Project overview

Shubh Mangalam Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700031529. Shubh Mangalam Phase I is located at Sr No 106Hsn1. This is a New being developed by Shubh Reality.

Shubh Mangalam Phase I has 1 BHK & 2 BHK Apartments with carpet areas ranging from 422 to 526 Sq.ft. Carpet. The Project has total 84 of which 24 are currently available for sale.

Shubh Mangalam Phase I is being developed on a total land area of 51710 Sq.ft. Shubh Mangalam Phase I has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shubh Mangalam Phase I
  • Location:
  • Sr No 106Hsn1
  • Const. Stage:
    New
  • Possession:
    13 Aug 2024
Developer Details

  • Developer:
    Shubh Reality
  • Phone:
  • Address:
  • Amber Dhara Ii
Project RERA Details
MAHA REARA No: P51700031529
Project Type Residential / Group Housing
RERA Project Status New
Architect Raj & Associates
Funding Bank HDFC BANK
Proposed Possession 13 Aug 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 25 Oct 2021
Last Retrived 26 Jul 2025
Shubh Mangalam Phase I QR Code
Shubh Mangalam Phase I
MahaRERA - P51700031529
Apartment Details & Configuration
TypeArea
1 BHK39.16 Sq.mts. ( 422 Sq.ft. )
1 BHK40.8 Sq.mts. ( 439 Sq.ft. )
2 BHK52.66 Sq.mts. ( 567 Sq.ft. )
2 BHK53.39 Sq.mts. ( 575 Sq.ft. )
1 BHK41.02 Sq.mts. ( 442 Sq.ft. )
2 BHK48.7 Sq.mts. ( 524 Sq.ft. )
2 BHK48.84 Sq.mts. ( 526 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shubh Mangalam Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Space To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Tree Planting Will Done In Due Course
Open Parking
Work Not Yet Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Sewage
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvewsting Is To Be Provided
Water Supply
Mjp Will Provide Water Connection After Oc
Buildings / Wings in Shubh Mangalam Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shubh Mangalam Phase I by Shubh Realitylast updated on 26 Jul 2025 as per information obtained from MARA RERA.

51710 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

84 apartments in total
Total
84
Booked
60
Available
24

Saleable Area Statistics (Sq. ft.)

39209 Total
Total
39209
Booked
28831
Available
10378
Total 84 apartments in project. 60 apartments booked. 71% apartments booked.
Total 39209 Sq.ft. saleable area. 28831 saleable area booked.
74% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AAug 202481010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.16 Sq.mts. ( 422 Sq.ft. )14
10 Booked71% Booked
71% Booked
1 BHK40.8 Sq.mts. ( 439 Sq.ft. )7
2 Booked28% Booked
28% Booked
2 BHK52.66 Sq.mts. ( 567 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK53.39 Sq.mts. ( 575 Sq.ft. )7
6 Booked85% Booked
85% Booked
35 total apartments / 25 apartments booked. 71% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BAug 202481010017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.16 Sq.mts. ( 422 Sq.ft. )28
15 Booked53% Booked
53% Booked
1 BHK41.02 Sq.mts. ( 442 Sq.ft. )7
6 Booked85% Booked
85% Booked
2 BHK48.7 Sq.mts. ( 524 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK48.84 Sq.mts. ( 526 Sq.ft. )7
7 Booked100% Booked
100% Booked
49 total apartments / 35 apartments booked. 71% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked
Channel Partners
Channel Partners Registered by Developer
Shubh Reality
for Project
Shubh Mangalam Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation