Project overview

Shreeji Iconic is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700052990. Shreeji Iconic is located at Sr No 137B And Sr No 9 H No 10. This is a New being developed by Raj Laxmi Developers.

Shreeji Iconic has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 203 to 477 Sq.ft. Carpet. The Project has total 161 of which 161 are currently available for sale.

Shreeji Iconic is being developed on a total land area of 26716 Sq.ft. Shreeji Iconic has 2 Wings / Towers Building A,Building B

ProjectDeveloperLocationPossession
Jeevan LifestylesJeevan EnterprisesS N 148 / 13/1531-03-2019 00:00:00
Marathon Nagari Nx Vigo DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.30-06-2019 00:00:00
Marathon Nagari Nx Vitoria DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.31-12-2019 00:00:00
Shreeji Iconic Phase IRaj Laxmi Developers137B, 148 Hn1 And 2B, 145 Hn 130-05-2022 00:00:00
Rachana HeightsReshma Vikas Bambulkar482109-06-2019 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
Ved HeightsOm RealityS.No. 96, H. No. 231-12-2026 00:00:00
Ram RiveraS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
Park One Phase IiShree Laxmi EnterprisesSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
Padmaprabha Co Op Hsg SocietyShree Mahaveer EnterprisesSurvey No 46 Plot No 23 24 H No 6A9 6A10 P30-04-2018 00:00:00
Panvelkar OptimaVarad Vinayak DevelopersSurvey No 16 Hissa No 330-09-2020 00:00:00
Kalp NisargBls Ventures81/3A 3B30-03-2022 00:00:00
Aryan One Wing I And JKonark Lifespaces701,702,711,751,752,753,755,761,762,763,77,783,799,791031-10-2018 00:00:00
Project Details
  • Project:
    Shreeji Iconic
  • Location:
  • Sr No 137B And Sr No 9 H No 10
  • Const. Stage:
    New
  • Possession:
    31 Dec 2028
Developer Details

  • Developer:
    Raj Laxmi Developers
  • Phone:
  • Address:
  • Shreeji Iconic
Project RERA Details
MAHA REARA No: P51700052990
Project Type Residential / Group Housing
RERA Project Status New
Architect Urban Architects
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Oct 2023
Last Retrived 26 Jul 2025
Shreeji Iconic QR Code
Shreeji Iconic
MahaRERA - P51700052990
Apartment Details & Configuration
TypeArea
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )
1 BHK31.4 Sq.mts. ( 338 Sq.ft. )
1 BHK36.85 Sq.mts. ( 397 Sq.ft. )
2 BHK44.95 Sq.mts. ( 484 Sq.ft. )
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )
Shop12.1 Sq.mts. ( 130 Sq.ft. )
Shop12.71 Sq.mts. ( 137 Sq.ft. )
Shop14.47 Sq.mts. ( 156 Sq.ft. )
Shop15.79 Sq.mts. ( 170 Sq.ft. )
Shop16.14 Sq.mts. ( 174 Sq.ft. )
Shop18.91 Sq.mts. ( 204 Sq.ft. )
Shop19.26 Sq.mts. ( 207 Sq.ft. )
Shop25.84 Sq.mts. ( 278 Sq.ft. )
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )
1 BHK30.74 Sq.mts. ( 331 Sq.ft. )
1RK18.84 Sq.mts. ( 203 Sq.ft. )
2 BHK37.41 Sq.mts. ( 403 Sq.ft. )
2 BHK38.74 Sq.mts. ( 417 Sq.ft. )
2 BHK39.83 Sq.mts. ( 429 Sq.ft. )
2 BHK44.29 Sq.mts. ( 477 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shreeji Iconiclast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided.
Energy management
Na
Fire Protection And Fire Safety Requirements
Will Be Provided
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Not Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Be Provided
Street Lighting
Will Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Will Be Provided
Buildings / Wings in Shreeji Iconic
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shreeji Iconic by Raj Laxmi Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

26716 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

161 apartments in total
Total
161
Booked
0
Available
161

Saleable Area Statistics (Sq. ft.)

62402 Total
Total
62402
Booked
0
Available
62402
Total 161 apartments in project. 0 apartments booked. 0% apartments booked.
Total 62402 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building ADec 202811101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )10
None Booked0% Booked
0% Booked
1 BHK31.4 Sq.mts. ( 338 Sq.ft. )11
None Booked0% Booked
0% Booked
1 BHK36.85 Sq.mts. ( 397 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK44.95 Sq.mts. ( 484 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK44.97 Sq.mts. ( 484 Sq.ft. )11
None Booked0% Booked
0% Booked
Shop12.1 Sq.mts. ( 130 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.71 Sq.mts. ( 137 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.47 Sq.mts. ( 156 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop15.79 Sq.mts. ( 170 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.14 Sq.mts. ( 174 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.91 Sq.mts. ( 204 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop19.26 Sq.mts. ( 207 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.84 Sq.mts. ( 278 Sq.ft. )1
None Booked0% Booked
0% Booked
65 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BDec 202812101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.93 Sq.mts. ( 301 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK30.74 Sq.mts. ( 331 Sq.ft. )22
None Booked0% Booked
0% Booked
1RK18.84 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK37.41 Sq.mts. ( 403 Sq.ft. )24
None Booked0% Booked
0% Booked
2 BHK38.74 Sq.mts. ( 417 Sq.ft. )24
None Booked0% Booked
0% Booked
2 BHK39.83 Sq.mts. ( 429 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK44.29 Sq.mts. ( 477 Sq.ft. )12
None Booked0% Booked
0% Booked
96 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Raj Laxmi Developers
for Project
Shreeji Iconic
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation