Project overview

Shuban Society is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003453. Shuban Society is located at 119 Hissa No. Part Old Survey No.177B. This is a Ongoing being developed by Shrikrishna Marathe.

Shuban Society has 1 BHK & 2 BHK Apartments with carpet areas ranging from 510 to 714 Sq.ft. Carpet. The Project has total 14 of which 4 are currently available for sale.

Shuban Society is being developed on a total land area of 5760 Sq.ft. Shuban Society has 1 Wings / Towers Shuban

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shuban Society
  • Location:
  • 119 Hissa No. Part Old Survey No.177B
  • Const. Stage:
    Ongoing
  • Possession:
    28 Feb 2019
Developer Details

  • Developer:
    Shrikrishna Marathe
  • Phone:
  • Address:
  • Sushila
Project RERA Details
MAHA REARA No: P51700003453
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ankur Shetye
Funding Bank INDIAN OVERSEAS BANK
Proposed Possession 28 Feb 2019
Revised Possession 28 Feb 2019
Extended Possession
Litigations No Litigations
Last Modified 05 Aug 2017
Last Retrived 26 Jul 2025
Shuban Society QR Code
Shuban Society
MahaRERA - P51700003453
Apartment Details & Configuration
TypeArea
1 BHK47.34 Sq.mts. ( 510 Sq.ft. )
1 BHK55.66 Sq.mts. ( 599 Sq.ft. )
2 BHK57.66 Sq.mts. ( 621 Sq.ft. )
2 BHK66.32 Sq.mts. ( 714 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shuban Societylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Norms
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Rnorms
Energy management
Rain Water Harvesting Pit
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Sewage
Solid Waste Management And Disposal
Na
Storm Water Drains
Cahmber To Kdmc Line
Street Lighting
On Completion
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Municipal Water Supply
Buildings / Wings in Shuban Society
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shuban Society by Shrikrishna Marathelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5760 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

14 apartments in total
Total
14
Booked
10
Available
4

Saleable Area Statistics (Sq. ft.)

9005 Total
Total
9005
Booked
6447
Available
2558
Total 14 apartments in project. 10 apartments booked. 71% apartments booked.
Total 9005 Sq.ft. saleable area. 6447 saleable area booked.
72% area booked.

Shuban

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShubanJan 19006101041
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.34 Sq.mts. ( 510 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK55.66 Sq.mts. ( 599 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK57.66 Sq.mts. ( 621 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK66.32 Sq.mts. ( 714 Sq.ft. )6
4 Booked66% Booked
66% Booked
14 total apartments / 10 apartments booked. 71% apartments booked.
Work Description in Building ShubanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress40% done
40% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress54% done
54% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shrikrishna Marathe
for Project
Shuban Society
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation