Project overview

Shree Ganesh Krupa Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000034691. Shree Ganesh Krupa Residency is located at Survey No 70C H No 1 To 5. This is a New being developed by Nutan Construction Co.

Shree Ganesh Krupa Residency has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 126 to 567 Sq.ft. Carpet. The Project has total 60 of which 50 are currently available for sale.

Shree Ganesh Krupa Residency is being developed on a total land area of 15507 Sq.ft. out of which 1673 Sq.ft. i.e 11% is reserved for recreational purposes. Shree Ganesh Krupa Residency has 1 Wings / Towers Shree Ganesh Krupa Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shree Ganesh Krupa Residency
  • Location:
  • Survey No 70C H No 1 To 5
  • Const. Stage:
    New
  • Possession:
    02 Sep 2026
Developer Details

  • Developer:
    Nutan Construction Co
  • Phone:
  • Address:
  • Kailash Mansarovar
Project RERA Details
MAHA REARA No: P99000034691
Project Type Others
RERA Project Status New
Architect Ajay Wade And Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 02 Sep 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 16 Feb 2024
Last Retrived 28 Jul 2025
Shree Ganesh Krupa Residency QR Code
Shree Ganesh Krupa Residency
MahaRERA - P99000034691
Apartment Details & Configuration
TypeArea
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )
1 BHK39.31 Sq.mts. ( 423 Sq.ft. )
1 BHK39.71 Sq.mts. ( 427 Sq.ft. )
2 BHK48.06 Sq.mts. ( 517 Sq.ft. )
2 BHK52.66 Sq.mts. ( 567 Sq.ft. )
Shop11.73 Sq.mts. ( 126 Sq.ft. )
Shop14.4 Sq.mts. ( 155 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Ganesh Krupa Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Vvcmc Policy
Landscaping & Tree Planting
Will Be Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Provided
Solid Waste Management And Disposal
Will Be Provided
Storm Water Drains
Will Be Done
Street Lighting
Will Be Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Will Be Done
Water Supply
Will Be Provided
Buildings / Wings in Shree Ganesh Krupa Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Ganesh Krupa Residency by Nutan Construction Colast updated on 28 Jul 2025 as per information obtained from MARA RERA.

15507 Sq. ft.

Project Area

1673 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

60 apartments in total
Total
60
Booked
10
Available
50

Saleable Area Statistics (Sq. ft.)

26502 Total
Total
26502
Booked
4338
Available
22164
Total 60 apartments in project. 10 apartments booked. 16% apartments booked.
Total 26502 Sq.ft. saleable area. 4338 saleable area booked.
16% area booked.

Shree Ganesh Krupa Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shree Ganesh Krupa ResidencyFeb 202616101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )15
1 BHK39.31 Sq.mts. ( 423 Sq.ft. )13
4 Booked30% Booked
30% Booked
1 BHK39.71 Sq.mts. ( 427 Sq.ft. )13
4 Booked30% Booked
30% Booked
2 BHK48.06 Sq.mts. ( 517 Sq.ft. )15
2 BHK52.66 Sq.mts. ( 567 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop11.73 Sq.mts. ( 126 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop14.4 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
60 total apartments / 10 apartments booked. 16% apartments booked.
Work Description in Building Shree Ganesh Krupa ResidencyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress47% done
47% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress20% done
20% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Nutan Construction Co
for Project
Shree Ganesh Krupa Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation