Project overview

Shree Sai Pooja is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700002237. Shree Sai Pooja is located at 15/3. This is a Ongoing being developed by M/S Mahalaxmi Construction Co..

Shree Sai Pooja has 1 BHK, 2 BHK & SHOP Apartments with carpet areas ranging from 135 to 80 Sq.ft. Carpet. The Project has total 25 of which 16 are currently available for sale.

Shree Sai Pooja is being developed on a total land area of 9257 Sq.ft. Shree Sai Pooja has 1 Wings / Towers Shree Sai Pooja

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Jadhav MarketS J Construction CoS No 48 Hissa No 11P And Hissa No 14 And Hissa No 15P20-12-2021 00:00:00
Aruna UlhasGaondevi Developers49/10/3,431-08-2018 00:00:00
ShulpaniShree Balaji Builders & DevelopersS No 53 H No 1531-08-2018 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
Apte HomesShree Siddhi DevelopersSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Pranjee Garden City Phase -IiPranjee Properties Pvt. LtdPlot No 330-11-2018 00:00:00
Sonal Co-Op Housing SocietySoham Developers4918231-01-2019 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsSurvey No 13, Hissa No 231-12-2017 00:00:00
Ekdanta ApartmemtEashanya Builder And Developers421503, Thane31-12-2019 00:00:00
Sai Aangan - C WingShree Sai Chatra DevelopersS No 87 H No 5 P No 1 S No 87 H No 12 And 1331-12-2018 00:00:00
Thanekar ParadiseAjay Madhukar Thanekar81/1A30-12-2019 00:00:00
Motiram PuramNayan Dilip DalalSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
Evergreen Residency C WingBalaji ConstructionS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
Sai ShrutiPinnacle ConstructionsSurveyno 331-03-2018 00:00:00
Rubyana Residency Phase 1Sudhir Damodar GhatnekarSurvey No. 8930-06-2018 00:00:00
Vedant Imperial Abc Phase 1Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-11-2019 00:00:00
Samarth ParadiseS P DevelopersS No 21 H No 1331-12-2026 00:00:00
Nav Avani ChsMangalya InfraS. No. 51, H. No. 3/A/30, Plot No. 3031-01-2025 00:00:00
Mangalam ArcadeMangalam EnterprisesSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
Viraj IconicBonzer OrbitGut No.53/5, Plot No.1, Gut No.53/6,Plot No.2, Gut No.53/731-12-2026 00:00:00
Shreeji GreensDeep Laxmi AssociatesS No 70 H No 6A S No 70 H No 6B S No 73 H No 2 S No 73 H No 531-07-2026 00:00:00
AlankapuriAshish Waman GoleS.No 17/H.No 1 & H.No 8/Plot No. 101-05-2027 00:00:00
Shrihari Chandan ApartmentAbhishek Shelters LimitedCts No 1269, 127031-03-2028 00:00:00
Shivshakti PrimeShivshakti BuildconSurvey No-53 Hissa No- 4/130-09-2027 00:00:00
Ekdant SmaranPrashant Tukaram BaeetSurvey No. 41, H.No. 1, Plot No. 116-03-2021 00:00:00
Shivam GreensM.K.DevelopersGut No 5 Hissa No 6, 11 And 1330-12-2023 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesS No 105A, H No 4/2,3,431-03-2018 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
Shree Sai PoojaM/S Mahalaxmi Construction Co.15/331-12-2019 00:00:00
Blue Diamond ResidencyKimaya ConstructionSurvey No 61 Hissa No 331-12-2019 00:00:00
Satvik E WingJigar EnterprisesS No 39 H No 6 Pt Plot No 1 And 1201-12-2019 00:00:00
Sai AanganPinnacle RealtorsSurvey No 181/2/3/4A30-01-2023 00:00:00
Khatri NxAashiyana ConstructionsGut No 111 Hissa No 3, 41, 4231-12-2019 00:00:00
The Address Wing C Phase IiiSadguru AssociateGut No. 1 Hissa No 1/2, 3 & 3A31-12-2026 00:00:00
Soham NeelM/S Neel Siddhi Enterprises27/1/11 , Plot No. 831-03-2027 00:00:00
First EleganceGurupreet Singh Baldev Singh SandhuSurvey No 26, Hissa No2/A/23, Plot No 20, Shirgaon31-12-2025 00:00:00
Olive - Phase Iii - Pranjee Garden CityPranjee Properties Pvt. LtdPlot No. 5 Part30-06-2024 00:00:00
Prapti HeritageTridev Enterprises1/730-06-2025 00:00:00
Laxmi Shankar ComplexAditi Buildwell175 P30-06-2028 00:00:00
Sky HillSeven Hill Buildcon100/5A30-04-2019 00:00:00
LeelaanganPravin Kashinath Haware135/230-12-2022 00:00:00
Swami HighlandsShree Swami Samarth AssociatesSurvey No 10A Hissa No 5P,Plot No 10, 9A31-12-2019 00:00:00
Krishna HillsShree Omsai ConstructionThane, 40053131-07-2017 00:00:00
Ganesh HeightsShiv Builders And DevelopersGut No 53/1 And 53/2 Plot No. 11 And 1431-12-2019 00:00:00
Sai DarshanUnity Infratech17030-12-2020 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Nav Sai Chhaya Chs LtdNiket EnterprisesS No. 30 Final Plot No. H. No. 1/B1631-01-2020 00:00:00
Shubh AshishShubh BuildersS No 82 Hissa No 14-231-12-2019 00:00:00
Mohan Greenwoods Building 1Mohan Lifespaces LlpGut No 1Pt And 5Pt31-12-2019 00:00:00
Shree Ganesh Vyapari SankulRajdeep Builders And DevelopersS No48 Hissa No 831-03-2019 00:00:00
Trinity Galaxy R1 And R4Trinity DevelopersSurvey No 172 Hissa 13 14 1530-06-2018 00:00:00
Vedant Imperial D Phase 3Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-06-2023 00:00:00
Fulora Co-Op Housing Society LtdPinnacle CreatorsSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
Shiv Tirth B WingGajraj EnterprisesSr No 36 Hissa No 3P Cts No 37931-12-2025 00:00:00
Balaji HeritageBalaji DevelopersSurvey No.28A, Hissa No. 2/2C31-12-2024 00:00:00
Entilla By DevDev Konark CorporationSurvey No 98 Hissa No 4A30-09-2018 00:00:00
Bahinai BhuvanManoj Vasudev VaidyaCts No 22230-12-2020 00:00:00
NilgiriShivam DeveloperSurvey No 46 Hissa No 6A 19 Plot No 3230-05-2018 00:00:00
Shree Ashtavinayak Vastu PrakalpaBalkrishna Kashinath Bhoir5730-11-2019 00:00:00
Tulsi AnandAnand HomesSr No 72 H 231-12-2019 00:00:00
Sai Prasad PlazaSainath Shete421503, Thane31-12-2019 00:00:00
Shree AtharvAtharv EnterprisesS No 43 Hissa 1A31-12-2025 00:00:00
Sonal ParadiseShubh GroupGut No 84, Gut No 86/1/A31-12-2026 00:00:00
Mahalaxmi Ashish Co.Op. Housing Society Ltd.Vpm Developers17/3/5/A/5 Plot No 531-03-2025 00:00:00
Suraj Co.Op.Hsg.Soc.LtdAsd EnterprisesS No /Gut No 48/3 Plot No 6 To 1030-05-2024 00:00:00
Sunset Heights 2Alfa ConstructionsS No 121 H No 8/1 8/230-06-2022 00:00:00
Bhavani HeightsKalyani Enterprises99/430-12-2023 00:00:00
Sai FloraM/S Mitra Reality59, Hissa No 1 B Part31-12-2026 00:00:00
Vishwa Sky HighVineet InfrastructureSr No 7/A Hissa No 6/33,6/29,7/C,6/30/Kh,6/30/A Plot No 33,2924-11-2027 00:00:00
Shivam Paradise Phase IM K EnterprisesGut No 53 Hissa No 10 Plot No 7 And 831-12-2024 00:00:00
Om MoreshwarM/S Samruddhi Builders & DevelopersSurvey No 23,Hissa No .1,Plot No .6 & 731-12-2026 00:00:00
Jai Ganesh Co-Operative Housing Society LtdDeepali LandscapeSurvey No 42(P), Plot No H-1 (9 To 16 & 17 To 22)31-12-2026 00:00:00
Dbr ClassicDbr Constructions Pvt Ltd330-12-2021 00:00:00
Vedant Nakshatra M Phase 2Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B30-12-2025 00:00:00
Wing B-6 SwanandM K Patil DevelopersGut No 8 P31-12-2018 00:00:00
Patels HorizonParamyogi Developers LlpSurvey No 52 Hissa No3/318-11-2027 00:00:00
Shree Ganraj ResidencyOm Sai ConstructionS No 4,H No 1, P No 731-12-2025 00:00:00
Shri Jiveshwar ApartmentOmkar EnterprisesSurvey No. 33,Hissa No. 7,Plot No.8 & 906-12-2028 00:00:00
Project Details
  • Project:
    Shree Sai Pooja
  • Location:
  • 15/3
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    M/S Mahalaxmi Construction Co.
  • Phone:
  • Address:
  • Mahalaxmi Apt.,
Project RERA Details
MAHA REARA No: P51700002237
Project Type Others
RERA Project Status Ongoing
Architect Raj Associates Ar S R Khambayat
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 31 Jul 2017
Last Retrived 26 Jul 2025
Shree Sai Pooja QR Code
Shree Sai Pooja
MahaRERA - P51700002237
Apartment Details & Configuration
TypeArea
1 BHK25.58 Sq.mts. ( 275 Sq.ft. )
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )
1 BHK27.84 Sq.mts. ( 300 Sq.ft. )
1 BHK30.17 Sq.mts. ( 325 Sq.ft. )
2 BHK35.27 Sq.mts. ( 380 Sq.ft. )
SHOP6.34 Sq.mts. ( 68 Sq.ft. )
SHOP7.39 Sq.mts. ( 80 Sq.ft. )
SHOP12.5 Sq.mts. ( 135 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Sai Poojalast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Small Meter Room Provided Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
Tree Planting Work Has Been Complete
Open Parking100% completed
95% Complete
As Per Plan Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Municipal Sewerage Line Available Work Is In Progr
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Has Been Complete
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting Work Has Been Complete
Water Supply
M.J.P Will Provided Water Connection After Oc.
Buildings / Wings in Shree Sai Pooja
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Sai Pooja by M/S Mahalaxmi Construction Co.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

9257 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
9
Available
16

Saleable Area Statistics (Sq. ft.)

7157 Total
Total
7157
Booked
2850
Available
4307
Total 25 apartments in project. 9 apartments booked. 36% apartments booked.
Total 7157 Sq.ft. saleable area. 2850 saleable area booked.
40% area booked.

Shree Sai Pooja

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Sai PoojaDec 201951000234
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.58 Sq.mts. ( 275 Sq.ft. )5
2 Booked40% Booked
40% Booked
1 BHK27.45 Sq.mts. ( 295 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK27.84 Sq.mts. ( 300 Sq.ft. )5
1 Booked20% Booked
20% Booked
1 BHK30.17 Sq.mts. ( 325 Sq.ft. )4
2 Booked50% Booked
50% Booked
2 BHK35.27 Sq.mts. ( 380 Sq.ft. )4
2 Booked50% Booked
50% Booked
SHOP6.34 Sq.mts. ( 68 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP7.39 Sq.mts. ( 80 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.5 Sq.mts. ( 135 Sq.ft. )1
None Booked0% Booked
0% Booked
25 total apartments / 9 apartments booked. 36% apartments booked.
Work Description in Building Shree Sai PoojaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S Mahalaxmi Construction Co.
for Project
Shree Sai Pooja
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation