Project overview

Shreeji Corner is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000033022. Shreeji Corner is located at Plot No 39,40,41 Sector 8. This is a New being developed by Shreeji Lifespaces Builders.

Shreeji Corner has 1 BHK, 1RK & 2 BHK Apartments with carpet areas ranging from 365 to 615 Sq.ft. Carpet. The Project has total 34 of which 0 are currently available for sale.

Shreeji Corner is being developed on a total land area of 8417 Sq.ft. Shreeji Corner has 1 Wings / Towers Shreeji Corner

ProjectDeveloperLocationPossession
Dipti Sky City Phase 2Dipti Home Makers Pvt Ltd54/3/B, 54/3/D, 57/1 Part30-06-2023 00:00:00
Snehal Paradise Wing AM/S Krishna DevelopersS No 2A H No 2B31-01-2020 00:00:00
Shree RajRajententerprisesSr No 39 H No 530-04-2019 00:00:00
Master BuildconMaster BuildconGut No 27 Plot No 1630-03-2022 00:00:00
Sai Tirth Phase IPinnacle CorporationS No. 2 H No 4/B Joveli Village Badlapur East 42150330-12-2023 00:00:00
J K KasturiJ.K.InfraS R No 130 Hissa No 330-12-2024 00:00:00
Mohankheda GreensRajeshkumar Moolchand RupawatSurvey No 38 Hissa No 330-12-2023 00:00:00
Ozone GalaxyHallmark Infra Realty Llp64/10, 65/1, 65/3A, 65/3B, 66/530-12-2025 00:00:00
Shubham Galaxy - B WingNavkar Associates4948 4949 4950 4954 A B And 4969 A B30-12-2023 00:00:00
Shafique Khatimiti TowerRameez Shahnawaz MajeedCts 126430-12-2021 00:00:00
ElementsUma RealtyC. S. No. 27/130-12-2023 00:00:00
Shree Siddhivinayak Park Wing A1 And A2Satyashiv DevelopersS No 66 H No 7 S No76 H No 5 Part30-12-2022 00:00:00
Sai PurabWestern Arch Developers9/1/230-09-2023 00:00:00
Akshar EvannaM/S Akshar Om ConstructionPlot No 137 Sector 53 Dronagiri Navi Mumbai28-02-2024 00:00:00
Rassaz Green Tower B And B1Rassaz Infrastructure Private Limited369/New69/Hn 1P 5A 370/New74/Hn2 3 4 5 6 7 371/New73/Hn5 377/New75/ 4P 7P 8P 9 10 11 12 1330-12-2026 00:00:00
PadmanabhYash Govinda Build Infra LlpTika No.10, C.T.S No.222B24-10-2023 00:00:00
Orchid A To LPalava Dwellers Pvt Ltd27Pt And 139/2 Pt30-06-2018 00:00:00
Tanisha HeightsM/S. Balaji DevelopersCts No. 1962-197230-03-2023 00:00:00
Vimal ShreeRitesh Ramesh JainOld Sno 215 Hno 1 New Sno 198 Hno 130-12-2023 00:00:00
Sai PalacePravin Narasi Manani3630-06-2022 00:00:00
Saishiv ComplexSaishiv ConstructionSurvey No 54 By 3 Hissa No 1 And 230-12-2023 00:00:00
Mhatre CompoundLodha Developers Limited85/2 Pt30-06-2018 00:00:00
Aastha River ViewAastha Buildcon3 And 4 / Sec 1830-12-2022 00:00:00
Patels Prayosha - Pramukh SadanSahajanand DevelopersSurvey No 39A Hissa No 1A And 1B30-12-2023 00:00:00
Bhakti ParkShivkrupa Enterprises730-03-2023 00:00:00
Priti ApartmentMahesh Mahadu Tare579 To 583 , 604 A And B30-12-2022 00:00:00
Raj Regalia Phase-1AAmrut Laxmi DevelopersS No. 54/3/E, 55/2, 55/330-06-2023 00:00:00
Swami Samarth ApartmentMhatre Developers1231A30-03-2023 00:00:00
Yashoghar ChsBhalchandra Vinayak Wadnerkar6616 To 6619 , 6623 To 662630-12-2021 00:00:00
Vishwajeet Precious Phase IAbhijeet PrideSurvey No 32, Suryve No 33/1(P), Survey No 30, Hissa No 12 A02-03-2025 00:00:00
Regency Park Iii Building No 2Johar Hasan ZojwallaCts No 575 S No 2 H No 9 And S No 2 H No 1/F/130-04-2024 00:00:00
Seasons SaharaSamarth Sai Builders & DevelopersS No 34 H No 14 S No 34 H No 1530-12-2023 00:00:00
IndrayaniM/S Vedant Chetana Enterprises NxS No.380, Cts No 133230-12-2023 00:00:00
HarmonyBuildman Construction225/831-12-2019 00:00:00
N G Valencia Phase IiRna Builders (Ng)S No 335/3 Part Old 338/10 New30-09-2020 00:00:00
VandanamMetro BuildconSurvey No 68Plot No 28 Hissa No 1P 3P 4P30-12-2021 00:00:00
Lodha Quality Home Tower 4Macrotech Developers Limited32/10P, 32/15P, 32/14P30-09-2024 00:00:00
Vishwajeet Pink CityGulabrao Baburao Karanjule PatilGut No.48, Plot No.15,19,23,24,25,26,27 And 3730-05-2025 00:00:00
Spm Lake City Phase Ii Part 1Kothari & Deshmukh Landmark LlpSurvey No 56 Hissa No 230-01-2026 00:00:00
Anantam HeightsKanak RealtyS.No.101, C.T.S No.328030-06-2024 00:00:00
Capmatrix SquareCapmatrix Buildcon LlpB-33, 33 Part15-12-2022 00:00:00
Lodha Panacea IiMacrotech Developers Limited240/5A Pt30-09-2023 00:00:00
Navare PlazaOm Developers8028 8029 803028-08-2022 00:00:00
Sai HeritageMitra HomesSurvey No 59 Hissa No 1 B30-03-2023 00:00:00
Shree Girijatmak Co Op Hou Soc LtdShree Saraswati DevelopersOld Survey No 47 Hissa No 2 Part Plot No 4 And 5 New Survey No 2/A/730-12-2021 00:00:00
Shreeman Residency B And C WingOm EnterprisesSurvey No 1 Hissa No 14/2, 14/1/230-12-2029 00:00:00
ValenciaImpressionsC T S No 2065 To 2068, 1465 And 146630-06-2024 00:00:00
Silver Creast Wing -A Phase - IiShrikrishna EnterprisesS No 83 H No 1430-03-2026 00:00:00
TiaraSagar EnterpriseS No 20 And Chalta No 2430-03-2024 00:00:00
Metro Aangan Phase - IMetro CreatorsS No 78 H No 7 P And 8 P30-12-2028 00:00:00
Prakruti SparshAvishkar BuildconS No 49, H No 10D30-12-2022 00:00:00
Arjun VillaManohar Sahebrao Kadam192-J230-03-2022 00:00:00
Dosti Greater Thane - Phase 1Adrika Developers Private Limited9/4 Pt,7/8 Pt,7/1Pt, 11/25Pt,11/23Pt,12/19Pt,7/13Pt,11/17Pt,11/12Pt,11/13Pt,11/7Pt,11/1Pt,11/8Pt,11/18Pt,11/19A Pt,11/19B Pt,11/15Pt,11/16Pt,11/14Pt,11/11Pt,12/9Pt,11/21Pt01-04-2026 00:00:00
Sadguru Nakshtra Phase ISadguru DevelopersSurvey No 1204A And Survey No 118330-12-2023 00:00:00
Banjara Hills Sector 7Seema Developers127, 408/1, 407/230-12-2022 00:00:00
Lodha Panacea IMacrotech Developers Limited55Pt31-12-2021 00:00:00
Gayatri EleganceGayatrikripa Developers Private LimitedOld Survey No. 229, Hissa No. 1330-12-2025 00:00:00
Shree Saishraddha Apartment Building AShree Saishraddha EnterprisesSurvey No 9/3 And 16/130-03-2023 00:00:00
Pinnacolo NxSkd Realty LlpOld S.No.445,New S.No.12930-06-2025 00:00:00
Sheth SupremeSheth Builders Private LimitedOld Survey No 159 Pt And New Survey No 20 Pt30-12-2024 00:00:00
One AksharAkshar RealtorsPlot No 730-12-2026 00:00:00
Vedant KalashShivalik DevelopersSurvey No 48 Hissa No 2 Plot No 5 And 630-03-2022 00:00:00
Akshar Business Park- Phase IiiAkshar DevelopersPlot No. 3, Sector-2531-07-2022 00:00:00
Swaraj OrchidM/S Crystal HomesSurvey No 25 Hissa No 230-12-2022 00:00:00
Surya ComplexM/S. Jai Santoshi Maa EnterprisesS. No. 102, H. No.2, 3 Pt, 5, 17, 1830-06-2023 00:00:00
Building No 1 PadmavatiM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2022 00:00:00
Swanand TarangM/S Omkar RealtorsSurvey No 43 Hissa No 230-12-2021 00:00:00
Shreeram ResidencyRaghunath Kedari Phadtare690/330-12-2025 00:00:00
Jagjeet EnclaveJagjeet Shrusti Realtors29/1/C04-05-2024 00:00:00
Zunera Heights786 Micron Builders & Developers101/ 2 3 4 5 1230-12-2022 00:00:00
19 EastMoreshwar Developers5230-12-2025 00:00:00
Reliance GoldGolden EnterprisesS No 58/1/4 S No 59/128-02-2028 00:00:00
Basera HeightsKamruddin Hasmullah SiddiqueOld Sno 223/5 221/1 New Sno 191/5 190/130-03-2024 00:00:00
Building No 2 Mahalakshmi A WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Jhalak Luxuria Phase IJhalak ConstructionsGut No 48 P Plot C, Cts No. 9353 P30-12-2021 00:00:00
Krishna GalaxyKrishna Builders & DevelopersSurvey No 42 Hissa No 230-06-2023 00:00:00
Villa SmaranOm Villa Buildtech LlpCts No 1194E And Cts No 1194A Sector 2930-03-2024 00:00:00
Virat MansionNeelyog DevelopersCts No 9907,9908 To 991330-12-2022 00:00:00
Siddhivinayak GardensA1 Buildcon991, 2, 3 And 1001830-12-2024 00:00:00
Shree ShaliniJay Service And ConsultantCts No 251 And 252A30-09-2023 00:00:00
M Square It ParkPaper FlutingsA241 And A24230-03-2024 00:00:00
Shree Ganesh SymphonyPawar GroupS. No.172, H.No.1/801-12-2025 00:00:00
Trimurti GardenSai Narayan DevelopersSurvey No 126 Hissa No 130-12-2025 00:00:00
Tulsi Aahan - B WingRaj GroupS No 39, H No 1,230-12-2022 00:00:00
Anantam - Phase IOyster Living Llp13/230-06-2022 00:00:00
Building No 2 Mahalakshmi B WingM/S. Sai Balaji Emrald RealtyOld S No 128, New S No 90, H No 3, Old S No 129, New S No 8930-12-2025 00:00:00
Amruta ChsUtkarsha Construction7462/70/2403-06-2022 00:00:00
Sai Shrushti SapphireSai Shrushti Enterprises136/1 P Sub Plot D30-12-2021 00:00:00
Umiya OasisUmiya Developers29 Hissa No 1 Survey No 30 Hissa 1,2,3A30-12-2029 00:00:00
Om Tanishq ResidencyM/S Laxmi RealtySurvey No 4, Hissa No 1A/230-03-2022 00:00:00
Amakin Mohammediyah Phase 3Amakin Mohammediyah Private Limited31/6 And 730-12-2024 00:00:00
Anantam - Phase IiOyster Living Llp18/1230-06-2022 00:00:00
Balaji AnnexM/S Om Swayambhu Siddhivinayak Builders And DevelopersSurvey No 93/3, 93/4, 93/530-12-2026 00:00:00
Arya ArianaAshapura Corporation5664/A30-03-2024 00:00:00
GajananGk BuildconB6330-06-2023 00:00:00
Riverview Classic Building No 4, Phase IvRutu BuildersS No 27, H No 5, 3/3 S No 28/ H. No 1,2,3,4/1,4/2,4/330-12-2022 00:00:00
Olivia PrimeSkyline Buildpro43/2B/3/230-06-2022 00:00:00
Rai S AaragyaRai Residency Private LimitedSurvey No 46 Hissa No 5 And 730-12-2026 00:00:00
Empire Industrial Centrum Phase-IiiEmpire Industries Limited22R30-03-2026 00:00:00
Empire Industrial Centrum Phase-IvEmpire Industries Limited2230-03-2025 00:00:00
Seasons Sahara Building No 2Samarth Sai Builders & DevelopersS No 24/2 At Village Adavli-Dhokli Taluka Ambernath And S No 34/10, 34/11, 34/12 At Village Pisavli Taluka Kalyan30-12-2024 00:00:00
Rajeshwari Residency Phase IiShree Siddhi ConstructionSurvey No 30/2, 30/3/2/1, 30/3/2/230-03-2025 00:00:00
Project Details
  • Project:
    Shreeji Corner
  • Location:
  • Plot No 39,40,41 Sector 8
  • Const. Stage:
    New
  • Possession:
    13 Jul 2024
Developer Details

  • Developer:
    Shreeji Lifespaces Builders
  • Phone:
  • Address:
  • The Great Eastern Summit
Project RERA Details
MAHA REARA No: P52000033022
Project Type Residential / Group Housing
RERA Project Status New
Architect Vastopati Design Group
Funding Bank HDFC BANK
Proposed Possession 13 Jul 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Feb 2022
Last Retrived 28 Jul 2025
Shreeji Corner QR Code
Shreeji Corner
MahaRERA - P52000033022
Apartment Details & Configuration
TypeArea
1 BHK46.12 Sq.mts. ( 496 Sq.ft. )
1 BHK47.91 Sq.mts. ( 516 Sq.ft. )
1 BHK33.92 Sq.mts. ( 365 Sq.ft. )
1RK39.45 Sq.mts. ( 425 Sq.ft. )
1RK40.75 Sq.mts. ( 439 Sq.ft. )
2 BHK51.5 Sq.mts. ( 554 Sq.ft. )
2 BHK51.59 Sq.mts. ( 555 Sq.ft. )
2 BHK52.7 Sq.mts. ( 567 Sq.ft. )
2 BHK52.79 Sq.mts. ( 568 Sq.ft. )
2 BHK53.77 Sq.mts. ( 579 Sq.ft. )
2 BHK54.39 Sq.mts. ( 585 Sq.ft. )
2 BHK55.44 Sq.mts. ( 597 Sq.ft. )
2 BHK56.46 Sq.mts. ( 608 Sq.ft. )
2 BHK57.11 Sq.mts. ( 615 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shreeji Cornerlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
100
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
8 Trees
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Cidco/Pmc Sewarage Line
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Cidco/Pmc Storm Water Drains
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
100
Water Supply
Cidco/Pmc Water Supply
Buildings / Wings in Shreeji Corner
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shreeji Corner by Shreeji Lifespaces Builderslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

8417 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

34 apartments in total
Total
34
Booked
34
Available
0

Saleable Area Statistics (Sq. ft.)

18920 Total
Total
18920
Booked
18920
Available
0
Total 34 apartments in project. 34 apartments booked. 100% apartments booked.
Total 18920 Sq.ft. saleable area. 18920 saleable area booked.
100% area booked.

Shreeji Corner

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shreeji CornerJun 20246001001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.12 Sq.mts. ( 496 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK47.91 Sq.mts. ( 516 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK33.92 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK39.45 Sq.mts. ( 425 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK40.75 Sq.mts. ( 439 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.5 Sq.mts. ( 554 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK51.59 Sq.mts. ( 555 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK52.7 Sq.mts. ( 567 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK52.79 Sq.mts. ( 568 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK53.77 Sq.mts. ( 579 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK54.39 Sq.mts. ( 585 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK55.44 Sq.mts. ( 597 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.46 Sq.mts. ( 608 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK57.11 Sq.mts. ( 615 Sq.ft. )2
2 Booked100% Booked
100% Booked
34 total apartments / 34 apartments booked. 100% apartments booked.
Work Description in Building Shreeji CornerCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shreeji Lifespaces Builders
for Project
Shreeji Corner
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation