Project overview

Shree Gajanan Fortune City is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700013810. Shree Gajanan Fortune City is located at Survey No 65 P. This is a New being developed by Arun Balu Patil.

Shree Gajanan Fortune City has 1 BHK FLAT & 2 BHK FLAT Apartments with carpet areas ranging from 364 to 510 Sq.ft. Carpet. The Project has total 463 of which 270 are currently available for sale.

Shree Gajanan Fortune City is being developed on a total land area of 182988 Sq.ft. out of which 18536 Sq.ft. i.e 10% is reserved for recreational purposes. Shree Gajanan Fortune City has 8 Wings / Towers Building A,Building B,Building C,Building D,Building E,Building E1,Building F,Building G

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shree Gajanan Fortune City
  • Location:
  • Survey No 65 P
  • Const. Stage:
    New
  • Possession:
    30 Dec 2024
Developer Details

  • Developer:
    Arun Balu Patil
  • Phone:
  • Address:
  • Patel Plaza
Project RERA Details
MAHA REARA No: P51700013810
Project Type Others
RERA Project Status New
Architect Sachin Dilip Gulve
Funding Bank
Proposed Possession 30 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Feb 2025
Last Retrived 26 Jul 2025
Shree Gajanan Fortune City QR Code
Shree Gajanan Fortune City
MahaRERA - P51700013810
Apartment Details & Configuration
TypeArea
1 BHK FLAT33.79 Sq.mts. ( 364 Sq.ft. )
1 BHK FLAT34.8 Sq.mts. ( 375 Sq.ft. )
2 BHK FLAT47.35 Sq.mts. ( 510 Sq.ft. )
SHOP10 Sq.mts. ( 108 Sq.ft. )
1 BHK FLAT30.98 Sq.mts. ( 333 Sq.ft. )
1 BHK FLAT33.54 Sq.mts. ( 361 Sq.ft. )
1 BHK FLAT33.62 Sq.mts. ( 362 Sq.ft. )
1 BHK FLAT33.71 Sq.mts. ( 363 Sq.ft. )
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )
1 BHK FLAT52.97 Sq.mts. ( 570 Sq.ft. )
1 BHK FLAT35.21 Sq.mts. ( 379 Sq.ft. )
1 BHK FLAT37.62 Sq.mts. ( 405 Sq.ft. )
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )
1 BHK53.69 Sq.mts. ( 578 Sq.ft. )
Shop9.03 Sq.mts. ( 97 Sq.ft. )
Shop11.85 Sq.mts. ( 128 Sq.ft. )
Shop13.77 Sq.mts. ( 148 Sq.ft. )
Shop14.36 Sq.mts. ( 155 Sq.ft. )
Shop19.8 Sq.mts. ( 213 Sq.ft. )
1 BHK53.39 Sq.mts. ( 575 Sq.ft. )
1 BHK FLAT31.05 Sq.mts. ( 334 Sq.ft. )
1 BHK FLAT31.9 Sq.mts. ( 343 Sq.ft. )
1 BHK FLAT33.2 Sq.mts. ( 357 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Gajanan Fortune Citylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply40% completed
40% Complete
Work In Progress
Water Conservation, Rain water Harvesting25% completed
25% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Work Not Started Yet
Street Lighting40% completed
40% Complete
Work In Progress
Storm Water Drains5% completed
5% Complete
Work In Progress
Solid Waste Management And Disposal
Work Not Started Yet
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started Yet
Open Parking20% completed
20% Complete
Work In Progress
Landscaping & Tree Planting50% completed
50% Complete
Work In Progress
Fire Protection And Fire Safety Requirements
Work Not Started Yet
Energy management5% completed
5% Complete
Work In Progress
Electrical Meter Room, Sub-Station, Receiving Station20% completed
20% Complete
Work In Progress
Community Buildings70% completed
70% Complete
Work In Progress
Aggregate area of recreational Open Space20% completed
20% Complete
Work In Progress
Buildings / Wings in Shree Gajanan Fortune City
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Gajanan Fortune City by Arun Balu Patillast updated on 26 Jul 2025 as per information obtained from MARA RERA.

182988 Sq. ft.

Project Area

18536 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

463 apartments in total
Total
463
Booked
193
Available
270

Saleable Area Statistics (Sq. ft.)

182760 Total
Total
182760
Booked
72835
Available
109924
Total 463 apartments in project. 193 apartments booked. 41% apartments booked.
Total 182760 Sq.ft. saleable area. 72835 saleable area booked.
40% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building ADec 2023510001400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT33.79 Sq.mts. ( 364 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 BHK FLAT34.8 Sq.mts. ( 375 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK FLAT47.35 Sq.mts. ( 510 Sq.ft. )18
12 Booked66% Booked
66% Booked
SHOP10 Sq.mts. ( 108 Sq.ft. )10
4 Booked40% Booked
40% Booked
40 total apartments / 25 apartments booked. 62% apartments booked.
Work Description in Building Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BMar 2023510001400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT30.98 Sq.mts. ( 333 Sq.ft. )3
1 Booked33% Booked
33% Booked
1 BHK FLAT33.54 Sq.mts. ( 361 Sq.ft. )20
9 Booked45% Booked
45% Booked
1 BHK FLAT33.62 Sq.mts. ( 362 Sq.ft. )16
14 Booked87% Booked
87% Booked
1 BHK FLAT33.71 Sq.mts. ( 363 Sq.ft. )20
15 Booked75% Booked
75% Booked
59 total apartments / 39 apartments booked. 66% apartments booked.
Work Description in Building Building BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building CMar 2023510001400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT30.98 Sq.mts. ( 333 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK FLAT33.54 Sq.mts. ( 361 Sq.ft. )20
10 Booked50% Booked
50% Booked
1 BHK FLAT33.62 Sq.mts. ( 362 Sq.ft. )16
13 Booked81% Booked
81% Booked
1 BHK FLAT33.71 Sq.mts. ( 363 Sq.ft. )20
11 Booked55% Booked
55% Booked
59 total apartments / 37 apartments booked. 62% apartments booked.
Work Description in Building Building CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building DDec 2023510001400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.64 Sq.mts. ( 405 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK FLAT52.97 Sq.mts. ( 570 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK FLAT35.21 Sq.mts. ( 379 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK FLAT37.62 Sq.mts. ( 405 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building EDec 2023510001400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK53.69 Sq.mts. ( 578 Sq.ft. )28
None Booked0% Booked
0% Booked
Shop9.03 Sq.mts. ( 97 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop11.85 Sq.mts. ( 128 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.77 Sq.mts. ( 148 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop14.36 Sq.mts. ( 155 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop19.8 Sq.mts. ( 213 Sq.ft. )2
None Booked0% Booked
0% Booked
66 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building Building ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress45% done
45% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building E1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building E1Mar 20238100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.61 Sq.mts. ( 383 Sq.ft. )28
12 Booked42% Booked
42% Booked
1 BHK53.39 Sq.mts. ( 575 Sq.ft. )28
Shop9.03 Sq.mts. ( 97 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop11.85 Sq.mts. ( 128 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop13.77 Sq.mts. ( 148 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop14.36 Sq.mts. ( 155 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop19.8 Sq.mts. ( 213 Sq.ft. )2
None Booked0% Booked
0% Booked
66 total apartments / 21 apartments booked. 31% apartments booked.
Work Description in Building Building E1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress83% done
83% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building FMar 2023510001400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT31.05 Sq.mts. ( 334 Sq.ft. )45
19 Booked42% Booked
42% Booked
1 BHK FLAT31.9 Sq.mts. ( 343 Sq.ft. )14
6 Booked42% Booked
42% Booked
1 BHK FLAT33.2 Sq.mts. ( 357 Sq.ft. )5
5 Booked100% Booked
100% Booked
64 total apartments / 30 apartments booked. 46% apartments booked.
Work Description in Building Building FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building GMar 2023510001370
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT33.79 Sq.mts. ( 364 Sq.ft. )12
11 Booked91% Booked
91% Booked
1 BHK FLAT34.8 Sq.mts. ( 375 Sq.ft. )17
11 Booked64% Booked
64% Booked
2 BHK FLAT47.35 Sq.mts. ( 510 Sq.ft. )24
18 Booked75% Booked
75% Booked
53 total apartments / 40 apartments booked. 75% apartments booked.
Work Description in Building Building GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Arun Balu Patil
for Project
Shree Gajanan Fortune City
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation