Project overview

Shreeji Nisarg Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015127. Shreeji Nisarg Phase I is located at Plot No 1 Part, Survey No 119/1C, 119/2B. This is a New being developed by Shreeji Developers.

Shreeji Nisarg Phase I has 1 BHK & 1RK Apartments with carpet areas ranging from 198 to 282 Sq.ft. Carpet. The Project has total 318 of which 163 are currently available for sale.

Shreeji Nisarg Phase I is being developed on a total land area of 84454 Sq.ft. out of which 8450 Sq.ft. i.e 10% is reserved for recreational purposes. Shreeji Nisarg Phase I has 5 Wings / Towers 1,2,4,5,6

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shreeji Nisarg Phase I
  • Location:
  • Plot No 1 Part, Survey No 119/1C, 119/2B
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Shreeji Developers
  • Phone:
  • Address:
  • Shreeji Center
Project RERA Details
MAHA REARA No: P51700015127
Project Type Others
RERA Project Status New
Architect Urban Vastu Designer
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 31 Jan 2018
Last Retrived 26 Jul 2025
Shreeji Nisarg Phase I QR Code
Shreeji Nisarg Phase I
MahaRERA - P51700015127
Apartment Details & Configuration
TypeArea
1 BHK24.3 Sq.mts. ( 262 Sq.ft. )
1 BHK25.74 Sq.mts. ( 277 Sq.ft. )
1 BHK23.85 Sq.mts. ( 257 Sq.ft. )
Shop24.15 Sq.mts. ( 260 Sq.ft. )
Shop26.52 Sq.mts. ( 285 Sq.ft. )
Shop12.63 Sq.mts. ( 136 Sq.ft. )
Shop14.82 Sq.mts. ( 160 Sq.ft. )
Shop16.71 Sq.mts. ( 180 Sq.ft. )
Shop18.49 Sq.mts. ( 199 Sq.ft. )
1 BHK23.49 Sq.mts. ( 253 Sq.ft. )
2 BHK38.81 Sq.mts. ( 418 Sq.ft. )
SHOP28.36 Sq.mts. ( 305 Sq.ft. )
SHOP28.68 Sq.mts. ( 309 Sq.ft. )
SHOP30.17 Sq.mts. ( 325 Sq.ft. )
SHOP30.97 Sq.mts. ( 333 Sq.ft. )
SHOP10.65 Sq.mts. ( 115 Sq.ft. )
SHOP13.84 Sq.mts. ( 149 Sq.ft. )
SHOP13.87 Sq.mts. ( 149 Sq.ft. )
SHOP15.67 Sq.mts. ( 169 Sq.ft. )
SHOP20.01 Sq.mts. ( 215 Sq.ft. )
SHOP22.09 Sq.mts. ( 238 Sq.ft. )
1 BHK24.89 Sq.mts. ( 268 Sq.ft. )
1 BHK25.7 Sq.mts. ( 277 Sq.ft. )
1 BHK26.78 Sq.mts. ( 288 Sq.ft. )
2 BHK34.9 Sq.mts. ( 376 Sq.ft. )
2 BHK39.71 Sq.mts. ( 427 Sq.ft. )
1 BHK24.87 Sq.mts. ( 268 Sq.ft. )
1 BHK25.41 Sq.mts. ( 274 Sq.ft. )
1RK19.97 Sq.mts. ( 215 Sq.ft. )
1 BHK23.08 Sq.mts. ( 248 Sq.ft. )
1 BHK26.19 Sq.mts. ( 282 Sq.ft. )
1 BHK26.22 Sq.mts. ( 282 Sq.ft. )
1RK18.35 Sq.mts. ( 198 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shreeji Nisarg Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Yet To Be Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Be Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Be Started
Landscaping & Tree Planting
Yet To Be Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Not Proposed. Only Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Be Started
Water Supply
Yet To Be Started
Buildings / Wings in Shreeji Nisarg Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shreeji Nisarg Phase I by Shreeji Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

84454 Sq. ft.

Project Area

8450 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

318 apartments in total
Total
318
Booked
155
Available
163

Saleable Area Statistics (Sq. ft.)

88483 Total
Total
88483
Booked
41821
Available
46663
Total 318 apartments in project. 155 apartments booked. 48% apartments booked.
Total 88483 Sq.ft. saleable area. 41821 saleable area booked.
47% area booked.

1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1Mar 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.3 Sq.mts. ( 262 Sq.ft. )42
26 Booked61% Booked
61% Booked
1 BHK25.74 Sq.mts. ( 277 Sq.ft. )15
9 Booked60% Booked
60% Booked
1 BHK23.85 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop24.15 Sq.mts. ( 260 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop26.52 Sq.mts. ( 285 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.63 Sq.mts. ( 136 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop14.82 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.71 Sq.mts. ( 180 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop18.49 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
70 total apartments / 36 apartments booked. 51% apartments booked.
Work Description in Building 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
2Dec 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.49 Sq.mts. ( 253 Sq.ft. )14
3 Booked21% Booked
21% Booked
1 BHK23.85 Sq.mts. ( 257 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK38.81 Sq.mts. ( 418 Sq.ft. )28
6 Booked21% Booked
21% Booked
SHOP28.36 Sq.mts. ( 305 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP28.68 Sq.mts. ( 309 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP30.17 Sq.mts. ( 325 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP30.97 Sq.mts. ( 333 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.65 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.84 Sq.mts. ( 149 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.87 Sq.mts. ( 149 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.67 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.01 Sq.mts. ( 215 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.09 Sq.mts. ( 238 Sq.ft. )1
None Booked0% Booked
0% Booked
53 total apartments / 10 apartments booked. 18% apartments booked.
Work Description in Building 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
4Dec 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.85 Sq.mts. ( 257 Sq.ft. )3
2 Booked66% Booked
66% Booked
1 BHK24.3 Sq.mts. ( 262 Sq.ft. )21
7 Booked33% Booked
33% Booked
1 BHK24.89 Sq.mts. ( 268 Sq.ft. )15
10 Booked66% Booked
66% Booked
1 BHK25.7 Sq.mts. ( 277 Sq.ft. )7
2 Booked28% Booked
28% Booked
1 BHK25.74 Sq.mts. ( 277 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.78 Sq.mts. ( 288 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK34.9 Sq.mts. ( 376 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK39.71 Sq.mts. ( 427 Sq.ft. )16
5 Booked31% Booked
31% Booked
71 total apartments / 31 apartments booked. 43% apartments booked.
Work Description in Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
5Dec 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK24.87 Sq.mts. ( 268 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK25.41 Sq.mts. ( 274 Sq.ft. )14
6 Booked42% Booked
42% Booked
1RK19.97 Sq.mts. ( 215 Sq.ft. )15
10 Booked66% Booked
66% Booked
31 total apartments / 17 apartments booked. 54% apartments booked.
Work Description in Building 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
6Mar 20208101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.08 Sq.mts. ( 248 Sq.ft. )14
9 Booked64% Booked
64% Booked
1 BHK23.85 Sq.mts. ( 257 Sq.ft. )5
3 Booked60% Booked
60% Booked
1 BHK24.3 Sq.mts. ( 262 Sq.ft. )28
17 Booked60% Booked
60% Booked
1 BHK26.19 Sq.mts. ( 282 Sq.ft. )14
12 Booked85% Booked
85% Booked
1 BHK26.22 Sq.mts. ( 282 Sq.ft. )2
1 Booked50% Booked
50% Booked
1RK18.35 Sq.mts. ( 198 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK19.97 Sq.mts. ( 215 Sq.ft. )29
18 Booked62% Booked
62% Booked
93 total apartments / 61 apartments booked. 65% apartments booked.
Work Description in Building 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shreeji Developers
for Project
Shreeji Nisarg Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation