Project overview

Shree Sai Panache is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000216. Shree Sai Panache is located at Cts No 142 Hissa No 5. This is a New being developed by Gyandev Builders & Developers.

Shree Sai Panache has 1 BHK, 2 BHK, BASEMENT, OFFICE & SHOP Apartments with carpet areas ranging from 1116 to 886 Sq.ft. Carpet. The Project has total 29 of which 7 are currently available for sale.

Shree Sai Panache is being developed on a total land area of 6458 Sq.ft. Shree Sai Panache has 1 Wings / Towers Shree Sai Panache

ProjectDeveloperLocationPossession
Manas ResidencyManas EnterprisesSurvey No 57 Hissa No 231-12-2018 00:00:00
Shiv Parvati ResidencyShrikrishna DevelopersPardi No 193B Cts 6016 To 6026 6057 To 6073 6133 To 6134 9662 Mouje Kohoj Khutavali31-03-2019 00:00:00
Ashapura Builders And DevelopersAshapura Builders And DevelopersGut No. 54 Part, Plot No. 831-12-2017 00:00:00
Neels ResidencyS.A. Singh Builders And DevelopersSurvey No 85 Hissa No 2 B21-11-2018 00:00:00
Vedant VatikaVedant VentureSurvey No 63, Hissa No 4A8, Plot No 1331-12-2019 00:00:00
Shree Sai LeelaShree Sai Builders & DevelopersPlot No.6, S.No. 86/330-06-2018 00:00:00
NiloyShree Sai Builders & DevelopersCts No 437831-12-2019 00:00:00
Shree Sai PanacheGyandev Builders & DevelopersCts No 142 Hissa No 530-12-2020 00:00:00
Swami DhamShree Ayyappa Constructions4347 434830-06-2018 00:00:00
WoodlandShaurya Infra Builders And DevelopersPlot No.H-3, S.No.39P And 41P26-12-2018 00:00:00
Aashray Pearl Wing CAashraygroupSy No 55/130-05-2023 00:00:00
Britto HouseShree Sai Builders & DevelopersPlot No 5 Cts No 2269 To 2274 S No 166 Hisa No 1231-12-2018 00:00:00
Panvelkar CrownRahul Vijay PanvelkarCts No 932131-12-2018 00:00:00
Pramukh SadanSahajanand DevelopersSurvey No - 39A Hissa No-1A, 1B31-03-2019 00:00:00
Neelkrishna Amalgamated Project Of Neelam Chs Ltd And Krishna Milan Chs LtdOm Sai InfraPlot No 619 Cts No. 6822 To 6828 And 682931-03-2027 00:00:00
Ishwar Om TulsiIshwar RealityPlot No 6, S No 43/4/11, Cts No 8863/A31-12-2023 00:00:00
Ishwar New AmitIshwar DevelopersPlot No 8, Survey No 54/17/6, Cts No 665331-05-2025 00:00:00
Patel Residency NxNavnirman DevelopersSurvey No 2 Hissa No 4B30-07-2018 00:00:00
Patels ResidencyParam Builders And DevelopersSurvey No 5 Hissa No 19 Plot B31-03-2018 00:00:00
Patels PridePride InfrastructureSurveyno 25 Hissa No 23 Plot A And B31-12-2018 00:00:00
Ishwar EnclaveIshwar EnterprisesS No 540 Cts 1968P30-06-2018 00:00:00
Anita Cooperative Housing Society Ltd.Gyandev Builders & DevelopersPlot No. 7, Cts No. 9000, S. No. 33 6 Pt30-11-2020 00:00:00
HrishaYadav Bro''s ConstructionsS No 7A H No 1/2 Plot No 430-01-2022 00:00:00
Namaskar Co-Op Hsg SocietyV. R. BuildersPlot No 4 Gut No 5330-03-2023 00:00:00
Omkar TowerOmkar ConstructionPlot No 8, 931-12-2017 00:00:00
Sai ResidencyKalpavruksha DevelopersSurvey No 19 Hisssa No 231-12-2017 00:00:00
Patels SapphirePramukh DevelopersS.No.50, Hissa No.7, Cts No.7721B31-08-2024 00:00:00
Panvelkar GalaxyGeetai InfrastructurePlot No 399, C.T.S No 4709, Suryoday Co-Op Housing Society At Village Kansai Ambernath East29-02-2024 00:00:00
Patels FalconPramukh DevelopersPlot No. 583, Cts No. 7577 To 758330-06-2024 00:00:00
Omkar ApartmentOmkar Infra880/A31-12-2017 00:00:00
Sophia ApartmentAaria Enterprises421501, Thane15-04-2020 00:00:00
Mount ViewBalkrishna Kashinath BhoirSurvey No 67 H No 3A And Survey No 68 H No 9B31-12-2017 00:00:00
Mahavir Paradise , Phase - 1Mahavir EnterprisesS No 122/1 122/2 123/1 P30-12-2022 00:00:00
Radha Vasant Vihar Wing - R1Shiv Sagar Developers & BuildersSurvey No. 64 Hissa No. 5 Village Pale Taluka Ambernath Dist Thane30-03-2022 00:00:00
Vishwajeet EliteVishwajeet MeadowsGut No 32/2 Plot No 5,6,7 And 8 Cts 9572 Village Morivali Tal Ambernath31-12-2018 00:00:00
Pink City Trident Phase 2Ami InfraThane, 42150130-04-2020 00:00:00
Vardhaman HomesJay Ambe DevelopersGut No.22-Cts No.9317, Gut No 24-Cts No.932031-12-2018 00:00:00
Motiram Darshan NxMotiram Darshan NxGut No 27 Plot No 730-06-2019 00:00:00
Shanti GardenKamya EnterprisesSurvey No 6/1/5330-12-2021 00:00:00
Parijat Co Operative Housing Society Limited Phase IiRohra ConstructionsSurvey No 74 Hissa No 2 And 331-12-2018 00:00:00
Vastu Siddhi , Phase IiSiddhivinayak GroupS.No.1115/1A30-03-2023 00:00:00
Shree Galaxy HeightsV3 RealitySurvey No 133 Hissa No 1 B30-12-2022 00:00:00
Dreamland Co-Op Hsg Society Ltd.Vishwanath Panvelkar421501, Thane31-03-2022 00:00:00
Galaxy Trisha ApartmentShree Ganesh DevelopersCts No 68/1 S.No 27/214-08-2018 00:00:00
DhavlgiriPerfect Builders877630-04-2018 00:00:00
Aashray AanandAashray Infra140/2A And 141/1B30-05-2023 00:00:00
MansarovarRk Construction161/231-12-2018 00:00:00
Victoria House Phase ILifespace Realty935430-06-2018 00:00:00
Jainam ResidencyKbp CorporationSno 49 Hno 2C- Plot-A2 , Sno 65 Hno 1B - Plot A30-01-2021 00:00:00
Yogi NiwasElite InfrastructureSurvey No 39A Hissa No 1A30-06-2018 00:00:00
Yashodhara Co-Op Housing SocietySuresh Keshavrao Yashvantrao20131-01-2021 00:00:00
Sanjeevani Co-Op Housing Society LtdSiddhartha ConstructionsPlot No 18 Cts No 8851 Survey No 43A( New S No 43/1/34) Hissa No A/12 & 1/1 (Pt)31-12-2026 00:00:00
Patels AspirePramukh DevelopersSurvey No.50 Hissa No.6 Cts No.7749 To 7754 (Part) Survey No.50 Hissa No.13 Cts No.7746 To 7748 And 7754 (Part)31-12-2026 00:00:00
Tulsi VatikaShri Kalki EnterprisesSurvey No. 13/1 , Hissa No.17/1231-03-2030 00:00:00
Dalal KalashAdvance BuildconPlot No 1 And 2, Village Morivali, Survey No. City Survey No. 916831-12-2027 00:00:00
Ishwar GajananIshwar RealityPlot No 9 Survey No 33 H No 6 Cts 9001 Vadavali Ambernath 42150131-12-2027 00:00:00
Manav Sangeet ChsConcept DevelopersPlot No17/18 Cts No 9005/B/17 And Cts No 9005/B/1831-12-2027 00:00:00
Saburi ChsMarathe EnterprisesPlot No 507, Cts No. 7277 To 727931-12-2027 00:00:00
Patels EmeraldPramukh InfrastructuresSurvey No 38A Plot No 22930-06-2024 00:00:00
Ram AmbarPramukh InfraconSurvey No 60 Hissa No 12 Cts No 899630-06-2025 00:00:00
Ishwar ShubhlaxmiIshwar RealityPlot No 22 Cts No6653p31-12-2021 00:00:00
Golden HeightsJainam RealtyPlot No. 500, Cts No. 7307, Survey No. 15/231-12-2027 00:00:00
Ashok SmrutiAsha ConstructionPlot No- 2, Cts No- 8987, Survey No- 33/6/1730-09-2026 00:00:00
Soman Shrishti VillaSoman Sons Nirmaan LlpCts No 7462, S. No. 38 Ch31-12-2029 00:00:00
Soman Shrishti ASoman Sons Nirmaan LlpCts No 7462, S. No. 38 Ch31-12-2029 00:00:00
Hill Park Co-Operative Housing Society LimitedUnigrow On Infrastructure Housing LlpCts No 8971/22 And Cts No 8971/2331-08-2028 00:00:00
Kamini A Wing Co-Operative Housing Society LtdShreeyansh Builders And Developers896031-12-2027 00:00:00
Patels AstrumNexa Construction LlpS No.38/A Plot No.23730-04-2027 00:00:00
Kher EnclaveAmi PropertiesPlot No 557, Cts No 7596 And 759731-12-2026 00:00:00
Project Details
  • Project:
    Shree Sai Panache
  • Location:
  • Cts No 142 Hissa No 5
  • Const. Stage:
    New
  • Possession:
    30 Dec 2020
Developer Details

  • Developer:
    Gyandev Builders & Developers
  • Phone:
  • Address:
  • Royal Jewels
Project RERA Details
MAHA REARA No: P51700000216
Project Type Residential / Group Housing
RERA Project Status New
Architect Mahesh Jagtap And Associates
Funding Bank IDBI BANK
Proposed Possession 30 Dec 2020
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 10 Jul 2017
Last Retrived 26 Jul 2025
Shree Sai Panache QR Code
Shree Sai Panache
MahaRERA - P51700000216
Apartment Details & Configuration
TypeArea
1 BHK23.39 Sq.mts. ( 252 Sq.ft. )
1 BHK28.29 Sq.mts. ( 305 Sq.ft. )
1 BHK31.659 Sq.mts. ( 341 Sq.ft. )
1 BHK32.492 Sq.mts. ( 350 Sq.ft. )
2 BHK34.38 Sq.mts. ( 370 Sq.ft. )
2 BHK35.805 Sq.mts. ( 385 Sq.ft. )
2 BHK45.21 Sq.mts. ( 487 Sq.ft. )
2 BHK45.75 Sq.mts. ( 492 Sq.ft. )
BASEMENT42.92 Sq.mts. ( 462 Sq.ft. )
BASEMENT24.54 Sq.mts. ( 264 Sq.ft. )
BASEMENT13.198 Sq.mts. ( 142 Sq.ft. )
BASEMENT14.23 Sq.mts. ( 153 Sq.ft. )
BASEMENT18.87 Sq.mts. ( 203 Sq.ft. )
BASEMENT103.725 Sq.mts. ( 1116 Sq.ft. )
OFFICE45.09 Sq.mts. ( 485 Sq.ft. )
OFFICE33.58 Sq.mts. ( 361 Sq.ft. )
OFFICE31.65 Sq.mts. ( 341 Sq.ft. )
OFFICE82.32 Sq.mts. ( 886 Sq.ft. )
OFFICE37.77 Sq.mts. ( 407 Sq.ft. )
SHOP13.19 Sq.mts. ( 142 Sq.ft. )
SHOP36.07 Sq.mts. ( 388 Sq.ft. )
SHOP31.43 Sq.mts. ( 338 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Sai Panachelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Completed
Energy management100% completed
95% Complete
Work Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Work Completed
Landscaping & Tree Planting100% completed
95% Complete
Work Completed
Open Parking100% completed
95% Complete
Work Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Work Completed
Water Supply100% completed
95% Complete
Work Completed
Buildings / Wings in Shree Sai Panache
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Sai Panache by Gyandev Builders & Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6458 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

29 apartments in total
Total
29
Booked
22
Available
7

Saleable Area Statistics (Sq. ft.)

10961 Total
Total
10961
Booked
8137
Available
2824
Total 29 apartments in project. 22 apartments booked. 75% apartments booked.
Total 10961 Sq.ft. saleable area. 8137 saleable area booked.
74% area booked.

Shree Sai Panache

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Sai PanacheJun 202061100270
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.39 Sq.mts. ( 252 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK28.29 Sq.mts. ( 305 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK31.659 Sq.mts. ( 341 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK32.492 Sq.mts. ( 350 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK34.38 Sq.mts. ( 370 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK35.805 Sq.mts. ( 385 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK45.21 Sq.mts. ( 487 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK45.75 Sq.mts. ( 492 Sq.ft. )2
1 Booked50% Booked
50% Booked
BASEMENT42.92 Sq.mts. ( 462 Sq.ft. )1
1 Booked100% Booked
100% Booked
BASEMENT24.54 Sq.mts. ( 264 Sq.ft. )1
1 Booked100% Booked
100% Booked
BASEMENT13.198 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
BASEMENT14.23 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
BASEMENT18.87 Sq.mts. ( 203 Sq.ft. )1
1 Booked100% Booked
100% Booked
BASEMENT103.725 Sq.mts. ( 1116 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE45.09 Sq.mts. ( 485 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE33.58 Sq.mts. ( 361 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE31.65 Sq.mts. ( 341 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE82.32 Sq.mts. ( 886 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE37.77 Sq.mts. ( 407 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.19 Sq.mts. ( 142 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP36.07 Sq.mts. ( 388 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.87 Sq.mts. ( 203 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.23 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP24.54 Sq.mts. ( 264 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP31.43 Sq.mts. ( 338 Sq.ft. )1
1 Booked100% Booked
100% Booked
29 total apartments / 22 apartments booked. 75% apartments booked.
Work Description in Building Shree Sai PanacheCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Gyandev Builders & Developers
for Project
Shree Sai Panache
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation