Project overview

Shubh Nisarg is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700013375. Shubh Nisarg is located at S No 9 H No 5 6 7. This is a New being developed by Vardhaman And Vastu Associates.

Shubh Nisarg has 1 BHK & 2 BHK Apartments with carpet areas ranging from 296 to 340 Sq.ft. Carpet. The Project has total 167 of which 0 are currently available for sale.

Shubh Nisarg is being developed on a total land area of 61355 Sq.ft. Shubh Nisarg has 7 Wings / Towers A Wing,B Wing,C Wing,D Wing,E Wing,F Wing,G Wing

ProjectDeveloperLocationPossession
Manohar Vikas Shreeji Paraiso Phase - 2Deeplaxmi DevelopersS. No. 60, H.No.5 Pt,6 Pt, S. No.61,H. No.1 Part,S. No. 9130-03-2029 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Sairaj Avenue Wing BVirendra Atmaram SalunkheS No 97B, Hissa No 5/3, Plot No 4431-05-2024 00:00:00
Samarth ParadiseS P DevelopersS No 21 H No 1331-12-2026 00:00:00
Shreeji MilestoneDeep Laxmi AssociatesSurvey No. 48, Plot No. 0130-06-2029 00:00:00
Riddhi SiddhiShreeji & Innovative DevelopersPlot No 6 And 9, Survey No 105 - A, Hissa No 131-12-2018 00:00:00
Shubh NisargVardhaman And Vastu AssociatesS No 9 H No 5 6 720-12-2021 00:00:00
Vastu ShilpVastu HomesS No 105A Hissa No 4231-03-2018 00:00:00
Viraj IconicBonzer OrbitGut No.53/5, Plot No.1, Gut No.53/6,Plot No.2, Gut No.53/731-12-2026 00:00:00
Shiv SarovarMahesh Bharat Divnale95 /1/ V01-05-2025 00:00:00
Shreeji GreensDeep Laxmi AssociatesS No 70 H No 6A S No 70 H No 6B S No 73 H No 2 S No 73 H No 531-07-2026 00:00:00
Siddharth ApartmentRohan Gruh NirmanS No 40 And H No 331-03-2018 00:00:00
Om Shrinivas ApartmentShriniwas DevelopersSurvey No 9 Hissa No 4A Plot No 531-03-2018 00:00:00
Maruti AsthaMaruti HomesSurvey No 97B,Hissa No. 7, Plot No. 531-12-2017 00:00:00
Rachana HeightsReshma Vikas Bambulkar482109-06-2019 00:00:00
Saurabh ArcadeM/S Krishna Builders & DevelopersS No 7A H No 4A Plot No 1 230-12-2021 00:00:00
Maruti MeadowsVasani EnterprisesNa, Thane, 42150330-12-2020 00:00:00
Project Details
  • Project:
    Shubh Nisarg
  • Location:
  • S No 9 H No 5 6 7
  • Const. Stage:
    New
  • Possession:
    20 Dec 2021
Developer Details

  • Developer:
    Vardhaman And Vastu Associates
  • Phone:
  • Address:
  • Ambardhara Ii
Project RERA Details
MAHA REARA No: P51700013375
Project Type Residential / Group Housing
RERA Project Status New
Architect Architect Inc
Funding Bank HDFC BANK
Proposed Possession 20 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 26 Sep 2017
Last Retrived 26 Jul 2025
Shubh Nisarg QR Code
Shubh Nisarg
MahaRERA - P51700013375
Apartment Details & Configuration
TypeArea
1 BHK29.32 Sq.mts. ( 316 Sq.ft. )
2 BHK38.13 Sq.mts. ( 410 Sq.ft. )
2 BHK44.44 Sq.mts. ( 478 Sq.ft. )
1 BHK29.74 Sq.mts. ( 320 Sq.ft. )
1 BHK29.86 Sq.mts. ( 321 Sq.ft. )
1 BHK31.21 Sq.mts. ( 336 Sq.ft. )
1 BHK31.49 Sq.mts. ( 339 Sq.ft. )
1 BHK25.35 Sq.mts. ( 273 Sq.ft. )
1 BHK26.88 Sq.mts. ( 289 Sq.ft. )
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )
1 BHK23.98 Sq.mts. ( 258 Sq.ft. )
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )
1 BHK27.75 Sq.mts. ( 299 Sq.ft. )
1 BHK27.8 Sq.mts. ( 299 Sq.ft. )
1 BHK28.03 Sq.mts. ( 302 Sq.ft. )
1 RK17.54 Sq.mts. ( 189 Sq.ft. )
1 BHK21.72 Sq.mts. ( 234 Sq.ft. )
1 BHK27.13 Sq.mts. ( 292 Sq.ft. )
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )
2 BHK34.99 Sq.mts. ( 377 Sq.ft. )
2 BHK36.07 Sq.mts. ( 388 Sq.ft. )
2 BHK36.52 Sq.mts. ( 393 Sq.ft. )
2 BHK37.33 Sq.mts. ( 402 Sq.ft. )
2 BHK37.53 Sq.mts. ( 404 Sq.ft. )
1 BHK25.32 Sq.mts. ( 273 Sq.ft. )
1 BHK25.39 Sq.mts. ( 273 Sq.ft. )
1 BHK26.01 Sq.mts. ( 280 Sq.ft. )
1 BHK26.08 Sq.mts. ( 281 Sq.ft. )
1 BHK27.6 Sq.mts. ( 297 Sq.ft. )
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )
1 BHK28.44 Sq.mts. ( 306 Sq.ft. )
1 BHK28.82 Sq.mts. ( 310 Sq.ft. )
2 BHK36.82 Sq.mts. ( 396 Sq.ft. )
2 BHK37.97 Sq.mts. ( 409 Sq.ft. )
2 BHK39.9 Sq.mts. ( 429 Sq.ft. )
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )
1 BHK28.05 Sq.mts. ( 302 Sq.ft. )
1 BHK28.17 Sq.mts. ( 303 Sq.ft. )
2 BHK31.55 Sq.mts. ( 340 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shubh Nisarglast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
0
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Drain
Solid Waste Management And Disposal
Disposal Through Municipal Systems
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Municipal Drainage System
Water Conservation, Rain water Harvesting
0
Water Supply
Water Pipe Line
Buildings / Wings in Shubh Nisarg
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shubh Nisarg by Vardhaman And Vastu Associateslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

61355 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

167 apartments in total
Total
167
Booked
167
Available
0

Saleable Area Statistics (Sq. ft.)

56966 Total
Total
56966
Booked
56966
Available
0
Total 167 apartments in project. 167 apartments booked. 100% apartments booked.
Total 56966 Sq.ft. saleable area. 56966 saleable area booked.
100% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20208101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.32 Sq.mts. ( 316 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK38.13 Sq.mts. ( 410 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK44.44 Sq.mts. ( 478 Sq.ft. )14
14 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20208101008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.74 Sq.mts. ( 320 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK29.86 Sq.mts. ( 321 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.21 Sq.mts. ( 336 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.49 Sq.mts. ( 339 Sq.ft. )7
7 Booked100% Booked
100% Booked
28 total apartments / 28 apartments booked. 100% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20205101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.35 Sq.mts. ( 273 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.88 Sq.mts. ( 289 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK27.73 Sq.mts. ( 298 Sq.ft. )4
4 Booked100% Booked
100% Booked
16 total apartments / 16 apartments booked. 100% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20205100001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.98 Sq.mts. ( 258 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK27.75 Sq.mts. ( 299 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK27.8 Sq.mts. ( 299 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK28.03 Sq.mts. ( 302 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 RK17.54 Sq.mts. ( 189 Sq.ft. )1
1 Booked100% Booked
100% Booked
18 total apartments / 18 apartments booked. 100% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingDec 20205100001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK21.72 Sq.mts. ( 234 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK27.13 Sq.mts. ( 292 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK28.13 Sq.mts. ( 303 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK34.99 Sq.mts. ( 377 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK36.07 Sq.mts. ( 388 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK36.52 Sq.mts. ( 393 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK37.33 Sq.mts. ( 402 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK37.53 Sq.mts. ( 404 Sq.ft. )8
8 Booked100% Booked
100% Booked
29 total apartments / 29 apartments booked. 100% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingDec 20205100001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.32 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK25.39 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK26.01 Sq.mts. ( 280 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK26.08 Sq.mts. ( 281 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK27.6 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK27.87 Sq.mts. ( 300 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK28.44 Sq.mts. ( 306 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK28.82 Sq.mts. ( 310 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK36.82 Sq.mts. ( 396 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK37.97 Sq.mts. ( 409 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK39.9 Sq.mts. ( 429 Sq.ft. )4
4 Booked100% Booked
100% Booked
29 total apartments / 29 apartments booked. 100% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingDec 20205100001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.49 Sq.mts. ( 296 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK28.05 Sq.mts. ( 302 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK28.17 Sq.mts. ( 303 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK31.55 Sq.mts. ( 340 Sq.ft. )4
4 Booked100% Booked
100% Booked
19 total apartments / 19 apartments booked. 100% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Vardhaman And Vastu Associates
for Project
Shubh Nisarg
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation