Project overview

Shubh Aarambh is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012478. Shubh Aarambh is located at 105A, 3P, 8. This is a Ongoing being developed by Pacific Construction & Developers.

Shubh Aarambh has 1 BHK & 1RK Apartments with carpet areas ranging from 3006 to 6015 Sq.ft. Carpet. The Project has total 20 of which 14 are currently available for sale.

Shubh Aarambh is being developed on a total land area of 5265 Sq.ft. Shubh Aarambh has 1 Wings / Towers Shubh Aarambh

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
AlankapuriAshish Waman GoleS.No 17/H.No 1 & H.No 8/Plot No. 101-05-2027 00:00:00
Shrihari Chandan ApartmentAbhishek Shelters LimitedCts No 1269, 127031-03-2028 00:00:00
Shivshakti PrimeShivshakti BuildconSurvey No-53 Hissa No- 4/130-09-2027 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Project Details
  • Project:
    Shubh Aarambh
  • Location:
  • 105A, 3P, 8
  • Const. Stage:
    Ongoing
  • Possession:
    30 Apr 2018
Developer Details

  • Developer:
    Pacific Construction & Developers
  • Phone:
  • Address:
  • Hissa No.3, Plot No.8
Project RERA Details
MAHA REARA No: P51700012478
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Arc Designers
Funding Bank
Proposed Possession 30 Apr 2018
Revised Possession 30 Apr 2018
Extended Possession
Litigations No Litigations
Last Modified 01 Sep 2017
Last Retrived 26 Jul 2025
Shubh Aarambh QR Code
Shubh Aarambh
MahaRERA - P51700012478
Apartment Details & Configuration
TypeArea
1 BHK558.78 Sq.mts. ( 6015 Sq.ft. )
1RK279.3 Sq.mts. ( 3006 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shubh Aarambhlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room Yet Not Started
Energy management
-
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking25% completed
25% Complete
As Per Plan
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
-
Water Supply100% completed
95% Complete
Borewell
Buildings / Wings in Shubh Aarambh
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shubh Aarambh by Pacific Construction & Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5265 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

20 apartments in total
Total
20
Booked
6
Available
14

Saleable Area Statistics (Sq. ft.)

96228 Total
Total
96228
Booked
27063
Available
69164
Total 20 apartments in project. 6 apartments booked. 30% apartments booked.
Total 96228 Sq.ft. saleable area. 27063 saleable area booked.
28% area booked.

Shubh Aarambh

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shubh AarambhJan 19005100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK558.78 Sq.mts. ( 6015 Sq.ft. )12
3 Booked25% Booked
25% Booked
1RK279.3 Sq.mts. ( 3006 Sq.ft. )8
3 Booked37% Booked
37% Booked
20 total apartments / 6 apartments booked. 30% apartments booked.
Work Description in Building Shubh AarambhCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pacific Construction & Developers
for Project
Shubh Aarambh
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation