 3455-347401-12-2024 00:00:00
Liana CMacrotech Developers Limited65 /15 A (Pt)31-03-2026 00:00:00
Sai LeelaSaijyotbuilders&DevelopersPlot No 20 Sector 30D30-06-2024 00:00:00
Shiv HeightsBalaji DevelopersSurvey No.15 Hissa No 731-03-2023 00:00:00
Shree Sai Saburi Apartment-Building BShree Saishraddha EnterprisesSurvey No 9/3 And 16/131-03-2025 00:00:00
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Mount CasaNagraj Mutha108B,112A/3, 113B31-12-2026 00:00:00
Upper Thane-Casa EdenMacrotech Developers Limited55/12 A31-03-2026 00:00:00
Omkar HeightsOmkar Builders & DevelopersCts No 114831-03-2024 00:00:00
Gami Industrial Park - C BuildingGolden Falcon Pacific LtdPlot No C-39A31-12-2024 00:00:00
Shreeji CloudShreeji Lifespaces InfrastructurePlot No 78, Sector 21 At Ulwe30-06-2026 00:00:00
Priyal AumShree Mauli Chs LtdPlot No 47 Sector 2601-06-2024 00:00:00
Jay ResidencyMukesh Vithal GiteS.No. 111/H.No. 2/1/3/531-12-2024 00:00:00
Seven HeightsOvais Mudabbir BardiS No 15/1 20/2 Plot No 4 And Cts No 383831-12-2025 00:00:00
Jardino AMacrotech Developers Limited62/2 P, 62/3 P And 65/5C P31-08-2027 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Upper Thane-Iris Wing AMacrotech Developers Limited293/1 And 293/331-12-2027 00:00:00
Jivdani BuildingMildstone Enterprises Llp133231-12-2024 00:00:00
Yashraj HeightsVikrant Vikas Raikar731-01-2025 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Chandrakant ResidencyAmogh ConstructionC.T.S No- 2 To 8 & C.T.S No- 169 To 178, C.T.S No- 295 To 30031-12-2027 00:00:00
Daisy Gardens Building No.13Ankita BuildersSurvey No 9, Hissa No 2A30-06-2026 00:00:00
Madhusudan Retreat TerracesMadhusudan Leisure HomesSurvey No 5031-12-2026 00:00:00
Vardhaman Tower Building Nos. 6 & 7Vardhaman Property DevelopersPlot Bearing Surveyno.26Hissa No1(Part)31-12-2023 00:00:00
Zircon HeightsIqbal Abdul Rauf Punjabi59/1, 83/5 Paiki, Cts No 482931-12-2024 00:00:00
Panvelkar EmpireOm Sai Shraddha DevelopersSurvey No. 30/4 (P)30-06-2026 00:00:00
Om Sai One ParkInfini DevelopersCts 133/3 133/4 134/3 134/5 134/9 134/10 134/11 134/4/A 138/13/A 138/13/B 138/13/C31-12-2028 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Joshi ArcadeMeera DevelopersSurvey No 34-1/12, Hissa No. 3, Plot No. 731-03-2026 00:00:00
Sai Narayana ResidencyMm Landmark Realty LlpS.No.1431-12-2025 00:00:00
Belvedere-B And CMacrotech Developers Limited212/7A Part 212/7B Part 212/7C Part 212/7D Part 212/7E Part 25/2A(Part) 25/2B(Part) 25/4(Part)30-11-2027 00:00:00
Sai Dream OneGls InfrastructuresS No.88, H No 6 & 731-12-2025 00:00:00
Neelkanth Palm AvenueNeelkanth InfratechPlot No-23 & 24, Sector-09 Ghansoli29-12-2029 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Rai S VrundavanRai Residency Private LimitedSurvey No 64 Hissa No 230-12-2023 00:00:00
Takshila ResidencyDelux AssociatesS No 157/13Pt S No 158/1Pt Plot No 1 And 230-12-2023 00:00:00
Om RamchandraLaxmi DevelopersGaothan Chalata No 109 House No 38030-11-2020 00:00:00
Sajan Shantaram HeightTirupati DevelopersNew Survey No.1 Hissa No 1130-06-2021 00:00:00
Ram JanakiShree Ganesh Enterprises4947 To 495230-12-2026 00:00:00
Apple ParadiseApple ParadiseU No 99,100, Plot No 262 Part01-01-2019 00:00:00
Mavis Tower A Wing From 5Th Floor To 7Th FloorM/S. Unit Arsen Developers (Joint Venture)431C Part31-12-2019 00:00:00
Infinite ResidencyMistry Construction Co. Pvt. Ltd.Pocket D And E30-06-2029 00:00:00
Mansipooja HeightS K InfrastructureSurvey No 3 Hissa No 630-03-2023 00:00:00
Seasons ParkShree Balaji HomesS No 49 H No 4/A, 4/B,6/D30-12-2022 00:00:00
Amrut SiddhiJayshree Builders40/2 40/3 40/4 40/5A 40/6 40/7 41/3 41/4A 41/4B 41/4C30-12-2023 00:00:00
Vaibhav HorizonVaibhav Siddhi Construction Co.563 4 Pt/4 Pt/4 Pt24-09-2023 00:00:00
Aramus ResidencyAramus Realty Llp34A30-12-2023 00:00:00
Palava Florea - A To DPalava Dwellers Private Limited61 Pt 62 Pt Village Khoni31-07-2023 00:00:00
Shree Ram Co Operative Housing Society LimitedSantosh Vasant ChitnisS No 704/2 706/6 Old , 286/2 294/6 Cts No 821 And 82231-03-2025 00:00:00
Yashshree Co.Op.Hsg.SocNitant Narendra DesaiSurvey No. 28, Hissa No. 3/2/K30-09-2025 00:00:00
Vaishnavi HightsVaishnavi Builders & Developers58,H No.1 P.No. 1 & 224-06-2024 00:00:00
Fatima Enclave- C WingRais Aziz Qureshi46/4 , 46/531-12-2025 00:00:00
Shree Prabhucharan Chs.LtdShree Prabhucharan Co-Op Housing Society66/5/6731-03-2024 00:00:00
Aastha OmkarAastha RealtorsS. No. 56, H. No. 35/D/2B/1 To 35/D/2B/14 And H. No. 35/D/2B/15/131-12-2026 00:00:00
PurvaGnp Developers58/66/14C And 58/66/15 Plot No 14 And 1531-12-2019 00:00:00
Foresta & FioraPalava Dwellers Private Limited53/3,65/15A, 65/15B28-08-2023 00:00:00
Neelkanth Palm PresidentNeelkanth InfratechPlot No 10 Sectot 11 Ghansoli31-12-2029 00:00:00
Garden Estate Phase -IiShree Balaji DevelopersSurvey No. 46, Hissa No. 12/131-03-2025 00:00:00
Parvati NiwasAadarsh DevelopersCst No 27/1B, 27/1C Tikka No 2231-12-2025 00:00:00
Ritz Phase - IiVikas Harakchand JainSurvey No. 39/5 Part, 6/1 Part And 6/2 Part.30-06-2024 00:00:00
Ganpati HeightsManoj Prabhakar PatilS. No 2 H No 23B30-05-2024 00:00:00
Omkar Darshan Co Op Hsg SocVinod Madhukar BhoirS No 26 H No 2A Plot No 430-06-2024 00:00:00
Vedant Palacia Phase Iv Wing B-BrutusTharwani PropertiesSr.No.16,Hissa No.431-12-2026 00:00:00
Delta StellarNoble Organics Pvt. Ltd.Plot No D-43/3 And D-43/431-12-2028 00:00:00
Mauli SadanMauli ConstructionCts 9039 To 904304-02-2024 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
Project Details
  • Project:
    Shubh Parshwa
  • Location:
  • Cts No. 555 Part
  • Const. Stage:
    New
  • Possession:
    31 Dec 2023
Developer Details

  • Developer:
    S. Siddharth Construction Co. (Panchshil)
  • Phone:
  • Address:
  • Shubh Parshwa
Project RERA Details
MAHA REARA No: P51800029898
Project Type Residential / Group Housing
RERA Project Status New
Architect Ace Consultants
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Mar 2025
Last Retrived 26 Jul 2025
Shubh Parshwa QR Code
Shubh Parshwa
MahaRERA - P51800029898
Apartment Details & Configuration
TypeArea
1 BHK28.36 Sq.mts. ( 305 Sq.ft. )
1 BHK28.75 Sq.mts. ( 309 Sq.ft. )
1 BHK28.91 Sq.mts. ( 311 Sq.ft. )
1 BHK39.11 Sq.mts. ( 421 Sq.ft. )
2 BHK60.79 Sq.mts. ( 654 Sq.ft. )
2 BHK54.2 Sq.mts. ( 583 Sq.ft. )
2 BHK55.89 Sq.mts. ( 602 Sq.ft. )
2 BHK59.78 Sq.mts. ( 643 Sq.ft. )
Balwadi29.15 Sq.mts. ( 314 Sq.ft. )
Comm. Hall.39.57 Sq.mts. ( 426 Sq.ft. )
Exi Balwadi60.18 Sq.mts. ( 648 Sq.ft. )
Library28.25 Sq.mts. ( 304 Sq.ft. )
Office space86.43 Sq.mts. ( 930 Sq.ft. )
Office space86.9 Sq.mts. ( 935 Sq.ft. )
Shop7.21 Sq.mts. ( 78 Sq.ft. )
Shop14.64 Sq.mts. ( 158 Sq.ft. )
Shop18.41 Sq.mts. ( 198 Sq.ft. )
Shop18.71 Sq.mts. ( 201 Sq.ft. )
Shop19.22 Sq.mts. ( 207 Sq.ft. )
Shop19.83 Sq.mts. ( 213 Sq.ft. )
Shop22 Sq.mts. ( 237 Sq.ft. )
Shop25.64 Sq.mts. ( 276 Sq.ft. )
Shop27.26 Sq.mts. ( 293 Sq.ft. )
Society Office23.11 Sq.mts. ( 249 Sq.ft. )
Society Office20.63 Sq.mts. ( 222 Sq.ft. )
Women. En.29.05 Sq.mts. ( 313 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shubh Parshwalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station10% completed
10% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements25% completed
25% Complete
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)10% completed
10% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Shubh Parshwa
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shubh Parshwa by S. Siddharth Construction Co. (Panchshil)last updated on 26 Jul 2025 as per information obtained from MARA RERA.

10613 Sq. ft.

Project Area

548 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

111 apartments in total
Total
111
Booked
36
Available
75

Saleable Area Statistics (Sq. ft.)

46400 Total
Total
46400
Booked
21180
Available
25220
Total 111 apartments in project. 36 apartments booked. 32% apartments booked.
Total 46400 Sq.ft. saleable area. 21180 saleable area booked.
46% area booked.

Shubh Parshwa

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shubh ParshwaDec 2023241100030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.36 Sq.mts. ( 305 Sq.ft. )18
None Booked0% Booked
0% Booked
1 BHK28.75 Sq.mts. ( 309 Sq.ft. )18
None Booked0% Booked
0% Booked
1 BHK28.91 Sq.mts. ( 311 Sq.ft. )17
None Booked0% Booked
0% Booked
1 BHK39.11 Sq.mts. ( 421 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK60.79 Sq.mts. ( 654 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK54.2 Sq.mts. ( 583 Sq.ft. )18
13 Booked72% Booked
72% Booked
2 BHK55.89 Sq.mts. ( 602 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK59.78 Sq.mts. ( 643 Sq.ft. )15
14 Booked93% Booked
93% Booked
Balwadi29.15 Sq.mts. ( 314 Sq.ft. )1
None Booked0% Booked
0% Booked
Comm. Hall.39.57 Sq.mts. ( 426 Sq.ft. )1
None Booked0% Booked
0% Booked
Exi Balwadi60.18 Sq.mts. ( 648 Sq.ft. )1
None Booked0% Booked
0% Booked
Library28.25 Sq.mts. ( 304 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space86.43 Sq.mts. ( 930 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space86.9 Sq.mts. ( 935 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space59.78 Sq.mts. ( 643 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop7.21 Sq.mts. ( 78 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.64 Sq.mts. ( 158 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.41 Sq.mts. ( 198 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.71 Sq.mts. ( 201 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.22 Sq.mts. ( 207 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop19.83 Sq.mts. ( 213 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22 Sq.mts. ( 237 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.64 Sq.mts. ( 276 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.26 Sq.mts. ( 293 Sq.ft. )1
1 Booked100% Booked
100% Booked
Society Office23.11 Sq.mts. ( 249 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Office20.63 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
Welfare C.28.25 Sq.mts. ( 304 Sq.ft. )1
None Booked0% Booked
0% Booked
Women. En.29.05 Sq.mts. ( 313 Sq.ft. )1
None Booked0% Booked
0% Booked
111 total apartments / 36 apartments booked. 32% apartments booked.
Work Description in Building Shubh ParshwaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress42% done
42% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress64% done
64% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress64% done
64% Booked
Stilt Floor
work-in-progress40% done
40% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
S. Siddharth Construction Co. (Panchshil)
for Project
Shubh Parshwa
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation