Project overview

Shreeji Square Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700029512. Shreeji Square Phase I is located at Survey No 76 Hissa No 1/2/A And Survey No 119 Hissa No 1/A. This is a New being developed by Shreeji Developers.

Shreeji Square Phase I has 1 BHK Apartments with carpet areas ranging from 248 to 326 Sq.ft. Carpet. The Project has total 425 of which 305 are currently available for sale.

Shreeji Square Phase I is being developed on a total land area of 57340 Sq.ft. out of which 5734 Sq.ft. i.e 10% is reserved for recreational purposes. Shreeji Square Phase I has 5 Wings / Towers Building A,Building B,Building C,Building D,Building E

ProjectDeveloperLocationPossession
Atmiya HeightsAkshar GroupGat No 76130-12-2025 00:00:00
Shreeji Nisarg Phase IShreeji DevelopersPlot No 1 Part, Survey No 119/1C, 119/2B30-12-2022 00:00:00
Trishul Golden VilleA Plus Life SpaceS.No. 87/2/B/1, S.No. 87/2/D, S.No. 87/2/K/226-12-2022 00:00:00
Jewel HeightsJewel Builders And Infraprojects LtdPlot No 2 Of Gut No 25 Hissa No 1A, 1B30-12-2023 00:00:00
Project Details
  • Project:
    Shreeji Square Phase I
  • Location:
  • Survey No 76 Hissa No 1/2/A And Survey No 119 Hissa No 1/A
  • Const. Stage:
    New
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Shreeji Developers
  • Phone:
  • Address:
  • Shreeji Center
Project RERA Details
MAHA REARA No: P51700029512
Project Type Residential / Group Housing
RERA Project Status New
Architect Urban Architects
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 04 Jun 2021
Last Retrived 26 Jul 2025
Shreeji Square Phase I QR Code
Shreeji Square Phase I
MahaRERA - P51700029512
Apartment Details & Configuration
TypeArea
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )
1 BHK35.46 Sq.mts. ( 382 Sq.ft. )
2 BHK41.47 Sq.mts. ( 446 Sq.ft. )
2 BHK42.26 Sq.mts. ( 455 Sq.ft. )
2 BHK44.03 Sq.mts. ( 474 Sq.ft. )
2 BHK45.73 Sq.mts. ( 492 Sq.ft. )
Shop16.83 Sq.mts. ( 181 Sq.ft. )
Shop16.92 Sq.mts. ( 182 Sq.ft. )
Shop17.22 Sq.mts. ( 185 Sq.ft. )
Shop21.41 Sq.mts. ( 230 Sq.ft. )
Shop23.42 Sq.mts. ( 252 Sq.ft. )
Shop25.16 Sq.mts. ( 271 Sq.ft. )
Shop28.4 Sq.mts. ( 306 Sq.ft. )
1 BHK27.96 Sq.mts. ( 301 Sq.ft. )
1 BHK28.94 Sq.mts. ( 312 Sq.ft. )
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )
1 BHK29.85 Sq.mts. ( 321 Sq.ft. )
1 BHK29.87 Sq.mts. ( 322 Sq.ft. )
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )
1 BHK31.1 Sq.mts. ( 335 Sq.ft. )
1RK22.83 Sq.mts. ( 246 Sq.ft. )
1 BHK29.39 Sq.mts. ( 316 Sq.ft. )
1 BHK29.53 Sq.mts. ( 318 Sq.ft. )
2 BHK42.69 Sq.mts. ( 460 Sq.ft. )
1 BHK28.34 Sq.mts. ( 305 Sq.ft. )
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )
1 BHK29.75 Sq.mts. ( 320 Sq.ft. )
1RK21.09 Sq.mts. ( 227 Sq.ft. )
1RK26.26 Sq.mts. ( 283 Sq.ft. )
1 BHK23.08 Sq.mts. ( 248 Sq.ft. )
1 BHK23.15 Sq.mts. ( 249 Sq.ft. )
1 BHK23.4 Sq.mts. ( 252 Sq.ft. )
1 BHK23.63 Sq.mts. ( 254 Sq.ft. )
1 BHK24.84 Sq.mts. ( 267 Sq.ft. )
1 BHK29.62 Sq.mts. ( 319 Sq.ft. )
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shreeji Square Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Provided
Community Buildings
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Will Be Provided
Landscaping & Tree Planting
Will Be Provided
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Provided
Water Supply
Will Be Provided
Buildings / Wings in Shreeji Square Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shreeji Square Phase I by Shreeji Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

57340 Sq. ft.

Project Area

5734 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

425 apartments in total
Total
425
Booked
120
Available
305

Saleable Area Statistics (Sq. ft.)

142068 Total
Total
142068
Booked
35903
Available
106166
Total 425 apartments in project. 120 apartments booked. 28% apartments booked.
Total 142068 Sq.ft. saleable area. 35903 saleable area booked.
25% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building AJun 202612101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.8 Sq.mts. ( 321 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK35.46 Sq.mts. ( 382 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.47 Sq.mts. ( 446 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK42.26 Sq.mts. ( 455 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK44.03 Sq.mts. ( 474 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK45.73 Sq.mts. ( 492 Sq.ft. )11
None Booked0% Booked
0% Booked
Shop16.83 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.92 Sq.mts. ( 182 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.22 Sq.mts. ( 185 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.41 Sq.mts. ( 230 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop23.42 Sq.mts. ( 252 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop25.16 Sq.mts. ( 271 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop28.4 Sq.mts. ( 306 Sq.ft. )1
None Booked0% Booked
0% Booked
64 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BJun 202612101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.96 Sq.mts. ( 301 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK28.94 Sq.mts. ( 312 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK29.85 Sq.mts. ( 321 Sq.ft. )20
None Booked0% Booked
0% Booked
1 BHK29.87 Sq.mts. ( 322 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK30.7 Sq.mts. ( 330 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK31.1 Sq.mts. ( 335 Sq.ft. )11
None Booked0% Booked
0% Booked
1RK22.83 Sq.mts. ( 246 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK42.26 Sq.mts. ( 455 Sq.ft. )11
None Booked0% Booked
0% Booked
110 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

Building C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building CJun 202612101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.96 Sq.mts. ( 301 Sq.ft. )11
1 BHK28.94 Sq.mts. ( 312 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK29.39 Sq.mts. ( 316 Sq.ft. )22
7 Booked31% Booked
31% Booked
1 BHK29.53 Sq.mts. ( 318 Sq.ft. )22
1 BHK29.87 Sq.mts. ( 322 Sq.ft. )20
None Booked0% Booked
0% Booked
1RK22.83 Sq.mts. ( 246 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK42.69 Sq.mts. ( 460 Sq.ft. )22
110 total apartments / 11 apartments booked. 10% apartments booked.
Work Description in Building Building CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building DJun 202612101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.34 Sq.mts. ( 305 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK29.6 Sq.mts. ( 319 Sq.ft. )22
13 Booked59% Booked
59% Booked
1 BHK29.75 Sq.mts. ( 320 Sq.ft. )22
13 Booked59% Booked
59% Booked
1 BHK29.87 Sq.mts. ( 322 Sq.ft. )24
24 Booked100% Booked
100% Booked
1RK21.09 Sq.mts. ( 227 Sq.ft. )12
7 Booked58% Booked
58% Booked
1RK26.26 Sq.mts. ( 283 Sq.ft. )32
26 Booked81% Booked
81% Booked
123 total apartments / 94 apartments booked. 76% apartments booked.
Work Description in Building Building DCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building EJun 20265101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.08 Sq.mts. ( 248 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK23.15 Sq.mts. ( 249 Sq.ft. )4
4 Booked100% Booked
100% Booked
1 BHK23.4 Sq.mts. ( 252 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK23.63 Sq.mts. ( 254 Sq.ft. )6
4 Booked66% Booked
66% Booked
1 BHK24.84 Sq.mts. ( 267 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK29.62 Sq.mts. ( 319 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK30.24 Sq.mts. ( 326 Sq.ft. )2
1 Booked50% Booked
50% Booked
18 total apartments / 15 apartments booked. 83% apartments booked.
Work Description in Building Building ECompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shreeji Developers
for Project
Shreeji Square Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation