Project overview

Shree Siddhivinayak Park B1 And B2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700050066. Shree Siddhivinayak Park B1 And B2 is located at S No 66 H No 7, S No 76 H No 5 Part. This is a New being developed by Satyashiv Developers.

Shree Siddhivinayak Park B1 And B2 has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 111 to 106 Sq.ft. Carpet. The Project has total 86 of which 84 are currently available for sale.

Shree Siddhivinayak Park B1 And B2 is being developed on a total land area of 54287 Sq.ft. Shree Siddhivinayak Park B1 And B2 has 2 Wings / Towers Shree Siddhi Vinayak Park B2,Shreesiddhi Vinayak Park B1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shree Siddhivinayak Park B1 And B2
  • Location:
  • S No 66 H No 7, S No 76 H No 5 Part
  • Const. Stage:
    New
  • Possession:
    31 Dec 2030
Developer Details

  • Developer:
    Satyashiv Developers
  • Phone:
  • Address:
  • Hasti Navjeevandeep Chs
Project RERA Details
MAHA REARA No: P51700050066
Project Type Residential / Group Housing
RERA Project Status New
Architect Madan V Sokande & Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2030
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 13 Mar 2023
Last Retrived 26 Jul 2025
Shree Siddhivinayak Park B1 And B2 QR Code
Shree Siddhivinayak Park B1 And B2
MahaRERA - P51700050066
Apartment Details & Configuration
TypeArea
1 BHK38.06 Sq.mts. ( 410 Sq.ft. )
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )
1 BHK38.89 Sq.mts. ( 419 Sq.ft. )
1 BHK44.57 Sq.mts. ( 480 Sq.ft. )
2 BHK50.34 Sq.mts. ( 542 Sq.ft. )
2 BHK56.11 Sq.mts. ( 604 Sq.ft. )
1 BHK37.22 Sq.mts. ( 401 Sq.ft. )
1 BHK37.34 Sq.mts. ( 402 Sq.ft. )
1 BHK37.68 Sq.mts. ( 406 Sq.ft. )
1 BHK38.38 Sq.mts. ( 413 Sq.ft. )
1 BHK38.62 Sq.mts. ( 416 Sq.ft. )
2 BHK50.05 Sq.mts. ( 539 Sq.ft. )
Shop9.84 Sq.mts. ( 106 Sq.ft. )
Shop10.33 Sq.mts. ( 111 Sq.ft. )
Shop12.4 Sq.mts. ( 133 Sq.ft. )
Shop13.17 Sq.mts. ( 142 Sq.ft. )
Shop15.32 Sq.mts. ( 165 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Siddhivinayak Park B1 And B2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Started
Landscaping & Tree Planting100% completed
95% Complete
All Done
Open Parking
Not Started
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Not Started
Buildings / Wings in Shree Siddhivinayak Park B1 And B2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Siddhivinayak Park B1 And B2 by Satyashiv Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

54287 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

86 apartments in total
Total
86
Booked
2
Available
84

Saleable Area Statistics (Sq. ft.)

36894 Total
Total
36894
Booked
957
Available
35937
Total 86 apartments in project. 2 apartments booked. 2% apartments booked.
Total 36894 Sq.ft. saleable area. 957 saleable area booked.
3% area booked.

Shree Siddhi Vinayak Park B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Siddhi Vinayak Park B2Dec 203081010141
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.06 Sq.mts. ( 410 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK38.55 Sq.mts. ( 415 Sq.ft. )7
1 BHK38.89 Sq.mts. ( 419 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK44.57 Sq.mts. ( 480 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.34 Sq.mts. ( 542 Sq.ft. )7
2 BHK56.11 Sq.mts. ( 604 Sq.ft. )7
None Booked0% Booked
0% Booked
36 total apartments / 2 apartments booked. 5% apartments booked.
Work Description in Building Shree Siddhi Vinayak Park B2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Shreesiddhi Vinayak Park B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shreesiddhi Vinayak Park B1Dec 203081010411
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.22 Sq.mts. ( 401 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.34 Sq.mts. ( 402 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK37.68 Sq.mts. ( 406 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK38.06 Sq.mts. ( 410 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK38.38 Sq.mts. ( 413 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK38.62 Sq.mts. ( 416 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK50.05 Sq.mts. ( 539 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop9.84 Sq.mts. ( 106 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.33 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.4 Sq.mts. ( 133 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.17 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.32 Sq.mts. ( 165 Sq.ft. )1
None Booked0% Booked
0% Booked
50 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Shreesiddhi Vinayak Park B1Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Satyashiv Developers
for Project
Shree Siddhivinayak Park B1 And B2
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation